Tender Value
₹6.2 L
EMD Value
₹62,080
Closing Date
13 Jul 2026, 3:00 pm5d left
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction work for the damaged boundary wall of the Baba Lal Das cremation ground in Ward 22.
2026_NNSAH_1167015_1
6270 B
Open Tender
Civil Works
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹62,080
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Brick Work or stone work in lime or cement mortar and including stacking of materials as Directed by the Engineer-in-charge with in a distance of 60 meter(200feet) | 21.22 | cum | 400 | ₹8,488 |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excavated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches.(SOR UP PWD SI - 251A) | 18.36 | cum | 90 | ₹1,652.4 |
| 3 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site (SOR UP PWD SI - 131(A) | 16.52 | cum | 130 | ₹2,147.6 |
| 4 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 273) | 2.04 | cum | 2,985 | ₹6,089.4 |
| 5 | M-150 Brick Work in 1:5 cement & coarse sand Mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper ompletion of the work. (SI -304) | 14.4 | cum | 4,280 | ₹61,632 |
| 6 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.287) | 4.75 | cum | 5,920 | ₹28,120 |
| 7 | Reinforced Cement Concrete with 2c.m.gauge approved stone ballast, coarse sand & cement in the proportion of 3:1.5:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I.289) | 8.42 | cum | 7,800 | ₹65,676 |
| 8 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclding bending for proper complition of the work and including supply of all steel & wastage, bend, | 1,034.35 | kg | 85.29 | ₹88,219.8 |
| 9 | M-150Brick work in one cement & Four course sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 305a) | 29.73 | cum | 4,690 | ₹1,39,419.63 |
| 10 | 12 mm thick plaster with with cement and approved Fine sand mortar in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work.( S.I. - 584A ) | 258.45 | sqm | 165 | ₹42,644.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_2188846.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid