| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.3 LAccepted-AOC MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹3.4 L+₹4,120 (1.23%)Rejected-AOC | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹5.4 L+₹2.1 L (62.2%)Rejected-AOC | L-3 | Rejected-AOC Reject |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
21 Aug 2020, 12:00 pmClosed
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
For the Work of Maintenance Damage 11KV nd LT Lines and Their Accessories due to unexpected Reasons time to time under EDD 4 Kiraoli
2020_DVVNL_498258_2
04/EDCA/2020-21
Open Tender
Electrical Works
Piece-work
365 days
B-690 Kamla Nagar Agra
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹5,000
21 Jan 2021
8 Aug 2020
21 Aug 2020
8 Aug 2020
21 Aug 2020
8 Aug 2020
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) a) PCC Pole 8.5 Mtr. Long
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) b) ST Pole 9/11 Mtr. Long
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C) 400 KVA T/F
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) D) 250 KVA T/F
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 100 KVA T/F
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 63 KVA T/F
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F) 25 KVA T/F
Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
Erection and grouting of single pole on 8.5 Mtr. long PCC poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of Double pole on 8.5 Mtr. long PCC poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of single pole on 9/11 Mtr. long ST poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier, groputing material etc. required for proper completion of work shall be provided by the contractor.
Erection and grouting of double pole on 9/11.0 Mtr. long ST poles including fixing of accessories for double pole S/s as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductorIn 11 KV line /Aerial Bunch conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductorIn 11 KV line /Aerial Bunch conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR/DOG RACOON CONDUCTOR
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductorIn 11 KV line /Aerial Bunch conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) AB Conductor 3x50 mm
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductorIn 11 KV line /Aerial Bunch conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) AB Conductor 3x95 mm
Laying sagging stringing and binding and jumpering etc of ACSR Weasal conductorIn 11 KV line /Aerial Bunch conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) AB Conductor 3x120 mm
Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel Conductor
Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon Conductor
Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor.
Re- sagging and stringing of existing following conductor in HT /LT line as per direction of supervising engineer :- (A) ACSR Wease Conductor
Re- sagging and stringing of existing following conductor in HT /LT line as per direction of supervising engineer :- (A) ACSR Dog Conductor
Re- sagging and stringing of existing following conductor in HT /LT line as per direction of supervising engineer :- C)50/95/120 sqmm Areal Bunch Conductor.
Construction of plinth for 250/400 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out.
Fencing of 250/400 KVA T/Fs:- Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2"x1.5", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system &Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
Earthing of 250 / 400 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
Installation of 250 KVA T/F on plinth in proper alignment and direction & making HT/LT connection. providing "L" type alminium bus bar and suitable size alminium lugs
Installation of 400 KVA T/F on plinth in proper alignment and direction & making HT/LT connection. providing "L" type alminium bus bar and suitable size alminium lugs
Installation of following T/F on newly erected double pole & making HT/LT connection. A)100 KVA T/F
Installation of following T/F on newly erected double pole & making HT/LT connection. B) 63 KVA T/F
Installation of following T/F on newly erected double pole & making HT/LT connection. C) 25 KVA T/F
Opening of service cable of consummers and re-fixing the same after replacement of conductor.
Removal of 250 KVA T/F from plinth/double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 100 KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 63 KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 25KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Fixing of LT dustribution boxes on Newly/ already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
A) Digging of Pit around the 9/11/13 Mtr. Rusted ST Pole/R.S. JOIST (1.5"x1.5") & Approximately 2 feet below the ground level B) Providing & Fixing of 2 Nos. M.S. angle Clamp (each clamp having 2 no. M.S. angle 65x65x8mm 3 ft in length jointed in round shape by M.S. Flat of 65x8 mm) The work include providing material all fabrication & fixing of clamp by 4 No. Nut bolt & wahsers & welding work at site C) Construction of Plinth in CC-1:4:8 2 ft. Below the ground level and 2 ft. above the ground level around the ST Pole.D) Painting of Plinth above ground level by yellow enamel paint of good quality.
Gowri Associates
MITTAL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .