| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹1.6 L+₹16,270 (11.0%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
26 Jun 2020, 11:00 amClosed
SUPERINTENDING ENGINEER
EDC III BULANDSHAHR
REPLACEMENT OF DAMAGE CABLE AND 33 KV LINE GUARDING OF 11 KV LOOSE LINE IN EDD JAHANGIRABAD BY INVITING SHORT TERM TENDER.
2020_PVVNL_482981_1
T-18/EDC-III/B/2020-2021
Open Tender
Electrical Works
Lump-sum
15 days
BULANDSHAHR
REPLACEMENT OF DAMAGE CABLE AND 33 KV LINE GUARDING OF 11 KV LOOSE LINE IN EDD JAHANGIRABAD BY INVITING SHORT TERM TENDER.
2 documents required · 2 mandatory
₹1,180
ICICI BANK
₹2,000
Yes
4 Jul 2020
12 Jun 2020
26 Jun 2020
12 Jun 2020
26 Jun 2020
12 Jun 2020
Amount
fo|qr forj.k [k.M&tgkWxhjkckn ds vUrxZr 33 ds0oh0 ykbZu dh xkfMZax] 11 ds0oh0 ttZj ykbZu dks cnyus ,oa {kfrxzLr dsfcy cnyus dk dk;ZA
Carriage of line material (like AB CABLE, Earthing Rod com.19nos, Stay set Com. 09 nos, abc hook witk clamp for PCC Pole 11 nos, Ditribution box singal phase with fixing clamps 48 Nos, PRC 95/50mm2, LT lead for T/F etc from Electricity Store Center, Bulandshahar to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of OLD line material from SITE TO Electricity Store Center, Bulandshahar with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole- 11 support from Electricity store center, Bulandshahar/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Complete Erection of PCC Pole 8.5 Mtr
Carriage of STP Pole- 3 support from Electricity store center, Bulandshahar/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Complete Erection of STP Pole 13 Mtr
Laying , Stringing and final sagging of AB CABLE 3X95 SQMM after binding from Insulator, as per RESPO/Drawing Norms.
Laying , Stringing and final sagging of AB CABLE 3X50 SQMM after binding from Insulator, as per RESPO/Drawing Norms.
FIXING OF earthing rod Com.
FIXING OF Distribution box singal phase with fixing clamp
FIXING OF ABC hook with clam for PCC pole
FIXING OF stay set Com.
FIXING OF PRC CONNECTOR FOR 95mm2
FIXING OF PRC CONNECTOR FOR 50mm2
FIXING OF LT Lead for T/F
A K ELECTRICAL ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .