Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
13 Jul 2026, 11:00 am5d left
District Forest Officer, Erode
District Forest Office, Erode Forest Division, Erode - 638004
Strengthening of Existing Road from Tamaraikarai to Thalakarai Km of 0/0-6/735
2026_TNFD_681401_1
ERDDIV/507/2025-JDO
Open Tender
Civil Works - Roads
Bargur Village - Erode
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.5 L
District Forest Office, Erode Forest Division
17 Jun 2026
17 Jun 2026
15 Jul 2026
17 Jun 2026
13 Jul 2026
17 Jun 2026
17 Jun 2026 - 9 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NAME OF WORK : STRENGTHENING THE ROAD FROM THAMARAIKARAI TO THALAKARAI kM 0/0 – 6/735 HILLS FOREST ROAD IN ERODE FOREST DIVISION DURING 2025 -26 | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 3,780 | Sqm | - | - |
| 3 | Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils as per 20A | 945 | Cum | - | - |
| 4 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 112.5 | Cum | - | - |
| 5 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | - | - | - | - |
| 6 | km 0/0 to 1/0 | 150 | Cum | - | - |
| 7 | Km 1/0 to2/00 | 150 | Cum | - | - |
| 8 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 2,500 | Sqm | - | - |
| 9 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 937.5 | Cum | - | - |
| 10 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 7,500 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_818890.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid