| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹42.0 LAccepted-AOC 45 YANI SARANI ROOM NO 2 KOLKATA 700104 WEST BENGAL | 24 PARAGANAS SOUTH | WEST BENGAL | 700104 | L-1 | Accepted-AOC Being lowest L-1 bidder | |
| 2 | L-2₹46.8 L+₹4.8 L (11.5%)Rejected-Finance | L-2 | Rejected-Finance Other than lowest bidder | |
| 3 | L-3₹46.9 L+₹4.9 L (11.7%)Rejected-Finance 30 SHIVTALLA STREET KOLKATA 700 007 | KOLKATA | KOLKATA | WEST BENGAL | 700007 | L-3 | Rejected-Finance Other than lowest bidder | |
| 4 | L-4₹47.5 L+₹5.5 L (13.2%)Rejected-Finance 34 C R AVENUE JABAKUSUM HOUSE 3RD FLOOR ROOM NO 312 KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | L-4 | Rejected-Finance Other than lowest bidder | |
| 5 | L-5₹49.4 L+₹7.4 L (17.6%)Rejected-Finance 110 5 BONOMALI NASKAR ROAD BEHALA PARNASHREE PARNASHREE KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L-5 | Rejected-Finance Other than lowest bidder |
Tender Value
₹42.0 L
EMD Value
₹83,980
Closing Date
25 Jan 2025, 6:00 pmClosed
Garrison Engineer Alipore
NO 1 NATIONAL LIBRARY AVENUE, ALIPORE, KOLKATA 700027
REPAIR/ MAINT OF MECHANICAL LAUNDRY PLANT, BOILER PLANT AND AUTOCLAVE MACHINE, DRY CLEANING MACHINE WITH SUPPLY OF CHEMICAL SOLUTION INCLUDING OUTSOURCING OF BOILER AT CH (EC) UNDER GE ALIPORE KOLKATA
2024_MES_684289_2
GE/ALP (8403B) KOLKATA OF 2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
GE (A) Kolkata
Class D and Category c(v)/ d(v)
9 documents required · 9 mandatory
₹500
Garrison Engineer Alipore
₹83,980
Yes
5 Mar 2025
4 Jan 2025
27 Jan 2025
4 Jan 2025
25 Jan 2025
11 Jan 2025
Amount
Comprehensive maintenance of electrically operated Washing Machine 50 Kg capacity front loading type steam heating arrangement auto controlled with elect motor 3 PH 415 V, 5 HP including maintenance of complete electrical control pannel, door seal, door locking arrangement , maint of shaft, pully , inner drum complete for a period of 11 months incl minor parts, adjustments, lubrication and painting with one coat of Synthetic enamel paint one time during the period except major item mentioned below all as directed . Make : NAT Steel Equipments or equivalent make as approved by GE
Comprehensive maintenance of electrically operated Hydro Extracting Machine 25 Kg capacity auto controlled with elect motor 3 PH 415 V, 5 HP , including maintenance of complete electrical control pannel, door seal, door locking arrangement , leg spring , inner drum when plant is running complete for a period of 11 months incl minor parts/adjustments, lubrication and painting with one coat of Synthetic enamel paint one time during the period excluding major item mentioned below all as directed. Make : NAT steel equipments & XSONIC SYSTEM or equivalent make as approved by GE.
Comprehensive maintenance of electrically operated Hydro Extracting Machine 50 Kg capacity auto controlled with elect motor 3 PH 415 V, 5 HP , including maintenance of complete electrical control pannel, door seal, door locking arrangement , leg spring , inner drum when plant is running complete for a period of 11 months incl minor parts/adjustments, lubrication and painting with one coat of Synthetic enamel paint one time during the period excluding major item mentioned below all as directed. Make : NAT steel equipments & XSONIC SYSTEM or equivalent make as approved by GE.
Comprehensive maint of Air Compressor 10 Kg per cm 2 capacity complete incl minor repair and topping up of mobil oil periodically complete except major item mentioned below for a period of 11 months incl painting with one coat of Synthetic enamel paint during the period after preparation surface complete. Mobil oil is to be replaced completely once in a year (Approx 5 Ltr) all as directed. Make : L-Hg Khosla or equivalent make as approved by GE.
Comprehensive maintenance of Phneumatically operated steam heated auto temperature controlled flat bed press of size 750 x 1500 mm complete including cleaning of padding cloth, for a period of 11 months and one coat of Synthetic enamel paint during preparation of surfaces once in a year except major items mentioned below all as directed. Make : L-Hg Khosla or equivalent make as approved by GE.
Comprehensive maintenance of steam boiler oil fired type fully automatic of capacity 600 Kg/hour having fuel pump motor 3 PH, 415 V, 2 HP, thermax model RXA-6 for a period of 11 months incl overhauling of pump set, tunning of pumps, Lubricating etc complete except major items mentioned below during the period all as directed.
Comprehensive maintenance of electrically operated front loading sluice machine 15 Kg capacity auto controlled having separate electric motor 3 Ph, 415 V, 2 HP/ 3 HP washing and extraction complete including mainting of complete electrical control pannel , shaft, pully, door seal, locking arrangement etc except major items mentioned below for period of 11 months incl lubricants etc. Make : NAT steel equipments or equivalent make as approved by GE.
Comprehensive maintenance of callendering machine Roller type of size 24" x 3" incl testing of steam valve, lubricant of gear system, adjustment of chain, pneumatic valve, replacing of twin threads, complete except major items mentioned below for a period of 11 months all as directed. Make : Snow white or equivalent make as approved by GE.
Comprehensive maintenance of drying tumbler, end loading type of capacity 25 Kg, and (Make : Nat steel or equivalent make as approved by GE) and 50 kg (make-xsonic system or equivalent make as approved by GE) incl aligning , lubricating and cleaning of gear monthly, etc complete for a period of 11 months incl minor repair and adjustment as required complete all as directed.MES NO- 253/0001-DT/01/10
Comprehensive maintenance of auto clave machine at OT for a period of 11 mohths including minor repair/maintenance and adjustment as except major items mentioned here - in-after.minor parts like- ss bolt,nut, glass braided wire of required size included in quated rate
Comprehensive maintenance of auto clave machine at CSSD for a period of 11 mohths including minor repair/maintenance and adjustment as except major items mentioned here - in-after.minor parts like- ss bolt,nut, glass braided wire of required size included in quated rate
Comprehensive maintenance of Dry Cleaning machine at Laundry for a period of 11 mohths including minor repair/maintenance and adjustment as except major items mentioned here - in-after.minor parts like- ss bolt,nut, glass braided wire of required size included in quated rate
Comprehensive maintenance of Sterliser machine at Laundry for a period of 11 mohths including minor repair/maintenance and adjustment as except major items mentioned here - in-after.minor parts like- ss bolt,nut, glass braided wire of required size included in quated rate
Rewinding of elect motor induction 3ph, 415V, 50 C/S, 5 HP capacity with suitable size of copper wire and insulating materials, heat varnishing complete including changing of ball bearing 2 Nos.
Rewinding of elect motor induction 3ph, 415V, 50 C/S, 3 HP capacity with suitable size of copper wire and insulating materials, heat varnishing complete including changing of ball bearing 3 Nos.
Opening the top cover of boiler and all connecting fittings and taking out top cover incl defective refractory and cleaning for the boiler, discaling of steam coil by suitable discaling compounmd and refixing the top cover by replacement suitable size nuts & bolts as asbestos roap packing etc complete all as directed at site twice in 11 calender month.
Supply only the following spares after taking out unserviceable spare parts of boiler :-
Sequence controller with ase MA 810 as per sample
Top Refractory
Supply only, ball valve 20/25 mm dia
Supply only for following spares parts after taking out U/S parts for flat bed press :-
DTC (Timer)
Bed Spring
Supply only, for following spares parts after taking out U/S parts for washing machine :-
Pillow block bearing UCP-211 Make - Nat steel or equivalent make as approved by GE.
Pillow block bearing UCP-509 Make - Nat steel or equivalent make as approved by GE.
Oil seal as per sample .
Roller micro switch
Steam stop valve 25 mm & 20 mm (Make : Neta OR Equivalent make as approved by GE)
Over load relay as per sample
CI Pulley as per sample
Main drive CI Pulley as per sample
V' belt No B-59
V' belt No ,B-60
Gland packing
Door spring
Supply only of followig items for washing machine, slucing machine, drying tumbler, calendring machine,, hydro extractot\r, boiler, and auto clave machine as per sample
Contractor ( 32 Amp)
Supply only the following spares parts after taking down old U/S one for hydro extractor :-
Oil seal as per sample
Break shoe assembly complete with Linner as per sample
C.I Pulley as per sample
Door Gasket
Main shaft as per sample.
V' belt as per sample(B-68) and A-58
Leg shaft as per sample.
collar bush
Belt adujusting clamp
S & F for following items for drying tumbler after taking out old unserviceable parts :-
Electric heater 1 KW fin type as per sample
'V' belt as per sample,belt no-B-75,B-94, A-64
Timer (0-60 Min)
Add-On Block ( NO-NC)
Door gas kit
Taflon wire 10 mm
Electric heater 1.5 /2 KW fin type as per sample
Supply only for following items for callendering machine of size roller length 3000mm (min)x375 mm dia (min) after taking out unserviceable one :-
1/4" double pilot air valve incl fittings
V' belt as per sample,belt no-B-36
Push Button
Indicator Light (LED)
Thermo couplessensor, 5 mtr
Solenoid Valve
Air Pipe
Tongal Switch
Feeding belt
Guide belt (MOQ)
Steam steel hose pipe 1 inch
Air solenoid valve
Namda cloth
Supply and fix Ball valve of size 50 mm dia complete all as directed.
Cleaning of under ground DLPP tank of 8000 Ltr capacity by removing the accumulated dirt with scraper, iron brush etc from tank throughly complete all as directed.
Cleaning of OH DLPP tank of 500 Ltr capacity by removing the accumulated dirt with scraper, iron brush etc from tank throughly complete all as directed.
Supply only the following spares for Auto clave machine in replacement of U/S spares :-
Door gasket of suitable size . As per sample Make : NAT or equivalent
Door start pine
Heating element 6KW, Make : Nat or equivalent as per sample.
boiler Gasket(New type)
Float switch
Float switch gasket
Door Hub (part no-84199090)
Door Handle(Big) (part no-84199090)
Diapharam plate (part no-84199090)
Diapharam Gasket (part no-84199090)
solenoid valve 15 mm ,complete set steamline, Make-Avcon or equivalent make as approved by GE.
solenoid valve 20 mm ,complete set waterline, Make-Avcon or equivalent make as approved by GE.
solenoid valve 25 mm ,complete set waterline, Make-Avcon or equivalent make as approved by GE.
Door bracket & pin
Sensor adjustable 20 mm ,"BSP6" Make- simplex or equivalent make as approved by GE.
Relay card for Auto clave machine
Ball valve 15 mm
Ball valve 20 mm
Alane key bolts As per sample
Supply only the following spares for Slucing machine capacity 15 kg machine in replacement of U/S spares :-
'V' belt as per sample
Ball bearing as per sample
Door gasket
M & L for opening of chimney at both end of boiler and central exhaust system , cleaning of shunt carbon from both end of central exhaust system of both the boiler chimney including replacement of gasket, nut & bolts complete all as directed.
Supply and fix as in repair SS door lock for washing machine complete all as directed and specified.
Replacement of S.S inner drum with shaft and bolted assembly of washing machine 50 kg.
M & L for descaling of SS boiler tank of autoclave machine by opening of drum , removing of old worn out steam gasket and SS nuts & bolts and taking out all heating elements along with disconnecting electrical connection complete and descaling the tank witth proper descaling agent, refixing of all electrical connection and heating element and also replacing diapharam gasket and other necessary steam gasket, SS nuts & bolts testing complete twice in a year complete all as specified and as directed.
Replacement of AutoClave machine at OT HMI (Model: GS2107) & PLC to HMI Communication cable Model 24 SR/E/HP/HV/SD/NAT-8 incl Gasket for door glass fixing (Model : EDT/50/E)
Outsourcing for 2 set steam boiler oil fired fully automatic of capacity 600 KG/Hr having fuel pump motor 3 phase 415 volts 50 Hz, water pump with motor, blower motor, fuel oil pre heater control panel and softening plants (02 sets) complete. Make:- (a) Thermex for period of 182 days installed at CH(EC ) Kolkata as directed. (b) 01 No operator required for 01 shift of above mentioned M&O. operator working with dress for 08 Hrs shall continue 01 shift
Lokenath Engineering Co. (BID ID -3214932)
SUDHA ENTERPRISES (BID ID -3217282)
Tirupati Buildcon Pvt. Ltd. (BID ID -3217781)
S B ENTERPRISE (BID ID -3217057)
RADHA ENTERPRISE (BID ID -3215679)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .