Tender Value
₹92.6 Cr
EMD Value
₹92.6 L
Closing Date
23 Apr 2026, 5:00 pmClosed
Estate Officer,PJTAU
Adminstrative Building,PJTAU,Rajendranagar
CONSTRUCTION OF AGRICULTURE COLLEGE AT KODANGAL (V and M) IN VIKARABAD DISTRICT, TELANGANA
690699
11/PJTAU/EO/TPA/2025-26, Dt. 28-03-2026
OPEN
Civil Engineering Works
VIKARABAD
20 documents required · 20 mandatory
₹29,500
₹92.6 L
8 Apr 2026
8 Apr 2026
9 Apr 2026
Earth work excavation in Ordinary Soil using Mechanical Means and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) Upto 3m Depth
Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Manual Means. Upto 3m Depth
Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Manual Means. 3m to 4m depth
Earth work excavation in Ordinary Rock using Mechanical Means (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308) Upto 3m Depth
Earth work excavation in hard rock (blasting prohibited) using hydraulic breaker and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308) Upto 3m Depth
Drilling holes in Hard Rock or Sheet Rock using Pneumatic Compressor, including grouting the holes with neat cement slurry, including all incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work.25mm Dia
Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)
Filling with carted gravel by mechanical means in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).
Supply and placing of the Nominal Mix (1:4:8) concrete (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
Supply and placing of the Nominal Mix (1:5:10) concrete (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
Supply and placing of the PCC M20 Nominal Mix Concrete produced in concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site including hire charges for the concrete mixer, , laying concrete, compacting, curing , overheads & contractors profit etc. complete as per standard practices but excluding cost of steel, its fabrication charges, centring, and shuttering for finished item of work.
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams. Footings
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams. Pedestals
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams. Plinth Beams
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Columns (unsupported height upto 3.66m) Fifth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.Columns (unsupported height upto 5.49m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-150mm thick- (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-150mm thick- (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-150mm thick- (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-150mm thick- (unsupported height upto 3.66m) Terrace Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-175mm thick (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-175mm thick (unsupported height upto 3.66m) 450mm thick side walls
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-175mm thick (unsupported height upto 3.66m) 375mm thick side walls
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-175mm thick (unsupported height upto 3.66m) 300mm thick side walls
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS.RCC Walls-175mm thick (unsupported height upto 3.66m) 100mm thick side walls
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS. Beams (unsupported height upto 3.66m) Fifth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.Beams (unsupported height upto 5.49m) Ground floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.Beams (unsupported height upto 7.32m) Ground floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 3.66m) Fifth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.125mm thick Roof slab (unsupported height upto 5.49m) Ground floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 3.66m) Fifth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 5.49m) Ground floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.150mm thick Roof slab (unsupported height upto 7.32m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175mm thick Roof slab (unsupported height upto 3.66m) Fifth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.175 mm thick Roof slab (unsupported height upto 5.49m) Ground floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 75mm thick platform slab Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 75mm thick platform slab First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 75mm thick platform slab Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 75mm thick platform slab Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR 75mm thick platform slab Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Steps Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Steps First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Steps Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Steps Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Steps Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sill slabs Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sill slabs First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sill slabsSecond Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sill slabs Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Sill slabs Fourth Floor
Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Precast Racks Ground Floor
Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Precast Racks First Floor
Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Precast Racks Second Floor
Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Precast Racks Third Floor
Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand) Precast Racks Fourth Floor
RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing, including cost and conveyance of all materials to site, all operationals &incidental charges, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903) Ground Floor
RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing, including cost and conveyance of all materials to site, all operationals &incidental charges, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903) First Floor
RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing, including cost and conveyance of all materials to site, all operationals &incidental charges, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903) Second Floor
RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing, including cost and conveyance of all materials to site, all operationals &incidental charges, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903) Third Floor
RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing, including cost and conveyance of all materials to site, all operationals &incidental charges, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work, lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903) Fourth Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING Ground Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING First Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING Second Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING Third Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING Fourth Floor
Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING Terrace Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels Fourth Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. Lintels Terrace Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Ground Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) First Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Second Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Third Floor
Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903) Fourth Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Ground Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) First Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Second Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Third Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Fourth Floor
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category B Steel Manufacturers with minimum installed Production Capacity of 2 lakh MT/annum to 10 Lakh MT Per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR/MS LIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) Terrace Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Ground Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) First Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Second Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Third Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Fourth Floor
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) Terrace Floor
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Ground Floor
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) First Floor
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Second Floor
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Third Floor
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) Fourth Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Ground Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) First Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Second Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Third Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Fourth Floor
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Terrace Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Ground Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) First Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Second Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Third Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Fourth Floor
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Terrace Floor
Plastering 20mm thick using screened sand with CM (1:5) (with 50% river sand and 50% Manufactured sand) including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, curing, cutting grooves as directed by Engineer - in - charge and cost of overheads & contractors profit etc., complete for finished item of work for basement. (SS 901,903 & 904) (Basement Plastering)
Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. First Floor
Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. Second Floor
Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. Third Floor
Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work. Fourth Floor
Screed Concrete average 75mm thick with M20 grade concrete machine mix using 12 mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab including cost and conveyance of all mterials like cement,sand (with 50% river sand & 50% manufactured sand)water , etc to site,materials and operational, incidental and labour charges for mixing mortar laying lift chearges rendering smooth curing including rounding off unctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work.(APSS No. 901 & 903).. First Floor
Screed Concrete average 75mm thick with M20 grade concrete machine mix using 12 mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab including cost and conveyance of all mterials like cement,sand (with 50% river sand & 50% manufactured sand)water , etc to site,materials and operational, incidental and labour charges for mixing mortar laying lift chearges rendering smooth curing including rounding off unctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work.(APSS No. 901 & 903).. Second Floor
Screed Concrete average 75mm thick with M20 grade concrete machine mix using 12 mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab including cost and conveyance of all mterials like cement,sand (with 50% river sand & 50% manufactured sand)water , etc to site,materials and operational, incidental and labour charges for mixing mortar laying lift chearges rendering smooth curing including rounding off unctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work.(APSS No. 901 & 903).. Third Floor
Screed Concrete average 75mm thick with M20 grade concrete machine mix using 12 mm hard broken stone aggregate laid over CC bed already laid or RCC roof slab including cost and conveyance of all mterials like cement,sand (with 50% river sand & 50% manufactured sand)water , etc to site,materials and operational, incidental and labour charges for mixing mortar laying lift chearges rendering smooth curing including rounding off unctions of wall and slab etc., and cost of overheads & contractors profit complete for finished item of work.(APSS No. 901 & 903).. Fourth Floor
Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710) Ground Floor
Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710) Third Floor
Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710) Terrace Floor
Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Ground Floor
Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) First Floor
Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Second Floor
Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Third Floor
Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) Fourth Floor
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Ground Floor
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) First Floor
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Second Floor
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Third Floor
Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701) Fourth Floor
Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. Ground Floor
Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. First Floor
Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. Second Floor
Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. Third Floor
Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. Fourth Floor
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Ground Floor
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) First Floor
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Second Floor
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Third Floor
Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707) Fourth Floor
Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Ground Floor
Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) First Floor
Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Second Floor
Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Third Floor
Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707) Fourth Floor
Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Ground Floor
Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) First Floor
Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Second Floor
Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Third Floor
Providing risers with 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special) Fourth Floor
Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Ground Floor
Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) First Floor
Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Second Floor
Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Third Floor
Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special) Fourth Floor
Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Ground Floor
Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) First Floor
Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Second Floor
Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707)Third Floor
Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707) Fourth Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Sill slabs Ground Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Sill slabs First Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Sill slabs Second Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Sill slabs Third Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Sill slabs Fourth Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Ground Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) First Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Second Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Third Floor
Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707) Fourth Floor
Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Ground Floor
Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. First Floor
Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Second Floor
Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Third Floor
Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Fourth Floor
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., overheads and contractors profit, complete for finished item of work. Ground Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External PuttyGround Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty First Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty Second Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty Third Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding(with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Putty Fourth Floor
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. Ground Floor
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. First Floor
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. Second Floor
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. Third Floor
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls. Fourth Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. Ground Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. First Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.Second Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. Third Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. Fourth Floor
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. Terrace Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Ground Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. First Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Second Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Third Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Fourth Floor
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. Terrace Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. Ground Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. First Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. Second Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. Third Floor
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty. Fourth Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Ground Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. First Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Second Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Third Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Fourth Floor
Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors. Terrace Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. Ground Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. First Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. Second Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. Third Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. Fourth Floor
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. Terrace Floor
Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work. Ground Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) Ground Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) First Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) Second Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) Third Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) Fourth Floor
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work. including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work. (TBSC-M.II-11) Terrace Floor
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc complete for finished item of work. (TBSC-M.III-07) Ground Floor
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc complete for finished item of work. (TBSC-M.III-07) First Floor
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc complete for finished item of work. (TBSC-M.III-07) Second Floor
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc complete for finished item of work. (TBSC-M.III-07) Third Floor
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor's profit, etc complete for finished item of work. (TBSC-M.III-07) Fourth Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge Ground Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge First Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge Second Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge Third Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge Fourth Floor
Supplying and fabricating, erecting and fixing in steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge Terrace Floor
Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Ground Floor
Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. First Floor
Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Second Floor
Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Third Floor
Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Fourth Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Ground Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). First Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Second Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Third Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Fourth Floor
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Terrace Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. Ground Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. First Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. Second Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. Third Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. Fourth Floor
Providing and fixing door frames fabricated from sections made of glavanized steel powder coated (base steel as per IS 277 with zinc of 120 grams/square metre), the factory made section are powder coated with pure polyester powder of 50-60 microns thick total coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a) 2mm thick MS powder coated butt hinges of 100 mm long – 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electroplates stiffeners of 6 Nos. – 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners – 6 Nos. with split end tail. d) Nylon Aldrops Receiver – 1 No. for single shutter frame. e)Tie Rod – 1 No including cost of fixing the frame to the masonry / concrete, cost of overheads and contractor's profit, etc. complete for finished item of work. Terrace Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 Ground Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 First Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 Second Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 Third Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 Fourth Floor
Supplying and fixing of SINGLE SHUTTER door shutter with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 , as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of Stainless steel fixtures of 3 Nos butt hinges 150mm long, 1 No Latch 300mm long,1 No aldrop 300mm long, 1Nos of 10mm Tower bolt 300mm long , 2 Nos 200mm long fancy door handles, 1 Nos heavy duty aluminium door stoppers, 1 Nos rubber bushes inside including labour charges for fixing the shutter to the frame , fixtures etc., overheads and contractors profit etc complete for finished item of work as per APSS 1001 & 1002 Terrace Floor
Supplying and fixing of DOUBLE SHUTTER door Shutters with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of stainless steel fixtures such as Hinges 150mm long-6 No's ,Stainless Steel Aldrops (IS:15834) 300 mm long -1no, latch-300mm long, Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long -2no , Door Handles 200 mm Long-4 no's , Heavy duty aluminium door stopper - 2no's, nylon door stop bushes- 2 No's including fixing the fixtures to the door with required number of screws, bolt and nuts including labour charges for fixing the shutters to the frame, overhead and contractor's profit etc., complete for finished item of work. Ground Floor
Supplying and fixing of DOUBLE SHUTTER door Shutters with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of stainless steel fixtures such as Hinges 150mm long-6 No's ,Stainless Steel Aldrops (IS:15834) 300 mm long -1no, latch-300mm long, Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long -2no , Door Handles 200 mm Long-4 no's , Heavy duty aluminium door stopper - 2no's, nylon door stop bushes- 2 No's including fixing the fixtures to the door with required number of screws, bolt and nuts including labour charges for fixing the shutters to the frame, overhead and contractor's profit etc., complete for finished item of work. First Floor
Supplying and fixing of DOUBLE SHUTTER door Shutters with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of stainless steel fixtures such as Hinges 150mm long-6 No's ,Stainless Steel Aldrops (IS:15834) 300 mm long -1no, latch-300mm long, Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long -2no , Door Handles 200 mm Long-4 no's , Heavy duty aluminium door stopper - 2no's, nylon door stop bushes- 2 No's including fixing the fixtures to the door with required number of screws, bolt and nuts including labour charges for fixing the shutters to the frame, overhead and contractor's profit etc., complete for finished item of work. Second Floor
Supplying and fixing of DOUBLE SHUTTER door Shutters with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of stainless steel fixtures such as Hinges 150mm long-6 No's ,Stainless Steel Aldrops (IS:15834) 300 mm long -1no, latch-300mm long, Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long -2no , Door Handles 200 mm Long-4 no's , Heavy duty aluminium door stopper - 2no's, nylon door stop bushes- 2 No's including fixing the fixtures to the door with required number of screws, bolt and nuts including labour charges for fixing the shutters to the frame, overhead and contractor's profit etc., complete for finished item of work. Third Floor
Supplying and fixing of DOUBLE SHUTTER door Shutters with Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 as per approved drawing including supply and fixing of 6 Nos MS hold fasts of size 300mm x 40mm x 5mm, including cost of stainless steel fixtures such as Hinges 150mm long-6 No's ,Stainless Steel Aldrops (IS:15834) 300 mm long -1no, latch-300mm long, Tower Bolt-10 mm Bolt (IS:15833) 200 mm Long -2no , Door Handles 200 mm Long-4 no's , Heavy duty aluminium door stopper - 2no's, nylon door stop bushes- 2 No's including fixing the fixtures to the door with required number of screws, bolt and nuts including labour charges for fixing the shutters to the frame, overhead and contractor's profit etc., complete for finished item of work. Fourth Floor
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws , including Stainless Steel Aldrops (IS:15834) 300 mm long -1no, Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long -1no , Door Handles 150 mm Long-2 no and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work Ground Floor
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws , including Stainless Steel Aldrops (IS:15834) 300 mm long -1no, Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long -1no , Door Handles 150 mm Long-2 no and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work First Floor
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws , including Stainless Steel Aldrops (IS:15834) 300 mm long -1no, Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long -1no , Door Handles 150 mm Long-2 no and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work Second Floor
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws , including Stainless Steel Aldrops (IS:15834) 300 mm long -1no, Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long -1no , Door Handles 150 mm Long-2 no and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work Third Floor
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws , including Stainless Steel Aldrops (IS:15834) 300 mm long -1no, Tower Bolt-10 mm Bolt (IS:15833) 300 mm Long -1no , Door Handles 150 mm Long-2 no and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work Fourth Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. Ground Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. First Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. Second Floor
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat, overheads and contractors profit, etc. complete for finished item of work as per Idia Gypsum Ltd specification. Third Floor
Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) First Floor
Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) Third Floor
Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) Fourth Floor
Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) Terrace Floor
Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108, including cost and conveyance of all materials, all operational, incidental labour charges, overheads and contractor's profit complete for finished item of work.
Supply and delivery of encapsulated plastic steps manufactured as per companies standard specification including cost of materials packing as per companiess standards, loading, transportation, unloading and stacking at site of work , and taxes such as complete sales tax,C.E.D and others etc., as applicable including labour charges for fixing etc. complete for finished item of work.
Providing Structural Steel hollow Square & Rectangular sections of 240 MPA grade conforming to IS 4923-1997 of all sizes , cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawings, including cost and conveyance of all structural steel sections and all wastages such as overlaps, couplings, welede joints, etc., and all operational, incidental charges, including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.
Providing and fixing of Expansion joint filler board for buildings, columns, beams and slabs 25 mm thick including cost and conveyance of all materials to site, all incidental, operational, labour charges etc.overheads & contractors profit complete for finished item of work as per approved drawing for all floors
Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Construction of subgrade and shoulders with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR ≥ 12%, PI < 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision).
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.
Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.
Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge..
Providing and laying 50mm thick of Dense Graded Bituminous Macadam with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bitumen VG-30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with full width full width paver to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including charges of all materials etc., complete and as per MoRTH specification No. 505(5th Revision)
Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading – 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge
Supplying, laying and fixing of precast concrete blocks for paving of M35 grade and thickness not less than 50mm for non traffic area conforming to IS15658:2006 in all shapes and designs as per the manufacturers specification, set over base coat of cement mortor 1:6, 12mm thick using screened sand over CC bed already laid or RCC slab including neat cement slurry of honey like consistency spread at 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water etc. and over heads and contractor's profit etc complete for finished item of work.
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for CC Drains walls
Vibrated Reinforced cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for cover slab CC Drains.
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW & Shyam Steel as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Cover slab of R.C.C items.
Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work 101.6 mm (4") dia
Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work 152.4 mm (6") dia
Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 152.4 mm (6") dia
Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 203.2 mm (8") dia
Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth
Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 5'-0" Depth
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work.
Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & constructing Brick masonry in CM 1:6 prop. over a C.C. (1:5:10) prop. Bed 100mm thick and plastering 12mm thick in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8 mm x 288.6mm (12" x 9") C.I. frame and hinged cover of standard make as directed by the Engineer-in-charge including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. (APSS No 1326)
Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work.
Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.
Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap : 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials , operational, incidental, labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.
Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.
Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.
Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost and conveyance of all materials to site, all operational, incidental, labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.
S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.
S&F CP finish brass wall mounted towel ring, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.
S&F of 15 mm brass body CP finish long body bib tap of not less than 400 grams weight with quarter turn spindle internal / external threaded connection conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge54.00 OD pipe
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 41.3 OD pipe
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 34.9 OD pipe
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 28.60 OD pipe
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 22.20 OD pipe
S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 15.9 OD pipe
S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 25mm nominal bore
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 20mm nominal bore
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 25mm nominal bore
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 32mm nominal bore
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 40mm nominal bore
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. 50mm nominal bore
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.
S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.
Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 75mm dia
Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) 110mm dia
S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.
Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering, cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.
S&F of 15 mm nominal size 101.6 mm CP finish iron body shower rose, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.
Earth work excavation in Ordinary Soil using Mechanical Means and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308)
Supply and placing of the Nominal Mix (1:4:8) concrete (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
Supply, Fixing & Delivery of HDPE Pipes are conforming to IS 14333 -2000 for using underground water supply e systems including transportation to anywhere in site , excluding all taxes (Supply up to 90 mm draincoil & above 90 mm dia. straight length)overheads & contractors profit complete for finished item of work. For 160 mm Dia(OD) HDPE - PE 100 8.00 KG/CM2
Supply, Fixing & Delivery of HDPE Pipes are conforming to IS 14333 -2000 for using underground drainage and sewerage systems including transportation to anywhere in site excluding all taxes (Supply up to 90 mm draincoil & above 90 mm dia. straight length)overheads & contractors profit complete for finished item of work. For 110 mm DiaHDPE - PE 100 8.00 KG/CM2
Supply, Fixing & Delivery of HDPE Pipes are conforming to IS 14333 -2000 for using underground drainage and sewerage systems including transportation to anywhere in site, excluding all taxes (Supply up to 90 mm draincoil & above 90 mm dia. straight length)overheads & contractors profit complete for finished item of work. For 90 mm Dia HDPE - PE 100 8.00 KG/CM2
Supply, Fixing & Delivery of HDPE Pipes are conforming to IS 14333 -2000 for using underground drainage and sewerage systems including transportation to anywhere in site excluding all taxes (Supply up to 90 mm draincoil & above 90 mm dia. straight length)overheads & contractors profit complete for finished item of work.For 75 mm Dia HDPE - PE 100 8.00 KG/CM2
Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)
Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.
Manufacture,supply and delivery of cast carban steel rising/Non raising spindle sluice valves design standard as per IS:14846/2000 for water supply scheme with ss spindle & ss working parts the grade of cast steel for body Bonnet, Dome,Stool cover, Wedge Stuffing box, gland Thrust Plate, Shall be as per IS:1030/1989.(The valve shall be used for High presure schmes &pumping stations) excluding transporation, Central exise duty and sale tax etc., complete. ISI Marked for 100mm dia
Manufacture,supply and delivery of cast carban steel rising/Non raising spindle sluice valves design standard as per IS:14846/2000 for water supply scheme with ss spindle & ss working parts the grade of cast steel for body Bonnet, Dome,Stool cover, Wedge Stuffing box, gland Thrust Plate, Shall be as per IS:1030/1989.(The valve shall be used for High presure schmes &pumping stations) excluding transporation, Central exise duty and sale tax etc., complete. ISI Marked for 150mm dia
Manfacture, Supply and delivery of Cast Carbon Steel Bolted Cover Non Return Valve as per IS:5312/Part 1/1984.Round body heavy duty material spec. As per IS:1030/1989 with SS Hinge &Seat Rings.including transporation, Central Exercise duty and sale tax etc., complete
Manfacture, Supply and delivery of Cast Carbon Steel Bolted Cover Non Return Valve as per IS:5312/Part 1/1984.Round body heavy duty material spec. As per IS:1030/1989 with SS Hinge &Seat Rings.including transporation, Central Exercise duty and sale tax etc., complete
Manufacture, Supply and delivery of DI D/F Butterfly Valves with GGG40/SG 400/12 or Equivalent grade as per I.S.3896-part 2-1985 and subsequent revisions, Double eccentrically Disc., with renewable soft seal on the disc and Body seat face of stainless steel / nickel weld overlay, with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Face to face dimensions as per AWWA C 504 or BS 5155 or IS:13095. Drilled as per IS: 1538/ISO For 100 mm Dia
Manufacture, Supply and delivery of DI D/F Butterfly Valves with GGG40/SG 400/12 or Equivalent grade as per I.S.3896-part 2-1985 and subsequent revisions, Double eccentrically Disc., with renewable soft seal on the disc and Body seat face of stainless steel / nickel weld overlay, with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Face to face dimensions as per AWWA C 504 or BS 5155 or IS:13095. Drilled as per IS: 1538/ISO For 150mm Dia
Supply and Laying of ISI 25mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour carges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC.
Supply and Fixing of ISI 25mm outer dia medium grade, with IS:9537 part 3 rigid PVC with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes : Sudhakar / Finolex / Modi / VIP/ Precision / Million / Goldmedal / GM/ DEC / Beljin.
Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 rigid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metal Modular deep box including all labour charges etc., complete.
Supply and erecting PVC / GI / MS Galvanished fan hook box with hook in RCC slab including all Labour charges etc., complete.
Wiring with run of 3 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in R.B. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Supply and fixing of 10A 3/2 Pin 2 Module Modular Socket with shutter with 6 / 10A 1 Way 1 Module Modular Switch, 3 Module box with cover frame in Common switch board including cost and conveyance of all materials and all labour charges etc., complete in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Supply and fixing of 6 / 10A 1 Way 1 Module Modular Switches - 2 Nos and 10A 3/2 Pin 2 Module Modular Socket with shutter - 3 Nos Modular type with cover plate and GI switch box fixing on separate board including all labour charges etc., complete. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Supply and fixing of following switches and sockets modular type on suitable size Modular deep box with cover frame including cost and coveyance of all material and all labour charges etc., complete with following configurations. 1) 16A / 6A 2 Module Combi Socket Modular Socket with shutter - 2 Nos 2) 16A/20A 1 Way 1 Module Modular Switch. - 2 Nos 3) 10A 3/2 Pin 2 Module Modular Socket with shutter - 2 Nos. 4) 6 / 10A 1 Way 1 Module Modular Switch - 2 Nos. including cost and coveyance of all material and all labour charges etc., complete for COMPUTER Use Makes of switches : Legrand Arteor / Schneider Zencelo / Honeywell Blenge Plus /Crabtree Murano / Logus Platina / Gold Medal GIFA / GM-Zenova/ LK -Englaze / Million M-Vee.
Supply and fixing of 16A / 6A 2 Module Combi Socket Modular Socket with shutter with 16A/20A 1 Way 1 Module Modular Switch fixed on suitable size Modular box with required cover frame including with connections, cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Supply and fixing of following switches and sockets modular type on suitable size Modular deep box with cover frame including cost and coveyance of all material and all labour charges etc., complete with following configurations 1) 16A / 6A 2 Module Combi Socket Modular Socket with shutter - 1 No 2) 16A/20A 1 Way 1 Module Modular Switch. - 1 No 3) 10A 3/2 Pin 2 Module Modular Socket with shutter - 1 Nos. 4) 6 / 10A 1 Way 1 Module Modular Switch – 1 Nos. including cost and coveyance of all material and all labour charges etc., complete for , LAB , ROOM"s Use Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.
Supply and Run of 2 of 1.5 sq.mm (Earth) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. specifications for Copper cable in the existing conduict pipe for earth continuity inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and Run of 3 of 2.5 sq.mm (phase, neutral and earth) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable of in existing pipe. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and Run of 3 of 4.0 sq mm (phase neutral and earth) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable of in existing pipe for power points and AC Sockets inlcuding all labour charges etc., complete. Makes of wires :Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and Run of 3 of 6.0 sq mm (phase neutral and earth) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable of in existing pipe for SPNDB's incoming inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and Run of 5 of 6.0 Sq.mm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable in the existing conduict pipe for run of mains from VTPN / Panel Board to TPN DB"s with pin type lugs and connections etc., complete. [for LDBs] Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and Run of 5 of 10.0 Sq.mm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable in the existing conduict pipe for run of mains from VTPN / Panel Board to TPN DB"s with pin type lugs and connections etc., complete. [for PDBs] Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR) / DEC (FRLS / HFFR) / Avocab (HFFR) / Fortune Arrt (HFFR) / Nakoda (HFFR) / HPL (HFFR).
Supply and fixing 20A Plug and Socket with 20A SP MCB with SS enclosure including connections for AC's. Makes of Enclosure: Legrand / Schneider / Siemens / L&T MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens
Supply and fixing of FP Metal Enclosure with IP 43 Protection DB Make with 1 No 63A, 10 KA DP MCB including internal connection and labour charges for Flush Mounting etc.,complete. Makes of Enclousure : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
Supply and fixing of 12 Way SPN DB with IP 43 Protection as per IS:13032 with 1 No 40A DP MCB as Incommer, and 8 Nos of 20A SP MCB 10KA, C/D Curve ISI Mark as out goings, concealing in wall etc complete. DB Makes :Legrand / Schneider / Siemens / L&T / Hager / Cabtree Xpro / ABB / C&S MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No., of 32A FP MCB 10KA, C/D Curve ISI Mark as incomer and 12 Nos 6-32 A 10KA SP MCBs 10KA, C/D Curve ISI Mark as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Lighting DBs) DB Makes :Legrand / Schneider / Siemens / L&T / Hager / Cabtree Xpro / ABB / C&S MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No., of 63A FP MCB 10KA, C/D Curve ISI Mark as incomer and 12 Nos 6-32 A 10 KA SP MCBs 10KA, C/D Curve ISI Mark as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Power DBs) DB Makes :Legrand / Schneider / Siemens / L&T / Hager / Cabtree Xpro / ABB / C&S MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
Supply and fixing of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No., of 80A FP MCB 10KA, C/D Curve ISI Mark as incomer and 24 Nos 6-32 A 10 KA SP MCBs 10KA, C/D Curve ISI Mark as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Power DBs) DB Makes :Legrand / Schneider / Siemens / L&T / Hager / Cabtree Xpro / ABB / C&S MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 with 1 No., of 125A 4P MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted as incomer with 8 Nos of 63A TP MCBs 10KA, C/D Curve ISI Mark as Out goings including internal connections and labour charges etc., complete. DB Makes :Legrand / Schneider / Siemens / L&T / Hager / Cabtree Xpro. MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree. MCCB Makes : L&T- D sine / Schneider-NS NSX / Legrand -DP X3 / Siemens-3V / Hager-h3 / C&S -Winbreak.
Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).
Providing independent earthing for Important equipment with 100mm dia Heavy gauge C.I ( Cast iron ) pipe with Flange 2.5m long enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through flange with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)
Supply and Run of 40mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (1.18Kgs/1Mtr)
Supply and Run of 50mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (2.36 Kg / Mtr)
Supply and Run of 25mm x 3mm copper strip (Cuurrent Carrying Capacity 270A) including cost of all accessories and labour charges etc., complete. (0.663Kgs/1Mtr)
Supply and Run of 25mm x 6mm copper strip (Cuurrent Carrying Capacity 270A) including cost of all accessories and labour charges etc., complete. (1.34 Kg / Mtr)
Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. (0.104Kgs/1Mtr)
Supply, transportation and fixing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF≥0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI≥80 etc., complete with 5 years warranty with BIS Certification LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Goldmedal. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply, transportation and fixing 32-36W (>=3240 Lumens) 2' x2' (600mm x 600mm) slim panel Recessed / Surface LED luminaire Square Housing Made of Aluminum alloy with corrosion resistant powder coat, with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >90 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% with non integrated driver etc., complete with 2 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar /Panasonic / Halonix / HPL / Goldmedal. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply, transportation and fixing of 18 W +/-10% (>= 1800 Lumens) LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Goldmedal. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply, Transportation and fixing of 90 W +/-10% (>9000 Lumens) LED HIgh Bay Luminaire with high power COB LED made of pressure diecast alluminium housing with powder coated,Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's, System efficacy >100 lm / W and junction temprature < 70°C, with Ingrees protection IP65, IK05, Driver surge protection 4KV, external Surge protection ≥ 5KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., with required wiring complete with BIS certification with warranty 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Goldmedal. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply, transportation and fixing ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 5W LED Lamp LED Lamp MAKES: Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Halonix / Jaquar / C&S / GM / / Gold Medal / Million. Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply and fixing of Buzzer Calling Bell of Makes : GM / Million / Gold Medal on 4"x7" decolam block including giving connections, cost of all accessories and labour charges etc., complete.
Supply and fixing of Electronic Musical bell Makes : GM / Million / Gold Medal on 4"x7" decolam block including giving connections, cost of all accessories and labour charges etc., complete.
Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75°C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes: Atomberg (Efficio ) / Havells / Orient / Halonix / Crompton.
Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm / 1400mm complete with connections. Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T Englaze.
Labour charges for fixing of ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / HPL / RPG.
Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete
Supply ofb 8" (200 mm) BLDC exhaust fan with necessary accessories etc.,complete. Makes : Crompton / Havells Ventilair-DB / Orient hill air.
Supply,Transportation of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades wiremesh with all accessories etc complete. Makes : Crompton / Almonard / Havells Turbo Force SP.
Supply,Transportation of 12" (300mm) ISI, 900 light duty exhaust fan with metallic blades wiremesh with all accessories etc complete. Makes : Crompton / Almonard / Havells Turbo Force SP.
Labour charges for fixing the exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nakoda / Payal / Finecab
Supply and fixing of GI louver shutter including GI mesh to avoid birds entry with necessary materials suitable for 300mm(12 inches) Exhaust fan.
Supply and fixing of Modular telephone Jack with connector on modular box with cover frame Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&TEnglaze
Supply, Transportation and Run of 1 of 2 Pair, 0.5mm telephone copper wire in the existing cable tray/ conduit pipe and labour charges etc., complete. Makes : Finolex / Delton / Surabi / Polycab
Supply, Transportation and Run of 1 of 10 Pair, telephone copper wire in the existing cable tray/ conduit pipe and labour charges etc., complete. Makes : Finolex / Delton / Surabi / Polycab.
Supply anf fixing of 10 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement. Make:Krone
Supply installation testing and commissioning of Push Button type Telephone Instruments of makes: Panasonic: Mofel:TS500.
Supply and laying of Cat 6 UTP cable including all taxes etc complete. Make:D Link / AMP / Molex / Legrand / Krone.
Supply and termination of cat-6 RJ 45 out lets including dual face plate of Makes:D Link / AMP / Molex / Legrand / Krone.
Supply of 7 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.
Supply of 3 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.
Supply and Fixing of 24 port patch panels etc., complete of Make:D Link / AMP / Molex / Legrand / Krone
Supply and Fixing of 24 port managable switch etc., complete of Make:CISCO / Net Gear / HP / D link.
Supply and fixing of 15 U Floor / Wall mounting net work Rack with power spike including all accessories etc., complete. Make:HCL / Vall
Supply, Transportation and Fixing of 19" 42U floor / Wall mounting net work rack Makes : HCL / Vall with power spike including all accessories and labour charges etc., complete.
Supply, Transportation and Run of 1 of RG6 Co-axial Cable Makes : Finolex / Delton / Surabi / Polycab for TVs in the existing cable tray/ conduit pipe and labour charges etc., complete.
Supply of 24 port 10 / 100 / 1000 Gigabit Unmanageable Ethernet switch. Makes : Digisol/TP Link / D link
Supply, Transportation and Installation of 300mm x 50mm x 1.6mm thick hot dip GI perforated cable tray without cover along with coupler plates, T's, Bends, Reducers, Anchor bolts, nuts, washers and slotted channels / Angle Iron Channels etc complete and the tray should be fitted on the wall / Ceiling etc. complete for finished item of work.
Supply and Installation of 150mm x 50mm x 1.6 mm thick GI perforated cable tray with out cover along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be fitted on the wall / Ceiling etc. complete for finished item of work for finished item of work.
Supply and Installation of 450mm x 50mm x 1.6mm thick GI perforated cable tray with out cover along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be fitted on the wall / Ceiling etc. complete.
Supply and Transportation of Outer dia 120mm and Inner dia 103.5mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II etc., complete by making trench in all soils up to 0.90Mtr deep and back filling the excavated earth without stones and making the surface proper with 15cm crown on the top and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.
Supply, Transportation and installation of 5.0KVA, 192 / 240V DC true on line UPS system IGBT technology pure sine wave out put, with double conversion with auto and manual static by pass switch single phase input / Single phase output. Makes: Numeric / Emerson / Fuji Electric
Supply and fixing of 12V 120 AH SMF battery including wire leads. Makes : Quanta / Racket / Exide / Amaron
Supply and providing of UPS cum battery rack 5 to 10 batteries
10 Persons Passenger Lift Supply, transportation, installation, testing and commissioning of 10 passenger, G+4/ passenger, 1.0m/s with vison panel for all floors with Gearless & Machine Room less elevator with following specifications with connected minor civil works required for installation of Lift including all accessories, scoffolding, requried channels, loading and unloading of materials etc, including comprehensive maintenance of lifts during the defect liability period. The contractor shall provide after sales service support for 2 years during warranty period from the supplier and obtain approval from the Engineer-In-Charge for making any payment for this. The Lift make & model shall be approved by the Engineer-In-Charge / Electrical Wing, Head Office. Note: Vison Panel For all floors Makes: Schindler / Kone / OTIS / Mitsubishi. Specifications: a) Type : Machine room less b) Pit Depth :1500 mm or as per NBC c) Minimum Floor to Floor Height (Required) : As per Standard d) Travel height : 3.6 to 4.0mtrs e) Head room Height : 4.5mtrs f) Lintel Height (Required) : 2240mm from finished floor level +/- 10% g) Number of persons : 10 P h) Rated Load : 1360 Kgs i) Number of Stops : 5 j) Number of Access sides : 1 k) Floor Designations : G, 1, 2,3,4 l) Drive Sytem : Alternating current, Voltage Frequency Drive (ACVF). m) Type of Controller : Fully collective control - Simplex / Duplex as per the site condition. n) Speed of Travel : 1.0 m/s o) Car size : As per Standard p) Door width : 800/ 900/1000mm or As per Standard q) Door Height : 2000 mm or as per standard r) Rated output motor : as per standard s) Car Design : Car walls finish in Stainless steel hairline finish LED spot in ceiling. t) Car Doors : stainless steel hairline finish. Granite Flooring finish in Black sea. Deco ceiling finish in stainless steel Hairline. Full Height mirror on rear car panel. u) Car Operating Panel : Mechanical push button. Door open/close and alarm buttons / Touch panel or equivalent, Visual call confirmation, Car position Indicator, Preannouncing arrows for collective controls, 16 Segment display. v) Landing Doors : Fully automatic landing doors with stainless steel hairline finish. Center Opening or Side Opening as per the site condition. w) Special Features : Closed loop control system Self Diagnostic control Overload detection Automatic evacuation to nearest floor(ARD) Light curtain on car entrance Alarm Horn Fire Switch Handrail in stainless steel finish on rear wall Auto Fan off Auto light off Intercom-3way
Supply and Transportation of Inverter Cassette type AC unit with ceiling mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units etc complete with Wireless remote controller, but without refrigerent piping and cable.with 2 years warranty and annual maintenance contract.. 4.0 TR Three Phase capable of delivering 48000 BTU/hr and above with operating on refrigerant R-32 / R-410 Makes :Daikin / Bluestar / Hitachi / Mitsubishi Electric / Toshibha / LG / Samsung / Lloyd or equivalent
Supply and Transportation of of INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with with warranty of compressor for 5 years iand comprehensive maintenance for 2 years. 1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 Makes : Daikin / Toshibha / Carrier / Blue Star / Hitachi.
Supply and Transportation of of INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with with warranty of compressor for 5 years iand comprehensive maintenance for 2 years. 2.0 / 1.8 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410. Makes : Daikin / Toshibha / Carrier / Blue Star / Hitachi.
Supply and erecting fully automatic line voltage stabilizer for operation on input voltage 200 to 250V. rated for 4 KVA maximum load and time delay model with Volt meter, selector switch, 6A / 16A flush type, 5 pin socket for out put and with 3 core flexible chord and 3 pin 6/16A plug top suitable for refrigerator for continuous operation including cost and conveyance of all mateials and all labour charges etc., complete. Makes : V-Guard / Real Guard / Uni Stab / ITL.
Supply and erecting fully automatic line voltage stabilizer for operation on input voltage 200 to 250V. rated for 5 KVA maximum load and time delay model with Volt meter, selector switch, 6A / 16A flush type, 5 pin socket for out put and with 3 core flexible chord and 3 pin 6/16A plug top suitable for refrigerator for continuous operation including cost and conveyance of all mateials and all labour charges etc., complete. Makes : V-Guard / Real Guard / Uni Stab / ITL.
Supply, Transportation and installation of 5.0KVA, 192 / 240V DC true on line UPS system IGBT technology pure sine wave out put, with double conversion with auto and manual static by pass switch single phase input / Single phase output. Makes: Numeric / Emerson / Fuji Electric
Supply and fixing of 12V 120 AH SMF battery including wire leads. Makes : Quanta / Racket / Exide / Amaron
Supply and providing of UPS cum battery rack 5 to 10 batteries
Supply and installation of advanced lighting protection with 205 -580mm height and 4.60 - 4.940 kgs, and having Rod length 760mm, weight 1.795 kgs with stainless steel rod, working on the principle of (ESE) Early Streamer Emission technology, having a coverage radius of 79 Mts under level 1 protection and 107 Mtrs radius under level 4 protection when mounted on 5 - 15 mts height of existing lattice tower gig level 1 protection and anticipation emission time of 60 - 72 micro seconds. The ESE should be manufactured according to standard NFC 17-102 : 2011 and CE certified including functional integrity etc Complete. Make : EARTHPLUS (THUNDER GUARD)/ NIMBUS / KALRE /FOREND./Equivalent approved make.
Supply and installation of advanced lighting protection with 205 -580mm height and 4.60 - 4.940 kgs, and having Rod length 760mm, weight 1.795 kgs with stainless steel rod, working on the principle of (ESE) Early Streamer Emission technology, having a coverage radius of 79 Mts under level 1 protection and 107 Mtrs radius under level 4 protection when mounted on 5 - 15 mts height of existing lattice tower gig level 1 protection and anticipation emission time of 60 - 72 micro seconds. The ESE should be manufactured according to standard NFC 17-102 : 2011 and CE certified including functional integrity etc Complete. Make : EARTHPLUS (THUNDER GUARD)/ NIMBUS / KALRE /FOREND./Equivalent approved make.
Supply of electro-Mechanical counterMakes: EARTHPLUS (THUNDER GUARD) / NIMBUS / KALRE / FOREND.
Providing independent earthing for Important equipment with 100mm dia Heavy gauge C.I ( Cast iron ) pipe with Flange 2.5m long enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through flange with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)
Supply and Run of 40mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete.
MAIN MPCC PANEL Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.14 Gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminum bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and color coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Incomer:1)Supply and erection of of 630A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA with thermal magnetic release Panel Mounted. - 1No - Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton. -1Nos. 2)Supply and erection of of 400A 4 Pole Change Over Switch on Load with open Execution.Makes : Socomec / LK. -1Nos. Out goings: Supply and erection of 400A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 35/3625 KA with thermal magnetic release Panel Mounted. - 2 Nos Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton Supply and erection of 250A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 35/3625 KA with thermal magnetic release Panel Mounted. - 6 Nos Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton Supply and erection of 125A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted. - 4nos Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton Supply and erection of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted. – 2 no Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton Supply and erection of 63A 10KA TP MCB, C/D Curve ISI Mark Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree. - 4nos Metering:Supply and erection of 0-415V volt Digital meter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE.Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A CT Digital Ammeter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of Analog selector switch for voltmeter / Ammeter on the existing box / panel including connections etc., complete. L&T / C&S / SALZAR / HPL MAKE.Supply and erection of Analog LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL MAKE.Supply and erection of Analog LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing box / panel including connections etc., complete. KAPPA MAKE.Labour charges etc complete with connections for Finished item of work.
SUB PANEL FOR GIRLS & BOYS HOSTEL Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.14 Gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminum bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and color coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Incomer.Supply of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA with thermal magnetic release Panel Mounted. - 1No- Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton. outgoings. Supply and erection of 125A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted.-12 no Supply and erection of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted. - 4 no 's MAKES OF MCCB's: LK - D sine / Schneider-NSNSX/Legrand -DP X3/ Siemens-3V /Hager-h3 / -Winbreak / BCH / Havells/ Eaton. Metering Supply and erection of 0-415V volt Digital meter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A CT Digital Ammeter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of Analog selector switch for voltmeter / Ammeter on the existing box / panel including connections etc., complete. L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing box / panel including connections etc., complete. KAPPA MAKE. Labour charges etc complete with connections for Finished item of work
SUB PANEL FOR EXAMINATION HALL & LECTURE HALL Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.14 Gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminum bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and color coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Incomer. Supply of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA with thermal magnetic release Panel Mounted. - 1No- Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton. outgoings. Supply and erection of 125A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted.- 3no Supply and erection of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted. - 5 no 's Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton. Metering Supply and erection of 0-415V volt Digital meter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A CT Digital Ammeter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of Analog selector switch for voltmeter / Ammeter on the existing box / panel including connections etc., complete. L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing box / panel including connections etc., complete. KAPPA MAKE. Labour charges etc complete with connections for Finished item of work
SUB PANEL FOR ACADEMIC BLOCK Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.14 Gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminum bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and color coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Incomer. Supply and erection of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA with thermal magnetic release Panel Mounted. - 1No- Makes : LK - D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / -Winbreak / BCH / Havells / Eaton. outgoings. Supply and erection of 125A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted.- 8no Supply and erection of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted. - 4 no 's MAKES OF MCCB's: LK - D sine / Schneider-NSNSX/Legrand -DP X3/ Siemens-3V /Hager-h3 / -Winbreak / BCH / Havells/ Eaton. Metering Supply and erection of 0-415V volt Digital meter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A CT Digital Ammeter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of Analog selector switch for voltmeter / Ammeter on the existing box / panel including connections etc., complete. L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing box / panel including connections etc., complete. KAPPA MAKE. Labour charges etc complete with connections for Finished item of work
APFCR panel for 305 KVAR in sub-station Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.14 Gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Incomer. Supply of 400A 4 Pole MCCB Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 35/36KA with thermal magnetic release Panel Mounted. - 1Nos Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hagerh3/ C&S -Winbreak. outgoings. Supply of 125A 3Pole MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release - 2 Nos Supply of 63A 10KA TP MCB, C/D Curve ISI Mark Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.- 7no Supply and fixing of 50KVAR Rating capacitor duty contactor Makes : L&T / Siemens / Meher. - 5 Nos Supply and fixing of 50KVAR Rating capacitor duty contactor -3 Nos Supply and fixing of 25KVAR Rating capacitor duty contactor -3 Nos Supply and fixing of 15KVAR Rating capacitor duty contactor -3 Nos Supply and fixing of 10KVAR Rating capacitor duty contactor -3 Nos Supply and fixing of 5KVAR Rating capacitor duty contactor - 1 Nos Supply of 305KVAR MPP type heavy duty capacitor of operating voltage Makes:L&T/Siemens/Schneider/Epcos. Metering Supply and erection of 0-415V volt Digital meter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of 0-100 / 200 / 400 / 600 /1000 - 5A CT Digital Ammeter of size 96x96mm on existing box / panel board including connections etc., complete of CONZERVE / ELMEASURE / MECO / HPL MAKE. Supply and erection of Analog selector switch for voltmeter / Ammeter on the existing box / panel including connections etc., complete. L&T / C&S / SALZAR / HPL MAKE. Supply and erection of Analog LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL MAKE. Push buttons on the existing panel board. Supply and fixing of 12 Stage APFC Relay with connection etc complete. Makes : L&T / Siemens / EPCOS / Schneider / Elmeasure 32A fuse bases with 2A control fuses -6Nos L&T Make. Supply and erection of Analog LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing box / panel including connections etc., complete. KAPPA MAKE.
Supply, Transportation, Installation and Commissioning of 11 KV, 630A, 25 KA Outdoor type Load Break Switch as detailed below with suitable CC foundation and 2 Nos GI pipe earthing with brick massonry chambers etc complete for finished item of work. a) Load break switch: 11KV,630A, 25 KA with fuse trip, earth switch, manually operated spring chargesd mechanis with 2 no + 2 NC. b) HT HRC fuse upto 63A - 3 nos. c) Bus bar connection. d) Indication lamps. e) Manual trip Push buttion. Make : Megawin / Pentagon / Venkateshwara /Jyothi.
TRANSFORMER Supply, Transportation, Installation, Testing and Commissioning of 500 KVA TRANSFORMER with all test reports. The Transformer shall be designed and manufactured as per IS:1180 OCTC with level-I with initial filling of oil as per IS 335-1993. The basic details of the Transformer are as under. Makes: Kirloskar / PETE / Esennar / Voltamp / Crompton / ABB / Schneider. 1. Quantity : 1 Nos 2.Rated KVA : 500 KVA 3. Service & Location: Continuous Outdoor Distribution Transformer 4. Mounting : Plinth. 5. Wound : Copper Double wound 6. Type : Core type oil immersed 7. Cooling : ONAN 8. Temp Rise : 40⁰C in oil, 45⁰C by resistance 9. Vector Group: Dyn 11 10. Primary Connection : Delta 11.Nominal Voltage / Current : 11KV/415V,26A/695A 12. Highest system Voltage: 12000V 13. Primary Frequency :50 HZ +/- 3% 14. Number of Phases : 3 15. Primary wires:3 16. Secondary connection : Star 17. Secondary Volts / Current : 433V 18. Secondary phases : 3 19. Secondary wires: 4 20. Taps on primary winding for primary voltage variation : +5% to - 10% in steps of 2.5% of 7 position (6 Steps) 21. Terminal arrangement. a.HV: HT terminal box as per the site condition. b. LV: Cable box suitable to receive 1600A Air bus duct 22. LV:One separate terminal for earthing. 23. Total Losses at 50% Loading [Watts] [Max] as per IS 24. Total Losses at 100% Loading [Watts] [Max]as per IS 25.Percentage Impedance at 75 deg. C at----- as per IS 26. No Load current: Less than 2% of full load current. a. Rating and terminal marking plate: One b. Lifting Lugs:Two c. Off-circuit tap switch :One d. Earthing Terminals :Two e. Radiators ( Attachable):Adequate f. Explosion vent with Diaphragm :One g. Conservator with Drain plug:one h. Oil filling hole with cap :One i. Oil level indicator : One j. Dehydrating Silicagel Breather : One k. Terminal Arrangement: HV With Treminal Box l. Terminal Arrangement : LV Cable Box m. Separate Neutral Bushing : One n. Filter valve with blanking plate : One o. Drain cum filter valve with blanking plate : One p. Air release device : One q. Thermometer Pocket : One r. Four :Unidirectional flat rollers s. One :10Cm dial thermometer(Rigid stem type) Make & Model will be Approved by the Head Office / Engineer-in-charge.
DG SET – 125 KVA Supply, Transportation, erection and commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz, water cooled multi cylinder diesel generator set with alternator of 125 KVA, 3 Phase, 415, 50 Hz, 154 BHP,water cooled multy cylinder diesel generator set with alternator of 125 KVA output continious rating at 0.8 p.f. Batteries. out put continuous rating directly coupled Engine, Alternator and radiator with guard and mounted on a common base frame of Robust construction and complete with AMF control panel having IP-52 protection, anti vibration mounts of reputed make, Acoustic Enclosure as per CPCB norms IV, sound absorbing material to restrict sound level up to 75 dB up to 1 mtr distance and etc as per the following specifications mentioned.A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree of protections shall be IP21. B.Diesel Engine : Kirloskar / Cummins / Mahindra & Mahindra / Greaves Cotton Diesel Engine start, developing suitable 154 BHP output at 1500 RPM with mechanical / electronic governing so as to enable the alternator to give 125 KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The engine with 1st filling of oil and Diesel etc. 01. Exhaust pipe of required size as per the standards. 02. Diesel tank suitable for 8 to 12 Hours running capacity. 03. Residential Silencer. 04. SMF Batteries with leads as per the Manufacturer standards. C. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG CRCA sheet shall be totally enclosed with dust and Vermin proof, floor mounted / wall mounted type and shall be comprising the following. 01. Voltmeter with selector switch. 02. 4 Pole MCCB incomer of 250 A rating of Schenieder / LK make for EB and DG. 03. Ammeter with selector switch with CTs. 04. PF Meter and frequency Meter. 05. Indicator lamps (set Run, Load ON) with fuses. 06. KWH Meter of required rating. 07. Set of control fuses and current transformer. 08. Input Terminal board and output Terminal Board. 09. Battery charger with transformer rectifier unit. 10. Alternator supply air break contactor of LK make. 11. Main supply air break contactor of LK make. 12. Audio Visual announciation. 13. Main supply voltage set of control relays and timers with one mode selector switch, set of push buttons. 14. Control cable up to 15 Mtrs 2.5Sqmm 6 Core Make & Model will be Approved by the Head Office / Engineer-in-charge.
Supply of 3 Core 11 KV 95Sqmm HT XLPE (E) armoured Cable, as per IS specification confirming to IS 7098/II/85 with latest ammendments of Makes : Torrent / Unicab / Universal / Polycab / Havells/ KEI / RPG / Gloster.
Providing and errecting heat shrinkable indoor termination kit for 11 KV HT XLPE insulated armoured cable 11KV, 3core 95Sqmm with necessary materials etc., complete. Makes : Raychem / Transeal / M Seal
Providing and errecting heat shrinkable outdoor termination kit for 11 KV HT XLPE insulated armoured cable 11KV, 3core 95Sqmm with necessary materials etc., complete. Makes : Raychem / Transeal / M Seal
Providing transformer plinth 1.2 x 1.2 x 1.5 mtr in size with necessary excavation in ground at the bottom with 150mm thick 1:2:4 cement concrete raft at the bottom and top and 225mm thick wall constructed in stone masonry and remaking hallow portion shall be filled with stone chips duly plastered 20mm thick outsides including watering etc., complete.
Charges Preparation of drawings and Approval from CEIG including licening.
Providing of CC foundations suitable upto 125 KVA DG set complete as directed and as per the norms with all required hard ware materials complete.
Supply, Fabrication, Transportation and erection of DP structure made with 2 Nos 175mm x 85mm ( ISMB Modified ) or equivalent about 30'-0 length / 9.1 mtrs length RS joist pole erection of the same Including excavation of pit in all kinds of soil including breaking stones, concreting with (1:3:6) mixture base plate, coil earthing back filling, 1:2:4 for couping including red oxide primary painting and two coats of aluminium painting etc., complete as required with following as per CEIG norms. a). 400A AB Switch-1No b) HG Fuse sets-1No c). LAS-1set. d) Required Number of 11KV pin and disc insulatiors. e) Required length of 100X50mm and 75X40 mm ISMC chanell iron including two coats of redoxide and two coats of enamil paint ect for finished item of work. f) 11KV pin insulators and disc insulators. g) AB switch operating pipe with handle and lock and key arrangements. h). "0" SWG or 8.25 mm dia hard drawn bare copper wire including copper binding wire etc., complete as required including connections. i) 40X6mm GI strip for the DP structure earthing. j) 25X6mm copper strip for lightning arrestors earthing. k) 600X600mmX3,15mm thick copperplate earthings as per NEC with brick massonary chambers - 2 Nos l) GI pipe earthing for the Double pole structure with brick massonry chambers as per IS - 2 Nos
Supply,Transportation,unloading and erection of 9.1 mtr long PSCC poles with 280Kg working load at site in good condition for HT/LT lines support including cost and conveyance of all materials and labour charges etc.,complete
Supply and fixing of stayset with 7/8 SWG(10 to 15m long) guy insulator with concreting 1:3:6 including excavation of pit and back filling including cost and conveyance of all materials and labour charges etc.,complete.
Supply and stringing of 3(Three) Run of 7/2.50 AAA C all Alluminium annealed conductor Weasel. Make : Pawancab or its equivalent
Supply and erection of V type Crossarms for 9.1 mtrs PSCC poles
Supply and erecting porcelain Pin type insulator suitable for 11KV line with suitable hardware on existing cross arms.
Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes :Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda
Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes :Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes :Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon/ Nakoda.
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables from 95 Sqmm up to 420 sqmm covering the cable with bricks and back filling of Trench duly providing Cable route Indicators of size 152mm round / 102mm x 102mm / 152mm x 152mm at every 8 Mtrs distance embedded in C.C including cost and conveyance of materials and labour charges etc., complete.
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 70 sqmm covering the cable with back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.
Laying of PVC armoured under ground cable from 95 Sq.mm to 400 Sqmm fixing on chromium plated metallic base saddles on wall as per IS 1255 and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.
Laying of PVC armoured under ground cable up to 70 Sqmm fixing on chromium plated metallic base saddles on wall as per IS 1255 and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.
Termination of UG cables of 4 core 10 sq.mm & 4 core 16 sq.mm including with required Heavy duty cable glands & Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes: SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 35 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes: SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 50 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes: SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 70 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes: SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 185 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes : SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 240 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes : SMI / Commet / Dowels / DMI / Jainson.
Termination of UG cables of 3.5 core 300 Sq.mm including with required Heavy duty cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete. Makes : SMI / Commet / Dowels / DMI / Jainson.
Fabrication, Transportation and supply of hot-dip galvanized Octagonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with Bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs height Pole having dimensions Bottom 130 mm,. Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700 long 'J' bolts along with template of Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL
Fabrication, Transportation and supply of of 1.5mtrs sword type decorative Single arm bracket with dooms complete with all accessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT / TRANSRAIL / SKIPPER / UTKARSH / LAASMA / CONSOUL
Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x0.45 Mtrs x 1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including all labour charges and cost and conveyance of materials etc. complete.
Supply and fixing of suitable feeder pillar box made with 14 SWG CRCA sheet including S & F of Legrand / Schnieder / Siemens / ABB / L&T make 40A 4P Isolator, 6 Nos SP MCB's, din channel, 6 Sqmm 3 core copper cable for individual light control, contactor, connectors and provision for energy meter etc., complete for finished item of work.(for High mast light control)
Supply of Automatic Street Light Control System with Optical Sensor, Low voltage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC enclosure of IP 54 protection, MCBs and contactor suitable to control the load of 8 KW of single phase load with necessary clamping arrangements of Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj
Supply, Transportation and fixing of 90 W +/-10% (>=9000 Lumens) LED Street light Body made of high grade pressure die – cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty.with fixed on the existing bracket of the pole required with 10 mtrs 2.5 Sq.mm 3 Core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable including masonary work and all labour charges and giving connections etc., complete. The contractor must furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : Philips / Osram / GE Venture / Crompton / Bajaj / Wipro / Havells. LED MAKE : Philips LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ-KODANGAL.xlsx
TENDER_DOCUMENT • 0.10 MB
CONSTRUCTION OF AG Clg at KODANGAL.doc
TENDER_DOCUMENT • 1.82 MB
Download all tender documents and submit your bid