Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
19 May 2025, 3:30 pmClosed
Director
Director of Lighthouses and Lightships, Sri Vijaya Puram
Dismantling of Port Control Tower Building and pump house Building and Area Development at Atlanta Point, Sri Vijayapuram for Establishment of VTMS.
2025_DGLL_859545_1
CM-PB-01/1/2024-M
Open Tender
Civil Works
Works
150 days
Atlanta Point, Sri Vijayapuram
As Per Tender
11 documents required · 11 mandatory
₹0
₹23,500
Yes
DLL, Sri Vijaya Puram
10 Jul 2025
10 May 2025
20 May 2025
10 May 2025
19 May 2025
10 May 2025
13 May 2025
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work.
Demolishing brick /CC block work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer in charge, beyond 50m initial lead, for all leads including all lifts involved.
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead of area 3 sq. metres and below.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
For thickness of tiles 10 mm to 25 mm
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge :
65 mm nominal bore
Dismanlting roofing including ridges, hips, valleys and gutters etc. and stacking the materials within 50m lead of G.S. including sheet stacking within 50 metres lead as per direction of Engineer-in-charge
Dismanlting steel work in single section including segregation, cutting and stacking within 50m lead in R.S Joists including stacking of materials within 50 metres lead as per direction of Engineer-in-charge
Extra for levelling & neatly dressing of disposed items like dismanted PCC, RCC, hollow block etc. completely as directed by Engineer-in-charge.
Dismanlting of existing trestle tower including dismembering of all materials such as angles, tees, flats, channels, gusset plate, bolts, nuts, cutting rivets, welding etc. and stacking within 50m lead including cost of all labours, tools, & plants etc. head loads, cutting,stacking complete as directed by the enginer in charge
Recovery of salvage value/scrap value of recovered steel material at the time of dismantling of RCC structures including cost of transport from the site but excluding the cost of dismalting, labours, tools materials etc. complete.
Recovery of salvage value/scrap value of recovered G.I pipe at the time of dismantling of RCC structures including cost of transport from the site but excluding the cost of dismantling, labours, tools materials etc. complete.
Recovery of salvage value/scrap value of recovered roofing material (G.I sheet) at the time of dismantling of RCC structures including cost of transport from the site but excluding the cost of dismantling, labours, tools materials etc. complete.
Recovery of salvage value/scrap value of recovered rolling shutter material at the time of dismantling of RCC structures including cost of transport from the site but excluding the cost of desalting, labours, tools materials etc. complete.
Recovery of salvage value/scrap value of recovered steel material of trestle tower at the time of dismantling of RCC structures including cost of transport from the site but excluding the cost of dismantling, labours, tools materials etc. complete.
Engaging of hitachi for surface dressing and surface leveling of the ground including earth cutting filling and removing vegetation, rubbish up to a distance of 50m outside the periphery of the area cleared , stacking of debries , other miscellaneous works, overheads, disposal including supply of all materials, labours, tools, plants, fuel, loading unloading & transportation of hitachi to work site and all other charges etc complete
KML CONSTRUCTION (BID ID -3216200)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .