| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81.7 LAdmitted-Finance BARMER RAJASTHAN 344001 INDIA UDYAM RJ 05 0019238 | BARMER | RAJASTHAN | 344001 | -14.11% | ₹81.7 L | L1 | Admitted-Finance |
| 2 | L2₹93.3 L+₹11.6 L (14.2%)Admitted-Finance | -1.89% | ₹93.3 L+₹11.6 L (14.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹36.2 L (44.4%)Admitted-Finance | +23.99% | ₹1.2 Cr+₹36.2 L (44.4%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹39.6 L (48.4%)Admitted-Finance 79 12 SHIPRA PATH MANSAROVER JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | +27.50% | ₹1.2 Cr+₹39.6 L (48.4%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee | - | - | - | Not Admitted-Fee Fee not received |
Tender Value
₹95.1 L
EMD Value
₹1.9 L
Closing Date
9 Mar 2026, 3:00 pmClosed
Chief Engineer (Civil)
O/o Chief Engineer (Civil), 712, 7th Floor, LIC Investment Building, Lalkothi Scheme, Jaipur
Construction of boundary wall around available 35 Bigha Land near Urja Nagar Township at GLPL, Barmer
2026_RRVUN_536844_1
TNC-14/2025-26
Open Tender
Civil Works
Percentage
300 days
Giral
As per PQR
3 documents required · 3 mandatory
₹5,900
Rajasthan Rajya Vidhyut Utpadan Nigam
₹1.9 L
3 Jun 2026
12 Feb 2026
10 Mar 2026
12 Feb 2026
9 Mar 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | 5,500 | Sqm | 9 | ₹49,500 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in widthior 10
sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 1,650 | Cum | 178 | ₹2,93,700 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering -
All work up to plinth level. M15 grade Nominal Mix
1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40 mm nominal size). | 150 | Cum | 3,302 | ₹4,95,300 |
| 4 | Random Rubble stone masonry for with hard stone in
foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 400 | Cum | 2,838 | ₹11,35,200 |
| 5 | Random Rubble stone masonry with hard stone in
superstructure above plinth level and upto five level above 30cm. thick walls in :Cement Mortar 1:6 (1-Cement:6-Sand): | 660 | Cum | 3,479 | ₹22,96,140 |
| 6 | Add extra for Random Rubble stone masonry with hard stone in: Wall upto 30cm. and less thickness. | 660 | Cum | 186 | ₹1,22,760 |
| 7 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers(
if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix/ Design Mix | 245 | Cum | 4,934 | ₹12,08,830 |
| 8 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cemernt:3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments,
posts and struts etc. M20 grade Nominal Mix/ Design Mix | 70 | Cum | 5,609 | ₹3,92,630 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting. propping bracing both ways| with steel props and removal of formwork for upto floor |five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajas, lintel, beam, plinth beam etc. | 710.5 | Sqm | 340 | ₹2,41,570 |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 888 | Sqm | 375 | ₹3,33,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
TenderDocuments.pdf
Tender Documents • 37.65 MB
BOQ_957920.xls
BOQ • 0.34 MB
Extension1Eproc.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .