| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹8.5 L (2.08%)Admitted-Finance | ₹4.2 Cr+₹8.5 L (2.08%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹12 L (2.94%)Admitted-Finance | ₹4.2 Cr+₹12 L (2.94%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sri Venkateswaraa Engineering L3 | Samindra Engineering L2 | HI TECH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply & fabrication of storage modules in transportable form suitable for erection at site as per approved fabrication drawing and technical specification. The works involves procurement of Ms structural steels & other raw materials whatsover required for complete the fabrication of structural module confirming to IS 2062 Gr."BR" & IS:808 and preparation of fabrication drawing as per issued GA drawing, fabrication procedures/sequence, QAP and NDT procedures for review & approval from department, preparation of JHA & rigging plan for review & approval,qualification of procure raw materials from QA, material identification, marking, flame cutting, mechanical cleaning/surface preparation using shot blast methods, application of two coats of primer, SMAW / GTAW welding, fabrication & welding of various fabricated parts along with all accessories, alignment, flush grinding of all welded joints, LP examination and painting of MS Structural’ s suitably using spray painting as per department approval & technical specification, random coating thickness measurements, arranging interim safe storage for erection at site and submission of as-built drawings & QA report. | 240 | MT | 1,65,000 ₹3,96,00,000 | 1,53,500 ₹3,68,40,000 | 90,000 ₹2,16,00,000 Lowest |
| 2.00 | Erection of fabricated storage modules at site as per approved structural rack layout drawing involving planning the rigging works for transportation from storage yard to INRPK site in sequence, placement at designated location in sequence, providing temporary supports/restraint for preliminary alignment at position, fit-up, GTAW welding for root pass for Column to Base Plate welding, SMAW welding for column to base plate fill-up pass & other joints, 100% DPT for colum to base-plate final pass & 10% DPT for other joints for final pass, final alignment & painting at weld location or left over place, final coating thickness measurements at weld location & other location on random location. All the tool, tackles & material handling equipments like cranes of suitable capacity etc are in contractor's scope of supply. | 240 | MT | 10,000 ₹24,00,000 Lowest | 20,037 ₹48,08,880 | 80,000 ₹1,92,00,000 |
Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
17 Apr 2025, 3:00 pmClosed
General Manager, INRP(K)
Office of GM, 608 Building, BARC, Kalpakkam
Supply, Fabrication and Erection of DU Oxide drums storage modules at INRPK
2025_BARC_853992_1
BARCF/INR-PRJ/ME/TR/28/2024
Open Tender
Metal Fabrication
Item Rate
365 days
INRPK/NRB/BARC/Kalpakkam
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹8.9 L
3 Jun 2025
25 Mar 2025
22 Apr 2025
27 Mar 2025
17 Apr 2025
11 Apr 2025
1 Apr 2025 - 7 Apr 2025
Amount
Supply & fabrication of storage modules in transportable form suitable for erection at site as per approved fabrication drawing and technical specification. The works involves procurement of Ms structural steels & other raw materials whatsover required for complete the fabrication of structural module confirming to IS 2062 Gr."BR" & IS:808 and preparation of fabrication drawing as per issued GA drawing, fabrication procedures/sequence, QAP and NDT procedures for review & approval from department, preparation of JHA & rigging plan for review & approval,qualification of procure raw materials from QA, material identification, marking, flame cutting, mechanical cleaning/surface preparation using shot blast methods, application of two coats of primer, SMAW / GTAW welding, fabrication & welding of various fabricated parts along with all accessories, alignment, flush grinding of all welded joints, LP examination and painting of MS Structural’ s suitably using spray painting as per department approval & technical specification, random coating thickness measurements, arranging interim safe storage for erection at site and submission of as-built drawings & QA report.
Erection of fabricated storage modules at site as per approved structural rack layout drawing involving planning the rigging works for transportation from storage yard to INRPK site in sequence, placement at designated location in sequence, providing temporary supports/restraint for preliminary alignment at position, fit-up, GTAW welding for root pass for Column to Base Plate welding, SMAW welding for column to base plate fill-up pass & other joints, 100% DPT for colum to base-plate final pass & 10% DPT for other joints for final pass, final alignment & painting at weld location or left over place, final coating thickness measurements at weld location & other location on random location. All the tool, tackles & material handling equipments like cranes of suitable capacity etc are in contractor's scope of supply.
Samindra Engineering (BID ID -3203112)
Sri Venkateswaraa Engineering (BID ID -3202975)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.26 MB
Tenderdoc-compressed.pdf
Tender Documents • 31.55 MB
BOQ_897818.xls
BOQ • 0.32 MB
BOQ.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 31.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .