| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹11.5 L (5.25%)Admitted-Finance | ₹2.3 Cr+₹11.5 L (5.25%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | KHAN ENTERPRISES L1 | M/S ANURAG MISHRA CONTRACTOR & SUPPLIER L2 |
|---|---|---|---|---|---|
| 1.00Supply of Following Matarial as per relevent ISS | |||||
| 1.01 | Stone Pad 300x300x75 mm | 2,018 | No | 100 ₹2,01,800 Lowest | 150 ₹3,02,700 |
| 1.02 | Cross Arm holding Clamp | 768 | No | 300 ₹2,30,400 | 150 ₹1,15,200 Lowest |
| 1.03 | F-Braket | 768 | No | 300 ₹2,30,400 Lowest | 310 ₹2,38,080 |
| 1.04 | Holding Clamp for Tee Channel | 256 | No | 300 ₹76,800 Lowest | 310 ₹79,360 |
| 1.05 | Nut, Bolt & Washer | 1,152 | kg | 200 ₹2,30,400 Lowest | 220 ₹2,53,440 |
| 1.06 | Earthing Complete | 1,480 | No | 920 ₹13,61,600 Lowest | 930 ₹13,76,400 |
| 1.07 | Guarding Angle, Nut Bolt with eye bolt Complete | 1,024 | No | 1,500 ₹15,36,000 Lowest | 1,600 ₹16,38,400 |
| 1.08 | D/Pole Clamp | 1,375 | No | 300 ₹4,12,500 Lowest | 400 ₹5,50,000 |
| 1.09 | Eye Bolts for Service cables | 693 | No | 100 ₹69,300 Lowest | 110 ₹76,230 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
16 May 2024, 12:00 pmClosed
Se Edc Hathras
Se Edc Hathras
semi turnkey
2024_DVVNL_922797_2
EDCH-191/2023-24
Open Tender
Electrical Works
Item Rate
120 days
Se Edc Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Dvvnl
₹1.6 L
22 May 2024
10 May 2024
16 May 2024
10 May 2024
16 May 2024
10 May 2024
Amount
Supply of Following Matarial as per relevent ISS
Stone Pad 300x300x75 mm
Cross Arm holding Clamp
F-Braket
Holding Clamp for Tee Channel
Nut, Bolt & Washer
Earthing Complete
Guarding Angle, Nut Bolt with eye bolt Complete
D/Pole Clamp
Eye Bolts for Service cables
Bolt & Nuts
LT Clamp with Bolt & Nut
Pearcing Connector
L.T Distribution Box 3-Phase
Clamp for Distribution Box
M.S Top Channel 125x65x2240 mm
Dropper Channel 100x50x2028 mm
M.S Angle 75x75x6x2228 mm with Clamp
11 KV Fuse Set
Suspension Clamp with I-Hook
Dead End Clamp
Scope of work
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
Pcc Pole 8.5 Mtr. Long
11 KV Steel Cross Arm V Type 65x65x6 mm
11 KV Pin Insulator
11 KV Pin with Nut
11 KV Disc Insulator
11 kv Disc Fitting
H.T Tee Channel
ACSR weasel Conductor
Stay set Complete
G.I Wire 6 SWG
G.I Wire 8 SWG
16 KVA 11/0.4 KV T/F
25 KVA 11/0.4 KV T/F
63 KVA 11/0.4 KV T/F
100 KVA 11/0.4 KV T/F
LT XLPE Cable 3.5x70 Sqmm for 25 kva
LT XLPE Cable 3.5x70 Sqmm for 25 kva
Arreal Bunch Conductor 3x50 mm
Arreal Bunch Conductor 3x95 mm
11 KV TPMO with Polymer Insualator
1x16 sqmm PVC Cable Single core
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
8.5/9 Mtr PCC Pole
Double pole
Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work
11 KV Steel Cross Arm V Type 65x65x6 mm
11 KV Pin Insulator
11 KV Pin with Nut
11 KV Disc Insulator
11 kv Disc Fitting
H.T Tee Channel
M.S Top Channel 125x65x2240 mm
Dropper Channel 100x50x2028 mm
M.S Angle 75x75x6x2228 mm with Clamp
11 KV Fuse Set
11 KV TPMO with Polymer Insualator
Suspension Clamp with I-Hook
Dead End Clamp
Stone Pad 300x300x75 mm
Cross Arm holding Clamp
F-Braket
Holding Clamp for Tee Channel
Nut, Bolt & Washer
Earthing Complete
D/Pole Clamp
Eye Bolts for Service cables
Bolt & Nuts
LT Clamp with Bolt & Nut
Pearcing Connector
L.T Distribution Box 3-Phase
Clamp for Distribution Box
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
25 KVA 11/0.4 KV T/F
63 KVA 11/0.4 KV T/F
100 KVA 11/0.4 KV T/F
Installation of 16 KVA 11/0.4 KV T/F in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR weasel Conductor
LT XLPE Cable 3.5x70 Sqmm for 25 kva
LT XLPE Cable 3.5x70 Sqmm for 25 kva
Arreal Bunch Conductor 3x50mm
Arreal Bunch Conductor 3x95 mm
1x16 sqmm PVC Cable Single core
Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
M/S ANURAG MISHRA CONTRACTOR & SUPPLIER
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .