Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹4.4 L+₹33,213.78 (8.17%)Accepted-Finance | ₹4.4 L+₹33,213.78 (8.17%) | L2 | Accepted-Finance Responsive |
Tender Value
Refer Docs
EMD Value
₹7,815
Closing Date
29 Jun 2026, 3:00 pmClosed
Executive Engineer,CD-I, A.P.W.D., SVP
Executive Engineer,CD-I, A.P.W.D., SVP
Construction of DG Shed with RCC Foundation at PHC Govind Nagar Camp No.03 at Swaraj Dweep under CD-I, A.P.W.D., Sri Vijaya Puram
2026_APWD_23507_1
11/NIT/DB/CD-ISVP/26-27
Open Tender
Civil Works - Buildings
Percentage
30 days
Swaraj Dweep
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹7,815
2 Jul 2026
25 Jun 2026
29 Jun 2026
25 Jun 2026
29 Jun 2026
25 Jun 2026
25 Jun 2026 - 27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | |||||
| 1.1 | All kinds of soil | 0.57 | cum | 227.05 | ₹129.42 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.34 | cum | 19,016 | ₹25,481.44 |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 3.1 | Foundations, footings, bases for columns | 7.2 | sqm | 414.7 | ₹2,985.84 |
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 4.1 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.04 | cum | 23,653.1 | ₹1,42,864.72 |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | |||||
| 5.1 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 531.72 | kg | 131.7 | ₹70,027.52 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tendernotice_2.pdf
PDF • 23.64 MB
TenderdocDGShedrecall.pdf
Tender Documents • 23.63 MB
BOQ_24918.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .