Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.4 L+₹51,014.54 (3.02%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | MTB ENTERPRISES L1 | tech infra L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning the surface of by removing all waste, debris etc., and make the surface neat and clean to lay concrete including cost of all labour, lead, lift T&P etc., | 798 | m2 | 13.3 ₹10,613.4 Lowest | 14 ₹11,172 |
| 2.00 | Chipping the surface and roughening the surface to receive patch concrete including cost of all materials, labour, lead, lift, etc, complete | 798 | m2 | 51.41 ₹41,025.18 Lowest | 53 ₹42,294 |
| 3.00 | Supplying, cutting, bending, tying and placing in position of required dia RTS rods, lead, lift, transporting, binding wire, welding operation etc., complete as instructed by the Engineer at site. | 3,076 | kg | 95.98 ₹2,95,234.48 Lowest | 99 ₹3,04,524 |
| 4.00 | Shuttering work for Flooring sides including cost of all materials, labour, lead, lift etc, complete | 24 | m2 | 744.6 ₹17,870.4 Lowest | 767 ₹18,408 |
| 5.00 | Providing RCC M15 Grade, mix using 12 to 20mm graded hard machine broken granite metal with minimum cement of 315 Kg/m3 and maximum water cement ratio of 0.5 including vibrating, cutting, cost of all materials, labour, lead, lift etc, complete all as per specification but excluding cost of steel reinforcement and as directed by site Engineer incharge of the work | 160 | m3 | 8,284 ₹13,25,440 Lowest | 8,530 ₹13,64,800 |
Tender Value
Refer Docs
EMD Value
₹15,600
Closing Date
17 Feb 2025, 2:00 pmClosed
SE CM NCTPS II
Office of CE NCTPS II Chennai-120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Raising the floor level by Providing RCC to avoid water stagnation at 0 m level of SSCC IMC UnitI area
2025_EB_522524_1
CE/NCTPS-II/SE/CM/50/2024-25
Open Tender
Civil Works
Works
90 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,600
Yes
1 Nov 2025
4 Feb 2025
18 Feb 2025
4 Feb 2025
17 Feb 2025
4 Feb 2025
Amount
Cleaning the surface of by removing all waste, debris etc., and make the surface neat and clean to lay concrete including cost of all labour, lead, lift T&P etc.,
Chipping the surface and roughening the surface to receive patch concrete including cost of all materials, labour, lead, lift, etc, complete
Supplying, cutting, bending, tying and placing in position of required dia RTS rods, lead, lift, transporting, binding wire, welding operation etc., complete as instructed by the Engineer at site.
Shuttering work for Flooring sides including cost of all materials, labour, lead, lift etc, complete
Providing RCC M15 Grade, mix using 12 to 20mm graded hard machine broken granite metal with minimum cement of 315 Kg/m3 and maximum water cement ratio of 0.5 including vibrating, cutting, cost of all materials, labour, lead, lift etc, complete all as per specification but excluding cost of steel reinforcement and as directed by site Engineer incharge of the work
tech infra (BID ID -1251394)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .