| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹11.3 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹11.3 LAccepted-Finance | ₹11.3 L | L2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | P. GOVINDHARAJ L2 | C.Periyasamy L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Retaining Wall near Culvert at Geadi Kottai Village H/o Erumampatti - Rs. 11.45 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 55.91 | Cum | 264.31 ₹14,777.57 | 263.54 ₹14,734.52 |
| 3.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 11.19 | Cum | 5,464.59 ₹61,148.76 | 5,448.77 ₹60,971.74 |
| 4.00 | Cement concrete 1:3:6 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers. | 129.3 | Cum | 5,735.13 ₹7.4 L | 5,718.53 ₹7.4 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle. | 256.21 | Sqm | 548.6 ₹1.4 L | 547.01 ₹1.4 L |
| 6.00 | Providing Name board including Painting and lettering etc complete. | 1 | HR | 1,002 ₹1,002 | 999.1 ₹999.10 |
| 7.00 | Provision for Photographics charges | 1 | Bill | 300.6 ₹300.60 | 299.73 ₹299.73 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,72,681 ₹1.7 L | 1,72,181 ₹1.7 L |
Tender Value
₹11.4 L
EMD Value
₹12,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Block Development Officer BP
Kaveripattinam Panchayat Union Office
Kgi Dt Kptm Block UGF 2025 26 Retaining Wall at Erumampatti Pts Pck no 2025 2026 KPTM 40
2026_RDTN_659425_1
830_2025_A5_DT_21_01_2026
Open Tender
Civil Works
180 days
Kaveripattinam Panchayat Union Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
Kaveripattinam Panchayat Union Office
5 Mar 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
17 Feb 2026
1.Construction of Retaining Wall near Culvert at Geadi Kottai Village H/o Erumampatti - Rs. 11.45 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement concrete 1:3:6 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle.
Providing Name board including Painting and lettering etc complete.
Provision for Photographics charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.28 MB
TB40.pdf
Tender Documents • 0.93 MB
PB40.pdf
Tender Documents • 0.86 MB
BOQ_791154.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid