Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹59.8 L
EMD Value
₹6.0 L
Closing Date
21 Oct 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EO
NPP BANDA
w.no. Pranjali Store To Satyendra Verma Diveder
2026_DOLBU_1192199_17
1542/NPP/2026-27/Dt 19-09-2026
Open Tender
Civil Works
Percentage
90 days
npp banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,061
EO
₹6.0 L
14 Oct 2026
14 Oct 2026
22 Oct 2026
14 Oct 2026
21 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CC Road And Drain work | - | - | - | - |
| 2 | Earthfilling of soil upto 5 km. | 421.88 | cum | 220.5 | ₹93,023.44 |
| 3 | Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.5meter (5ft) and lead upto 30m (100ft) and including filling warening & rimming of excavated earth into the trenches or into the space between the building and the sides of SI No. 251 | 54 | cum | 120 | ₹6,480 |
| 4 | Sand fillling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km. (5mile) from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. SI. No. 255 | 102.6 | cum | 1,000 | ₹1,02,600 |
| 5 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:4:8 in foundation and under floors with ass labour for completion of work SI No. 281 | 118.8 | cum | 4,300 | ₹5,10,840 |
| 6 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI no. 284 | 13.5 | cum | 6,800 | ₹91,800 |
| 7 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI no. 284a | 37.35 | cum | 7,200 | ₹2,68,920 |
| 8 | Mild steet of iron in plain work such as reinforced concrete/brick work (which not including all over rates) wrought to required shape as necessary including bending supply of steel, its wastage and hook and authorized over lapping shall be measured. SI. No. 504 | 23.95 | qtl | 7,798.28 | ₹1,86,768.81 |
| 9 | Laying of C.C. 1:1.5:3 for road | 540 | cum | 6,800 | ₹36,72,000 |
| 10 | S/L 125 micron polythene sheet | 2,700 | sqm | 20 | ₹54,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_2260297.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .