| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-AOC | ₹2.2 L | 1 | Accepted-AOC lowest amount quotted |
| 2 | 2₹2.2 LRejected-AOC | ₹2.2 L | 2 | Rejected-AOC highest amount quotted |
| 3 | 3₹2.3 LRejected-AOC | ₹2.3 L | 3 | Rejected-AOC highest amount quotted |
| 4 | 4₹2.4 LRejected-AOC | ₹2.4 L | 4 | Rejected-AOC highest amount quotted |
| 5 | 5₹2.7 LRejected-AOC KANIYANUR PANCHAYAT | ₹2.7 L | 5 | Rejected-AOC highest amount quotted |
| Sl No | Description | Qty | Unit | R.SHANTHA L2 | M RAVIANAND L4 | MUNIRATHINAM CONTRACTOR L6 | Thanappa a L1 | SPR TRADERS L5 | K Senthilkumar L7 | U.Abhishekwaran Contractor L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Drainage with Culvert in Kavanur ADC H/O Kavanur Panchayat in Thimiri Panchayat Union | ||||||||||
| 1.01 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A. | 21.6 | Cum | 240 ₹5,184 | 150 ₹3,240 | 260 ₹5,616 | 246 ₹5,314 | 263.78 ₹5,698 | 270 ₹5,832 | 100 ₹2,160 Lowest |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 3.6 | Cum | 4,508 ₹16,229 | 5,505.2 ₹19,819 | 5,500 ₹19,800 | 4,500 ₹16,200 Lowest | 5,505.2 ₹19,819 | 5,500 ₹19,800 | 4,500 ₹16,200 Lowest |
| 1.03 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 72 | Sqm | 473 ₹34,056 | 380 ₹27,360 Lowest | 540 ₹38,880 | 480 ₹34,560 | 530 ₹38,160 | 540 ₹38,880 | 500 ₹36,000 |
| 1.04 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 8.28 | Cum | 5,002 ₹41,417 | 6,000 ₹49,680 | 6,290 ₹52,081 | 5,000 ₹41,400 Lowest | 6,291.57 ₹52,094 | 6,290 ₹52,081 | 5,600 ₹46,368 |
| 1.05 | Floor plasterin in CM 1:4 mix using 20mm thick including all cost and conveyance and etc complete | 13.5 | Sqm | 168 ₹2,268 Lowest | 592.68 ₹8,001 | 590 ₹7,965 | 170 ₹2,295 | 592.68 ₹8,001 | 600 ₹8,100 | 200 ₹2,700 |
| 1.06Provision for New Culvert ( Sub Estimate ) | ||||||||||
| 1.07 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A. | 7.2 | Cum | 240 ₹1,728 | 263.78 ₹1,899 | 260 ₹1,872 | 246 ₹1,771 | 263.78 ₹1,899 | 260 ₹1,872 | 200 ₹1,440 Lowest |
| 1.08 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 1.2 | Cum | 4,813 ₹5,776 | 5,505.2 ₹6,606 | 5,500 ₹6,600 | 4,800 ₹5,760 Lowest | 5,505.2 ₹6,606 | 5,500 ₹6,600 | 5,000 ₹6,000 |
| 1.09 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 44.72 | Sqm | 396 ₹17,709 | 380 ₹16,994 Lowest | 545 ₹24,372 | 400 ₹17,888 | 547.5 ₹24,484 | 545 ₹24,372 | 500 ₹22,360 |
Tender Value
Refer Docs
EMD Value
₹2,760
Closing Date
5 Mar 2026, 3:00 pmClosed
Block developement officer
Block developement office
Construction of Draiange with Culvert in Kavanur ADC H/O Kavanur Panchayat in Thimiri Panchayat Union
2026_RDTN_667934_1
A2/2396/2023
Open Tender
Civil Works
Item Wise
180 days
Block developement office
Construction of Draiange with Culvert in Kavanur ADC H/O Kavanur Panchayat in Thimiri Panchayat Union
2 documents required · 2 mandatory
₹0
₹2,760
Block developement office
25 May 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
27 Feb 2026
Construction of Drainage with Culvert in Kavanur ADC H/O Kavanur Panchayat in Thimiri Panchayat Union
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Floor plasterin in CM 1:4 mix using 20mm thick including all cost and conveyance and etc complete
Provision for New Culvert ( Sub Estimate )
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and fabrication of Steel for RCC items including all cost and conveyance and etc complete
RCC 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Provision for Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_802512.xls
BOQ • 0.29 MB
kavanurdrain.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].