| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC quated rate | |
| 2 | L2₹2.7 L+₹31,741.91 (13.1%)Rejected-Finance VILLAGE PANJSEI P O HOLI TEHSIL BHARMOUR DISTRICT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-Finance hair bidder | |
| 3 | L3₹3.2 L+₹80,778.49 (33.4%)Rejected-Finance | L3 | Rejected-Finance hair bidder | |
| 4 | L4₹3.3 L+₹85,540.83 (35.4%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175001 | L4 | Rejected-Finance hair bidder | |
| 5 | L5₹3.3 L+₹86,958.78 (36.0%)Rejected-Finance VILLAGE GOLHUIEN PO KILOD TEHSIL DISTT CHAMBA HP | CHAMBA | CHAMBA | HIMACHAL PRADESH | L5 | Rejected-Finance hair bidder |
| Sl No | Description | Qty | Unit | ashok kumar verma L6 | Lalit Thakur L8 | MADHU SHARMA L4 | surinder thakur L2 | MANOHAR LAL VERMA L10 | SANJEEV SOOD L3 | BRIJ MOHAN SUMAN L1 | Kamlesh Kumar L5 | kirpa ram L9 | BALDEV THAKUR L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts as per the direction of Engineer-in-charge. | 29.82 | Cum | 350 ₹10,437 | 350 ₹10,437 | 300 ₹8,946 | 200 ₹5,964 Lowest | 500 ₹14,910 | 400 ₹11,928 | 250 ₹7,455 | 350 ₹10,437 | 310 ₹9,244.2 | 600 ₹17,892 |
| 2.00 | Excavation in earth work and disposal of all excavated earth up to a lead of 20 mtrs. | 3.02 | Cum | 550 ₹1,661 | 450 ₹1,359 | 460 ₹1,389.2 | 380 ₹1,147.6 | 300 ₹906 | 40 ₹120.8 | 10 ₹30.2 Lowest | 350 ₹1,057 | 505 ₹1,525.1 | 500 ₹1,510 |
| 3.00 | Providing and laying cement concrete 1:6:12 (1cement:6sand:12graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in :- a) Foundation and plinth. | 4.93 | Cum. | 3,500 ₹17,255 | 4,200 ₹20,706 | 4,800 ₹23,664 | 2,900 ₹14,297 | 6,500 ₹32,045 | 4,500 ₹22,185 | 4,200 ₹20,706 | 7,000 ₹34,510 | 1,800 ₹8,874 Lowest | 3,500 ₹17,255 |
| 4.00 | Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement: 6sand:12graded stone aggregate 20mm nominal size) in Cement Mortar.1:6. (1cement:6sand) in breast walls and retaining walls complete in all respect as per direction and entire satisfaction of Engineer in charge. | 9.9 | Cum. | 5,900 ₹58,410 | 5,500 ₹54,450 | 4,800 ₹47,520 | 6,200 ₹61,380 | 5,200 ₹51,480 | 6,200 ₹61,380 | 4,200 ₹41,580 Lowest | 7,500 ₹74,250 | 9,500 ₹94,050 | 5,000 ₹49,500 |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting, strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | |||||||||||||
| 5.01 | Vertical surfaces such as circular walls (any thickness), partitions and the like including attached pillasters,buttresses, plinth and string courses and the like. | 10.54 | Sqmtr. | 500 ₹5,270 | 250 ₹2,635 | 400 ₹4,216 | 200 ₹2,108 Lowest | 500 ₹5,270 | 292.42 ₹3,082.11 | 310 ₹3,267.4 | 350 ₹3,689 | 310 ₹3,267.4 | 300 ₹3,162 |
| 6.00 | Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone agg. 40mm nominal size) with 15% plum concrete and curing complete excluding cost of form work in retaining wall/ breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specifications within all leads and as per the direction of the Engineer-in-charge. | 11.86 | Cum | 6,100 ₹72,346 | 5,500 ₹65,230 | 5,200 ₹61,672 | 5,300 ₹62,858 | 6,000 ₹71,160 | 3,500 ₹41,510 Lowest | 5,000 ₹59,300 | 6,500 ₹77,090 | 6,500 ₹77,090 | 5,000 ₹59,300 |
| 7.00 | Providing and laying cement concrete work 1:2:4(1 cement: 2 sand: 4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work in all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge:- In foundation & plinth. | 2.27 | Cum | 6,200 ₹14,074 | 9,000 ₹20,430 | 7,200 ₹16,344 | 6,400 ₹14,528 | 9,000 ₹20,430 | 6,500 ₹14,755 | 5,200 ₹11,804 Lowest | 8,000 ₹18,160 | 6,900 ₹15,663 | 8,000 ₹18,160 |
| 8.00 | Steel work welded in built up,sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of red lead paint: i/c all leads & lifts complete in all respect : In beams , joists, channels, angles,tees , flats with connecting plates or angle cleats as in main and cross beams , hip & jack rafters , purlins connected to common rafters & the like. | 2.19 | Qtls. | 12,500 ₹27,375 | 10,000 ₹21,900 | 9,000 ₹19,710 | 9,200 ₹20,148 | 12,000 ₹26,280 | 9,000 ₹19,710 | 8,000 ₹17,520 Lowest | 9,800 ₹21,462 | 8,900 ₹19,491 | 9,000 ₹19,710 |
| 9.00 | Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt,dust and foreign matters.Enamel paint other than white. | 11.19 | Sqm. | 110 ₹1,230.9 | 45 ₹503.55 | 85 ₹951.15 | 69 ₹772.11 | 50 ₹559.5 | 90 ₹1,007.1 | 68 ₹760.92 | 70 ₹783.3 | 40 ₹447.6 Lowest | 70 ₹783.3 |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
28 Aug 2025, 11:00 amClosed
AGM WSD SJPNL
AGM WSD SJPNLUs Club Shimla 171001
Name of work A R M O to Sanjauli tank SH C O Breast wall for protection of Tank P F of fencing work and shifting pump house water tank at North Oak Sanjauli
2025_SJPNL_111905_1
2914 dated 08/08/2025
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹9,000
14 Oct 2025
8 Aug 2025
28 Aug 2025
8 Aug 2025
28 Aug 2025
8 Aug 2025
8 Aug 2025 - 28 Aug 2025
Amount
Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts as per the direction of Engineer-in-charge.
Excavation in earth work and disposal of all excavated earth up to a lead of 20 mtrs.
Providing and laying cement concrete 1:6:12 (1cement:6sand:12graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in :- a) Foundation and plinth.
Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement: 6sand:12graded stone aggregate 20mm nominal size) in Cement Mortar.1:6. (1cement:6sand) in breast walls and retaining walls complete in all respect as per direction and entire satisfaction of Engineer in charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting, strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 3 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in complete in all respect i/c all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
Vertical surfaces such as circular walls (any thickness), partitions and the like including attached pillasters,buttresses, plinth and string courses and the like.
Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone agg. 40mm nominal size) with 15% plum concrete and curing complete excluding cost of form work in retaining wall/ breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specifications within all leads and as per the direction of the Engineer-in-charge.
Providing and laying cement concrete work 1:2:4(1 cement: 2 sand: 4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work in all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge:- In foundation & plinth.
Steel work welded in built up,sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of red lead paint: i/c all leads & lifts complete in all respect : In beams , joists, channels, angles,tees , flats with connecting plates or angle cleats as in main and cross beams , hip & jack rafters , purlins connected to common rafters & the like.
Painting two coats (excluding priming coat) on new steel and other metal surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt,dust and foreign matters.Enamel paint other than white.
P/F GI chain link fabric of required width in mesh size 50x50 mm including stregthening with 2 mm dia wire or nuts & bolts and washers as required complete as per the direction of Engineer-in -charge . Made of GI wire dia 5 mm.
surinder thakur (BID ID -548148)
SANJEEV SOOD (BID ID -548405)
MADHU SHARMA (BID ID -547931)
Kamlesh Kumar (BID ID -547660)
ashok kumar verma (BID ID -547986)
BALDEV THAKUR (BID ID -548327)
Lalit Thakur (BID ID -548291)
kirpa ram (BID ID -546292)
MANOHAR LAL VERMA (BID ID -547723)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .