| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC | ₹5.3 L | 1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | Aqua and Aqua Solutions L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in hard gravelly soil, Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete. | 22 | m3 | 266 ₹5,852 |
| 2.00 | Dismantling the existing damaged False ceiling including the cost of all materials, labour, lead, lift,and disposing away from the site, etc., complete, as per standard specifiction. | 56 | m² | 231 ₹12,936 |
| 3.00 | Supplying, fabricating, erecting and fixing calcium silicate or equivalent Board false ceiling upto a ceiling height of 4.5m from floor level including cost of labour charges, lead, lift, etc., complete as per standard specification. | 56 | m² | 970 ₹54,320 |
| 4.00 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | 1.5 | m³ | 1,565 ₹2,347.50 |
| 5.00 | Plain cement concrete in CC 1:3:6, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 2.5 | m³ | 5,752 ₹14,380 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 2 | m³ | 8,846 ₹17,692 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for column below ground level including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 0.5 | m³ | 23,205 ₹11,602.50 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for plinth beam including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 0.5 | m³ | 18,200 ₹9,100 |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for lintel including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 0.5 | m³ | 18,200 ₹9,100 |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for sunshade including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement) | 2 | RM | 1,129 ₹2,258 |
Tender Value
Refer Docs
EMD Value
₹5,400
Closing Date
27 Nov 2025, 2:00 pmClosed
SE/CEDC/North/CBE
O/o The Superintending Engineer/CEDC/North, Coimbatore.
SE/CEDC/N/CBE/C/No.21/ 25-26
2025_EB_623210_1
SE/CEDC/N/CBE/C/No.21/2025-26
Open Tender
Civil Works
120 days
Karamdai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,400
Yes
13 Jan 2026
13 Nov 2025
28 Nov 2025
13 Nov 2025
27 Nov 2025
13 Nov 2025
Amount
Earth work excavation in hard gravelly soil, Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete.
Dismantling the existing damaged False ceiling including the cost of all materials, labour, lead, lift,and disposing away from the site, etc., complete, as per standard specifiction.
Supplying, fabricating, erecting and fixing calcium silicate or equivalent Board false ceiling upto a ceiling height of 4.5m from floor level including cost of labour charges, lead, lift, etc., complete as per standard specification.
Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for raft foundation including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for column below ground level including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for plinth beam including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for lintel including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for sunshade including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Reinforced cement concrete 1:1.5:3 mix using 12mm to 20mm HBG downgraded metal machine crushed for roof slab 100 mm thick including cost of cement, all materials, labour, curing, all leads, lifts, cost of shuttering as per standard specification etc., complete. (but excluding cost of steel reinforcement)
Providing steel reinforcement TMT rods up to 16 mm dia for reinforced concrete works, including cost of steel rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Brick work in CM 1:5 using class II bricks/fly ash bricks including cost of all materials, labour charges, scaffolding charges, curing, lead, lift etc., complete.
Plastering in CM 1:5, 12 mm thick including the cost of all material, cement, labour charges, scafolding charges, all leads, lifts, as per standard specification.
Fabricating and providing aluminium partition section of size 95.25mmx44.45mmx1.70mm standard IS make for bottom and 63.5mmx38.1mmx1.50mm for vertical, horizontal sections with exterior quality water proof 9mm thick partical board with powder coating of any colour prelaminated on both sides kiln dried soft wood of approved make for top & bottom sections and 4.00mm thick pinheaded glass for intermediate panels including cost of all materials, lead, lift, labour charges, etc., complete.
Labour charges for fixing windows and ventilators along with frames in position etc., complete.
Filling with excavated earth for filling the foundation and floor including sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
Supplying and laying of antiskid tiles of approved quality and colour with ISI mark, laid in CM1:3, 20mm thick for removed damage tiles areaand pointing with white cement using 0.40kg/m2 including finishing the joint , and pointing flush with tilesurface including cost of all materials,lead, lift, labour, curing etc., complete.
Dadooing walls with glazed tiles 150mmx150mmx6mm of approved colour and make quality of ISI mark, laid in CM 1:2, 10mm thick and pointing with white cement using 0.40kg/m2 including finishing the joint and pointing flush with tile surface including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete as per standard specification.
Supplying and fixing earthen ware water closet of size 20" with flushing cistern of approved quality with 'P' and 'S' Trap embedded the closet with trap to shape in position with brick jelly concrete 32:12:5 using 40mm hard broken brick jelly finishing the top to required shape etc., including cost of all materials, labour, lead, lift, etc., complete as per standard specification.
Supplying and fixing of coloured Flat back urinal with all accessories such as 32mm dia bell mouth PVC connection, 15mm dia G.M wheel valve, 15mm ida "B" class G.I waster waer pipe, 15mm dia nylon connection, 15mm dia brass nipple etc, including 12/15 brass nipples, pipe connections and angle cock cost of all material, labour, lead, lift, etc, complete.
Supplying, fixing, laying and testing of 25mm Dia UPVC pipe pressure of approved good Quality ISI make for distribution of water supply including cost of pipe, GI specials, all materials, lead, lift, etc., complete as per standard specification.
Providing and fixing ventilating shaft of PVC pipe 110 mm dia of 6 kg /cm2 ISI make including cost of bend, Elbow and shoe, including cost of all materials, labour, lead, lift, as per standard specification etc., complete
Providing sewage line with 110mm dia PVC pipe 6kg/cm2 of ISI certified including all specials and cost of all material, lead, lift, etc., complete as per standard specification.
Providing fixing 15mm PVC heavy duty type screw down bib cock water supply tap including cost of pipe and labour fixing charges lead, lift, as per standard specification etc. complete
Supplying and fixing of New PVC door with frame in the building including cost of all materials, lead, lift, transport, labour charges etc, complete as directed by Board Engineer at site.
Supplying and fixing in position PVC Nahini Trap of approved Make & quality and size 110/75mm or , 110x63mm fixed over a bed of Brick jelly lime concrete and finished with CM 1:3,and fixing Stainless steel Grating including the cost of all materials, labour,lead,lift, T&P etc complete
Supplying and fixing in position of 25mm UPVC ball valve ISI make of approved quality including cost of all materials, labour, lead, lift, etc., complete as per standard specification.
Colour washing two coats using oil bound distemper over one coat of white cement of best quality for inside wall including cost of all materials, labour, curing, all leads & lifts etc., complete, as per standard specification.
Wiring with 2x1.5 sq.mm .PVC insulated SC unsheathed FRLS copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5AFT switch with continuous earth wire connection of 1.5sq.mm copper wire for making good of the concealed portion with suitable colour for PVC concealed light point / fan point (for electronic regulator)
Supply and fixing of 4Feet LED 18W Fitting with LED 18W tube (Higher End) complete with TW round blockson wall or ceiling with PVC unsheathed FRLS Copper leads from terminals to the fitting
Supply and fixing of WT bulk head fitting with guard suitable with 7W / 9W LED bulb 39
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1meter down rod on the existing clamp
Wiring with 2x1.5 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mmx100mmx113mm TW switch box with 3mm thick hylem sheet cover for 5A3 pin non interlocking wall socket with 5A flush type switch with cotinuous earth wire connection of 1.5 sq.mm copper wire and making good of the concealed portion with suitable colour for concealed PVC plug point
Supplying and erection of 8 nos. precast RCC rings (4' dia, 1' height) with cover for septic tank ring system inlcuding cost of specials, including all materials, labour, lead, lift, etc., complete.
Providing cast iron man hole cover of size 60 x 60 Cm cover of heavy duty including cost of all materials, labour, all lead, lift, as per standard specification, etc., complete.`
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_745200.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid