Loading…
Loading…
Tender Value
₹19.9 L
EMD Value
₹2.0 L
Closing Date
26 Aug 2026, 3:00 pm2d left
Chief Engineer Nagar Nigam Saharanpur
Chief Engineer Nagar Nigam Saharanpur
Construction of a CC road in Ward No. 33, Indraprastha Colony, extending from the gate past Parveen Dahiya house up to the park
2026_NNSAH_1179075_1
6387 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.0 L
23 Aug 2026
23 Aug 2026
26 Aug 2026
23 Aug 2026
26 Aug 2026
23 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled material as directed by the Engineer-in-charge with in a distance of 60 metre (200 feet). | 990 | m2 | 38 | ₹37,620 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge with in a distance of 60 meter (200 feet). | 3.96 | m3 | 400 | ₹1,584 |
| 3 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move )
NALA
DEDUCTION | 41.16 | m3 | 90 | ₹3,704.4 |
| 4 | Disposal of waste malba from site upto 5.0 km i/c all comp of work
Quntity same as per above item
Quntity same as per above item
For disposal take 90 % of total quntity | 108 | m3 | 130 | ₹14,040 |
| 5 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 12.76 | m3 | 2,985 | ₹38,088.6 |
| 6 | Cement Concrete with 4cm gauge approved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials ,labour, Tools & plants etc .required for proper completion of the work. | 85.8 | m3 | 4,850 | ₹4,16,130 |
| 7 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, T &P etc. required for proper completion of the work. | 27.92 | m3 | 4,690 | ₹1,30,944.8 |
| 8 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 2.58 | m3 | 5,750 | ₹14,835 |
| 9 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 127.68 | m2 | 165 | ₹21,067.2 |
| 10 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concretewith shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. | 128.68 | m3 | 7,300 | ₹9,39,364 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_2216598.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].