| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 CrAdmitted-Finance | -25.00% | ₹10.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.3 Cr+₹54.7 L (5.09%)Admitted-Finance | -23.51% | ₹11.3 Cr+₹54.7 L (5.09%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Singhal traders L1 | KHANDELWAL CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying lime concrete in founding and plinth using 1: 2:4 (1 lime: 2 Coarse sand: 4 graded stone aggregate 20 mm nominal size) including ramming and | 95.76 | Cum | 3,690 ₹3,53,354.4 | 3,500 ₹3,35,160 Lowest |
| 2.00 | Watering complete in all respect. Random rubble stone massanry for foundation and plinth in lime surkhi mortar 1:2 (1 Lime: 2 surkhi) | 612.86 | Cum | 2,700 ₹16,54,732.8 Lowest | 3,000 ₹18,38,592 |
| 3.00 | Random rubble stone masonry for superstructure above plinth level in lime surkhi mortar 1:2 (1 Lime: 2 surkhi) | 1,972.66 | Cum | 3,024 ₹59,65,311.74 Lowest | 3,500 ₹69,04,296 |
| 4.00 | Providing and fixing double scaffolding system on the exterior/Interior side upto seven storey height, irrespective of duration of scaffolding (to be used for maintenance work judicially) | 41,344 | Sqm | 150 ₹62,01,600 Lowest | 250 ₹1,03,36,000 |
| 5.00 | Making band-patta, cornice, gola & string course with katla stone and lime surkhi mortar 1:2 (projected) and finishing with grinded lime surkhi mortar 1:2 including moulding, design work as per existing matching at site complete in all respect, size 20 cm x 15 cm | 6,080 | Mtr | 459 ₹27,90,720 | 300 ₹18,24,000 Lowest |
| 6.00 | Making garden under celling/chaja with katla strone and grinded lime mortar 1:2 including moulding work as per existing traditional partice complete in all aspect size 25 cm x 25 cm | 3,040 | Mtr | 1,098 ₹33,37,920 | 100 ₹3,04,000 Lowest |
| 7.00 | Providing and spray/brushing of Gur, gugal & methi solution for bonding of lime work as per specification (200 gm gugal, 200 gm belgiri powder, 200 gm methi powder and 1 kg Gur mixed in 20 litre water and boiled and sttired mixed till the solution volume reduce upto 3/4th) using 15 litre solution in 10 spm area | 41,344 | Sqm | 75 ₹31,00,800 | 30 ₹12,40,320 Lowest |
| 8.00 | Providing khat work on the finished surface of khamira wash as per traditional practice. | 41,344 | Sqm | 150 ₹62,01,600 Lowest | 260 ₹1,07,49,440 |
Tender Value
₹14.7 Cr
EMD Value
₹29.4 L
Closing Date
21 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PROJECT-II
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
CONSERVATION WORK OF PARKOTA WALL IN NAGAR NIGAM JAIPUR
2026_DLB_567564_1
07 EXECUTIVE ENGINEER PROJECT-II
Open Tender
Miscellaneous Works
Percentage
450 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹20,000
ONLINE PAY IN JAIPURMC WEBSITE
₹29.4 L
Yes
JAIPUR
7 Aug 2026
15 Jun 2026
24 Jul 2026
16 Jun 2026
21 Jul 2026
6 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (40.34) De-vegetation from monument by removing bushes, trees including complete uprooting from the wall & roofs/structures carefully including suitable chemical treatment to roots to avoid further growth including disposal of rubbish within 50 mtr. Lead as per direction of Engineer in-charge. | 10,275.2 | Sqm | 437 | ₹44,90,262.4 |
| 2 | (40.25) Scraping & Removing of white wash/ distemper/algli etc. from plain plaster & surfaces gently with care to keep intact the old designs | 37,209.6 | Sqm | 56.3 | ₹20,94,900.48 |
| 3 | (40.26) Scraping & Removing of white wash/ distemper/oil paint/algli etc. from lime plaster highly decorative, ornamental and stucco work with at most care by using fine sand paper under the close supervision to keep intact the old designs. | 4,134.4 | Sqm | 175.5 | ₹7,25,587.2 |
| 4 | (40.22) Tuman masonry by brick bats/ stones in grinded mortar of Lime Surkhi mortar 1:2/lime sand mortar 1:2 including racking and removal of all old loose plaster and cleaning the wall surface properly as per direction of Engineer In-charge. | 24,806.4 | Sqm | 503 | ₹1,24,77,619.2 |
| 5 | (40.5.1) P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to be done after 3 days of previous coat 33 mm thick in four coats | 20,672 | Sqm | 415 | ₹85,78,880 |
| 6 | (40.5.2) P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to be done after 3 days of previous coat 45 mm thick in four coats | 4,134.4 | Sqm | 448.5 | ₹18,54,278.4 |
| 7 | (40.8) Add extra over item no. 40.5.2 for Lime plaster work done over Spherical or groin ceiling/ladao ceiling of domes. | 826.88 | Sqm | 332 | ₹2,74,524.16 |
| 8 | (40.9) Add extra over item no. 40.5 to 40.6 for Lime plaster work done over flat ceiling. | 826.88 | Sqm | 89.7 | ₹74,171.14 |
| 9 | (40.7) Making Mehrab's, Arches, pillars, highly decorative creepers, flower of small sizes etc.in lime Surkhi plaster (1:2) as per B248old traditional practices (Arches, Mehrab's) in three coats for base course and subsequent course and Loi tamping, beating till the shrinkage cracks are disappear than making ornamental flowering/design etc. The work is to done with all leads and lifts as per work of restoration nature as per Jaipur practice. | 8,268.8 | Sqm | 883 | ₹73,01,350.4 |
| 10 | (40.18) Stucco work in lime, Surkhi, mortar (1:2) as per existing design work/ traditional practices by skilled craftsman, the stucco work should be done as per restoration nature, the mortar should be prepared by grinding mill adding gur, methi & gugal.. The thickness varies from 50 mm to 100mm as per the design (minimum rectangular surface area to be measured). | 826.88 | Sqm | 5,260 | ₹43,49,388.8 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
eproc07xenproject-II.pdf
Tender Documents • 9.27 MB
BOQ_1009538.xls
BOQ • 0.34 MB
pre-bid.pdf
PDF • 2.35 MB
corrigendum.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .