| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹71.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹72.5 L+₹58,866.05 (0.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹77.0 L+₹5.1 L (7.08%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹77.1 L+₹5.2 L (7.27%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹82.9 L
EMD Value
₹1.7 L
Closing Date
22 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Upgradation (Macadamiation) of the approach Road leading to Jammu University Campus at Rakhi Arath Bemina
2026_PWDJK_324523_1
NIT_No_84_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
Bemina
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer RnB Division Budgam
₹1.7 L
24 Sept 2026
12 Sept 2026
24 Sept 2026
12 Sept 2026
22 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge in all kinds of soil. | 1,980 | Sqm | 91.75 | ₹1,81,665 |
| 2 | Providing and laying Khak Bajri/Nallah Mukh/GSB including leveling, watering an consolidation with power road roller of 8 to 12 tonne capacity to required gradient and camber, all carriage complete. | 850 | Cum | 1,000 | ₹8,50,000 |
| 3 | Providing, laying, spreading and compacting stone aggregate of size 63 mm to 45 mm to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fill up interstices of coarse aggregate, watering and compacting to the required density including carriage upto site of work. | 281.25 | Cum | 2,650 | ₹7,45,312.5 |
| 4 | Providing/Laying, Spreading and Compacting graded stone aggregate size (43 mm - 0.075 mm) to wet mix Macdam (WMM) specification including premixing the material with water at OMC in metallic mix plant, carriage of mixed material by tipper to site for avg. lead of 40 km, laying in uniform layers with mechanical paver finisher in subgrade/base course on well prepared surface and compacting with vibratory roller of 8-10 tonne capacity to achieve the desired density complete as per the specifications and as per specifications of engineer in charge. | 435.94 | Cum | 1,885.95 | ₹8,22,156.33 |
| 5 | Providing and applying tack coat on W.B.M. @0.74 Kg/sqm using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. | 5,812.5 | Sqm | 74.35 | ₹4,32,159.37 |
| 6 | Providing and applying 50 mm thick Bituminous Macadam base course with stone aggregate of quantity size and grading as specified in CPWD specifications and straight run bitumen of 80/100 @3.5 % by weight of total mix including hot mixing of stone aggregate and bitumen in hot mix plant, transporting and laying mixed material with paver finisher to the required level and grade, rolling with road roller of 8-10 tonne capacity to achieve the required compaction and density including Cost and carriage of all materials involved upto site of work complete, tools, plants, equipments and all allied machinery, labour taxes, fee, testing charges for maintaining quality control during and after execution of work complete in all respects including cost and carriage of bitumen. | 290.63 | Cum | 8,590.95 | ₹24,96,744.84 |
| 7 | Providing and laying 25 mm thick Semi Dense Bituminous Concrete using material aggregate satisfying the gradation set out in specification with 5 % binder content (by weight of total mix) bitumen of grade VG 10 with the laid of hot mix plant and paver finisher incl. rolling with 8-10 tonne capacity road roller to achieve the required compaction and density (with bitumen 80/100) incl. cost and carriage of all materials involved upto site of work complete, tools, equipments and all allied machinery, labour, taxes, fee, testing charges for maintaining quality control during and after execution of work complete in all respects incl. cost and carriage of bitumen including all carriages. | 5,812.5 | Sqm | 293.1 | ₹17,03,643.75 |
| 8 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | 5,812.5 | Sqm | 101.4 | ₹5,89,387.5 |
| 9CONCRETE WORK | |||||
| 9.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 23.94 | Cum | 256.85 | ₹6,148.99 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_1094687.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .