| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹2.0 LAccepted-AOC | Ist | Accepted-AOC L-1 Bidder | |
| 2 | IInd₹2.0 LRejected-Finance | IInd | Rejected-Finance L-2 Bidder | |
| 3 | IIIrd₹2.0 LRejected-Finance | IIIrd | Rejected-Finance L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 Sept 2019, 12:00 pmClosed
SE, ETC, Varanasi
Bhikharipur, DLW, Varanasi
HALF YEARLY MAINTENANCE OF SCADA SYSTEM(ERL MAKE)
2019_UPTCL_383124_1
Short Term E-Tender No. 84/2019-20/ETC/VNS
Open Tender
Electrical Works
Item Wise
30 days
132 KV SUBSTATION KAITHI
Fee/EMD/PAN/GST Registration and work Exeperince
2 documents required · 2 mandatory
₹236
SE, ETC, Varanasi
₹2,000
21 Nov 2020
19 Sept 2019
27 Sept 2019
19 Sept 2019
27 Sept 2019
22 Sept 2019
Amount
Monthly SCADA Maintenance of 132kV Kaithi S/s. :-
SCADA IEC61850 Client-Server topology testing for smooth operation of Equipment. IEC-60870-5-101 SCADA over Serial communication protocol for SLDC Data needs to be checked for data packets sending with real time and its remote tripping from SLDC. IEC-60870-5-104 SCADA over RJ45 communication protocol for SLDC Data needs to be checked for data packets sending with real time and its remote tripping from SLDC. Modbus RTU communication testing for Metering parameters from energy meters. DNP-3 over RJ45 communication protocol for SLDC Data needs to be checked for data packets sending with real time and its remote tripping from SLDC. IEC61850 Relay Healthiness/communication link testing from SCADA HMI. Testing and rectification of CRP signals to SCADA HMI like, equipment isolators, Earth switch, Circuit Breakers and CTs & PTs from field to SCADA HMI as per approved schematics. SCADA operation healthiness checking of primary equipment like isolators, Earth switch, Circuit Breakers. BCU operation healthiness checking from IEDs to Primary equipment. SCADA HMI soft interlocks and its logic from BCUs to each feeder in Local/Remote mode and its healthiness checking for smooth operation for future. Checking of buffered/Unbuffered Reports of SCADA. To avoid interruption in SCADA system and its backup storage of Hot and standby SCADA HMI-1/2 will be recovered. Communication System architecture and fiber optics path between IEDs/BCUs to SCADA HMI-1/2 healthiness checking. 13.Replacing the damaged/faulty fiber patch cables for smooth operation of the System. Checking of events, alarm, SOE and reports of integrating system with time stamping. GPS synchronization healthiness checking with BCUs/relays
Emergency maintenance of SCADA System:-
Rectification of problem in 48 hrs from Remote/on site, the time of intimation as per direction of supervising engineer. Like, Data is stopped due communication link break to SLDC, System Crash and any Hardware failure in SCADA system
rbs engineering
TIRUPATI ALLIED SERVICE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .