Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 L+₹10,169.08 (7.28%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,760
Closing Date
24 Jun 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division kathua
Executive Engineer PWD R and B Division kathua
Refer to BOQ
2026_PWDJK_312374_1
E-NIT No 33/2026-27/2695-99/G Dated 13.06.2026
Open Tender
Civil Works
Percentage
30 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division kathua
₹4,760
Executive Engineer PWD R and B Division kathua
1 Jul 2026
15 Jun 2026
25 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 1.1 | Cum | 2,516.85 | ₹2,768.54 |
| 2 | Demolishing cement concrete in 1:3:6 or richer mix (i.e.equivalent design mix) manually/by mechanical means including disposal of material , all leads and lifts as per direction of Engineer-incharge: | 3.91 | Cum | 1,725.2 | ₹6,745.53 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms , incl. disposal or filling of excavated earth wherever required as per the directions of Engineer-in-charge . | 9.67 | Cum | 256.85 | ₹2,483.74 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.79 | Cum | 4,826.5 | ₹13,465.94 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement: 3 coarse sand : 6 graded stone agg. 20mm nominal size) | 21.42 | Cum | 5,733.6 | ₹1,22,813.71 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone agg. 20 mm nominal size) | 2.52 | Cum | 7,788.4 | ₹19,626.77 |
| 7 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 18.6 | Sqm | 346.7 | ₹6,448.62 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level TheMetreo-Mechanically Treated bars of grade Fe-500D or more incl. all leads, lifts and carriage of material by M.T. / H.L. | 226.8 | Kg | 123.2 | ₹27,941.76 |
| 9Centring & shuttering incl.strutting propping etc and removal of form work for | |||||
| 9.01 | Foundations, footings, bases of columns etc. for mass concrete. | 49.6 | Sqm | 286.35 | ₹14,202.96 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1011069.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .