Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -5.54% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance | -3.00% | ₹1.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.6 CrAdmitted-Finance | -2.00% | ₹1.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.6 CrAdmitted-Finance | -1.00% | ₹1.6 Cr | L4 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
20 Apr 2026, 3:00 pmClosed
EE,RMD-2,DDA
EE,RMD-2,DDA
Restoration of 100 foot cc road portion from KSN Drain to Sector-20, Rohini (Deposit Work)
2026_DDA_904780_1
01/EE/RMD-2/DDA/2026-27
Open Tender
Civil Works
90 days
Rohini
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹3.2 L
30 Apr 2026
8 Apr 2026
21 Apr 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
a) All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
a) With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Construction of dry lean cement concrete sub base over a prepared subgrade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in- charge. | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Cement content considered in M-30 is @ 340 Kg/cum. Nothing extra will be paid if extra cement is used. The contractor shall have discretion to either redesign the mix or bear the extra cost of cement. Note: Cement content considered in M-30 is @ 340 kg/cum. Less cement used as per design mix is recoverable separately. In case the cement content in design mix is more than the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
a) Cement concrete manufactured in automatic batching plant (RMC plant) i/c transportation to site in transit mixer. | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compound impregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A. | - | per cm depth per cm width per metre length | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Providing & laying in position separation membrance of impermeable plastic sheeting 125 micron thick as per direction of Engineer-in-charge. | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Disposal of earth by mechanical means, including loading, transporting, unloading for a lead of 1 Km. as approved by Engineer-in-charge, for all lifts involved. | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Total ₹ 16,651,684.00 | - | - | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_951002.xls
BOQ • 0.29 MB
NIT01.pdf
Tender Documents • 2.54 MB
Download all tender documents and submit your bid