Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC RUMTY BARBOAT NIMBONG KHASMAHAL KALIMPONG | KALIMPONG | KALIMPONG | WEST BENGAL | ₹24.3 L | L1 | Accepted-AOC 1st Lowest Bidder |
| 2 | L2₹24.6 LRejected-AOC | ₹24.6 L | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | L3₹24.8 LRejected-AOC CHUIKHIM BUSTY PABRINGTAR G P KALIMPONG | KALIMPONG | KALIMPONG | WEST BENGAL | 734301 | ₹24.8 L | L3 | Rejected-AOC 3rd Lowest Bidder |
Tender Value
₹24.3 L
EMD Value
₹48,555
Closing Date
15 Jan 2026, 12:00 pmClosed
Executive Engineer Kalimpong Irrigation Division
Upper cart Road Raniban Kalimpong
Emergent Landslide Protection Work near Birkha Bahadur Bhujels House for Protection of Poudyal Dara at East Main Road, Ward No. XVI in P.S. Kalimpong.
2025_GTA_979101_6
e-NIT No 15/EE/KID/GTA/2025-26
Open Tender
CIVIL WORKS
60 days
East main Road, Ward No XVI
Please refer Tender Documents
7 documents required · 7 mandatory
₹1,000
₹48,555
13 Mar 2026
26 Dec 2025
17 Jan 2026
26 Dec 2025
15 Jan 2026
26 Dec 2025
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 mts. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a). Depth of excavation not exceeding 1500 mm.
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). I. With earth obtained from excavation of foundation.
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate]
Cement concrete with 30 mm. down graded shingles excluding shuttering. N.B. Variety. In ground floor.with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge (a). 1:3:6 proportion.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b). Where staging is not required.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.75 MB
Tendernotice_2.pdf
PDF • 2.02 MB
BOQ_2387347.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid