Tender Value
₹65 L
EMD Value
₹5.3 L
Closing Date
28 Sept 2026, 12:00 pm5d left
Superintending Engineer
Suprintending Engineer, Budaun/Pilibhit Circle, PWD, Bareilly.
Construction of 2x3 mt Span Minor Bridge with Approach Road Additional Approach and Protection Work On Mudiya to Mohammad Nagar Hote Hue Rammurti ke Tubewell Ke Pass Road in financial Year 2026-27
2026_CEBLY_1187060_1
6139/Nivida (E.T)/2026-24 Date 05-09-2026
Open Tender
Civil Works - Others
Percentage
120 days
CD-2 PWD Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.3 L
Yes
Bareilly
28 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from brrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 30 m per Technical Specification Clause 301.5 ( Carted earth 5 km) | - | cum | 200 | - |
| 2 | Construction of embankment with approved material obtained from brrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 30 m per Technical Specification Clause 301.5 | 1,100 | cum | 71 | ₹78,100 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. | 190 | cum | 3,300 | ₹6,27,000 |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405) | - | cum | 4,050 | - |
| 5 | Construction of un-reinforced dowel jointed at expension and construction joint only, plain cement concrete pavement,thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregates and exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side from work (steel channel, laying and fixing of 125 micron thick polythene film , wedges,steel plates including levelling the form work as per drawing),spreading the concrete with shovels ,rakes,compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of complete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause (1501) | 193 | cum | 8,000 | ₹15,44,000 |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1 | 140 | cum | 60 | ₹8,400 |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1 (With Carted earth) | 145 | cum | 170 | ₹24,650 |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 238 | cum | 59 | ₹14,042 |
| 9 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and MORT&H sr. 12.08 Technical Specifications 1500,1700 & 2100. (M-15) | 27.5 | cum | 6,900 | ₹1,89,750 |
| 10 | Providing and Laying reinforced cement concrete in superstructure as per drawings and technical specification Clause 800,1205.4 &1205.5(M30) | 157.09 | cum | 7,500 | ₹11,78,175 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
T2_1.pdf
Tender Documents • 2.57 MB
BOQ_2234824.xls
BOQ • 0.33 MB
datese.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .