| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹79.8 LAdmitted-Finance | -12.99% | ₹79.8 L | L1 | Admitted-Finance |
| 2 | L2₹83.2 LAdmitted-Finance | -9.27% | ₹83.2 L | L2 | Admitted-Finance |
| 3 | L3₹83.3 LAdmitted-Finance | -9.22% | ₹83.3 L | L3 | Admitted-Finance |
| 4 | L4₹86.1 LAdmitted-Finance | -6.11% | ₹86.1 L | L4 | Admitted-Finance |
| 5 | L5₹87.1 LAdmitted-Finance | -5.01% | ₹87.1 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹91.7 L
EMD Value
₹1.8 L
Closing Date
18 May 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
RSAMB DIV UDAIPUR
Construction of Class room, Laboratory and repair works at Govt. Polytechnic College Udaipur, Distt. Udaipur
2026_RSAMB_555706_8
RSAMB/UDAIPUR/NIB-02/2026-27
Open Tender
Civil Works
180 days
UDAIPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EE, RSAMB
₹1.8 L
Yes
22 May 2026
2 May 2026
20 May 2026
2 May 2026
18 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Civil Work | - | - | - | - | 12378915900 | |
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 396 | Sqm | 375 | ₹1,48,500 | - | |
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix | 39.6 | Cum | 5,609 | ₹2,22,116.4 | - | |
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 133.71 | Cum | 4,990 | ₹6,67,212.9 | - | |
Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand)Add extra providing and placing in position 2 Nos. ,6mm Ø M.S. bar at every third course of half brick masonry . | 170.79 | Sqm | 617 | ₹1,05,377.43 | - | |
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 28.19 | Cum | 538 | ₹15,166.22 | - | |
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 1.94 | Cum | 930 | ₹1,804.2 | - | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 8.1 | Cum | 637 | ₹5,159.7 | - | |
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 1,256.82 | Sqm | 340 | ₹4,27,318.8 | - | |
Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 249.47 | Cum | 5,185 | ₹12,93,501.95 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.90 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.26 MB
Tendernotice_7.pdf
PDF • 1.25 MB
Tendernotice_8.pdf
PDF • 0.26 MB
Tendernotice_9.pdf
PDF • 0.09 MB
8.pdf
Tender Documents • 0.79 MB
BOQ_989624.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid