Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-AOC 10 PARISH NAGAR CIVIL AERODROME COIMBATORE 641014 | COIMBATORE | COIMBATORE | TAMIL NADU | 641014 | ₹5.8 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹5.8 LRejected-AOC 3 165 1A KAMARAJ NAGAR KANGAYAMPALAYAM SULUR COIMBATORE TAMIL NADU 641 401 | COIMBATORE | COIMBATORE | TAMIL NADU | 641401 | ₹5.8 L | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Vishnu Infrastructures L2 | VM AGENCY L1 |
|---|---|---|---|---|---|
| 1.00Providing two legged scaffolding using 15cm dia blue-gum posts of 4.0m overall length (3M HT + 0.5M projection + 0.5m into ground) the distance between two rows being 1.25m and the spacing of postsbeling 2.0m and the spacing of postsbeling 2.0m in both the rows with two horizontal posts with 0.5m overlap on either sideand braces at 2m c/cincluding longitudinal and transverse middle braces to step up and providing aplatform with country woodplanksof 40mm tk & 1.0m width in a complete form using colr and nalls - 1.0m run -- FOR REJUVENATION WORKS | |||||
| 1.10 | 0.00 -3.00 m | 18 | m | 383.6 ₹6,904.80 | 383.21 ₹6,897.78 |
| 1.20 | 3.00 -5.50 m | 18 | m | 675.13 ₹12,152.34 | 674.46 ₹12,140.28 |
| 1.30 | 5.50 -8.00 m | 18 | m | 966.67 ₹17,400.06 | 965.7 ₹17,382.60 |
| 1.40 | 8.00 -10.50 m | 18 | m | 1,258.21 ₹22,647.78 | 1,256.95 ₹22,625.10 |
| 2.00 | Plastering in Cement Mortar 1:3 Mix (one Cement, Three sand ) 20mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications. | 65 | m2 | 296.56 ₹19,276.40 | 296.27 ₹19,257.55 |
| 3.00 | Plastering with cement mortar 1:3 ( One cement and three sand)10 mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification | 15 | m2 | 325.25 ₹4,878.75 | 324.93 ₹4,873.95 |
| 4.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 28 | m3 | 232.23 ₹6,502.44 | 232 ₹6,496 |
| 5.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 4 | m3 | 5,496.03 ₹21,984.12 | 5,490.53 ₹21,962.12 |
| 6.00 | Supplying fabricating and placing in position of steel rods using M.S. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 900 | Kg | 91.77 ₹82,593 | 91.68 ₹82,512 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
10 Nov 2025, 3:00 pmClosed
Executive Officer, Mopperipalayam Town Panchayat
Mopperipalayam Town Panchayat Office, Vagarayampalayam
Construction of Compund Wall, Repairs and Maintanance of 60000 OHT at ward No.1 Near Karupparayan Kovil in Mopperipalayam Town Panchayat.
2025_DTP_618908_1
402/2025 -F7
Open Tender
Civil Works
90 days
Works
As Per Norms
2 documents required · 2 mandatory
₹0
₹7,000
Yes
18 Feb 2026
30 Oct 2025
10 Nov 2025
30 Oct 2025
10 Nov 2025
30 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_739867.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid