Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 2₹4.0 L+₹29,690 (7.93%)Accepted-Finance | 2 | Accepted-Finance Accepted | |
| 3 | 3₹5.8 L+₹2.1 L (55.9%)Accepted-Finance | 3 | Accepted-Finance Accepted | |
| 4 | 4₹6.4 L+₹2.7 L (71.1%)Accepted-Finance 159 B YASHODA NAGAR KIDWAI NAGAR KANPUR NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | 4 | Accepted-Finance Accepted |
Tender Value
₹6.7 L
EMD Value
₹7,000
Closing Date
16 Feb 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC-I, Kanpur
SE ETC-I, Kanpur
Work
2022_UPTCL_675371_1
ET-110/ETC-I(K)/2021-22
Open Tender
Electrical Works
Fixed-rate
365 days
Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹826
PNB Account No 0727002100004177
₹7,000
25 Feb 2022
2 Feb 2022
17 Feb 2022
2 Feb 2022
16 Feb 2022
2 Feb 2022
120 days
Amount
Tower to Tower ground patrolling of 400 KV Panki-Unnao S/C Transmission Line by skilled persons for examining the towers, disc insulators, vibration dampers, Opgw, foundations and positions of corridor of the line including cutting/trimming of all kind tree & tree branches with the help of rope, tractor & skilled labour in presence of supervisor , falling near & below in distance of 26mtr both side from centre of line, removal of bird nests and climbers from tower structure and reporting the same to concerned SDO/JE on prescribed perform of patrolling.Above work is to be carried out by adhering due precautions, care and safety of men and material and avoiding damage of crops, building, power line etc. For patrolling work all labour, skilled technician, Literate staff/Supervisor duly equipped with binocular of line is to be done By every Three Month basis at 04 times in a year, Total length of line 48.7 Km (48.7x4=194.8Km).
Replacement of Stolen/missing members including carriage, fabrication, fixing and welding of Nuts and Bolts and dismantling of remaining cut pices of theft tower parts, including cost of all required labour, T&P, Vehicle for carriage required for completion of work in the 400KV Panki-Unnao Line.
Emergency based Tower to Tower ground patrolling on observed of Tripping/Breakdown of 400 KV Transmission Line. Contractor has to carried out ground work i.e. lopping/Chopping of trees infringing to corridor, identification of missing tower parts, Nuts & Bolts Faulty discs insulator, damaged conductor, tower earthing and other dangerous aspects observed in the line. Patrolling will be started from panki to the place of fault. The report must be submitted in division/ sub division immediately after patrolling. For patrolling work all labour, skilled technician, literate staff/supervisor duly equpipped with binocular, T&P, Vehicle etc. is to be arranged by the contractor at his own cost, Contractor has to started the emergency patrolling as and when intimation is given by concerned SDO/JE.
Thermal scanning of all section tower of 400 KV Panki-Unnao line during peak hours to identify hot point in nut bolt of tension fitting/dead end/jumper cone of all R,Y,B phase. The thermal scanning camera of latest version/model of reputed make shall be arranged by agency at his own cost.The work also includes submitting of hot point report in division/sub division of all section tower with phase within 02 days after completion of thermal scanning.
Checking and tightening of all three phase jumpers at both end of section tower of 400 KV Panki-Unnao line including replacement of sparked nuts and bolts by climbing on tower including the cost of transporation and T&P (Total section tower-31Nos.).
Attending breakdown due to failure of disc insulator/Polymer and replacement of Tension/Suspension string along with mobilization of skilled gang including carriage of material from store to site and site to store for completion of work.
Tension String (160 KN Disc Insulator)
Suspension String (120 KN Disc Insulator)
Removal of shrubs climbers from tower legs and checking of cupping, cleaning of soil from cupping & cleaning of area coming in between four legs of tower at various locations of above line and submitted report (4 legs=1Job).
SHUBHAM ELECTRICALS
Indra Enterprises
TRANS ENGINEEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .