| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Fee/PreQual/Technical/Finance | -28.79% | ₹1.3 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.3 Cr+₹1.9 L (1.52%)Admitted-Fee/PreQual/Technical/Finance CHAKMUHA DHOGARIYA DUMKA | DUMKA | JHARKHAND | 814101 | -27.71% | ₹1.3 Cr+₹1.9 L (1.52%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.3 Cr+₹2.7 L (2.13%)Admitted-Fee/PreQual/Technical/Finance ADD ANNAPURNA KUNJ SHIVSUNDARI ROAD DIST DUMKA JHARKHAND | -27.27% | ₹1.3 Cr+₹2.7 L (2.13%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.3 Cr+₹4.1 L (3.22%)Admitted-Fee/PreQual/Technical/Finance DUMKA | DUMKA | DUMKA | JHARKHAND | -26.50% | ₹1.3 Cr+₹4.1 L (3.22%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.4 Cr+₹7.3 L (5.73%)Admitted-Fee/PreQual/Technical/Finance | -24.71% | ₹1.4 Cr+₹7.3 L (5.73%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
10 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
Ordinary Repair, Painting and Other Works of Different Bridges/Culverts under Road Section-1 Dumka under Non Plan Head for the year 2026-27
2026_CECOM_116343_1
RCD/DUMKA/1028
Open Tender
Civil Works
Percentage
180 days
DUMKA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹10,000
₹3.6 L
11 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
10 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing road land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.
By Manual means:-
In area of light jungle SOR - 2.03 (i) A | 1 | Hect. | 88,499.5 | ₹88,411 |
| 2 | Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lifts and lead upto 1000 m. SOR - 17.02 | - | M2 | 69.1 | - |
| 3 | Replacement of Damaged Concrete Railing. SOR - 17.18 | - | RM | 221.5 | - |
| 4 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. SOR - 14.07 | - | M | 3,149.19 | - |
| 5 | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. SOR - 5.02 (i) | - | M2 | 12.83 | - |
| 6 | Mastic Asphalt
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10sqm and at an approximate spacing of 10cm center to center in both directions, pressed into surface when the temperature of surfaces is not less tha 1000c, protruding 1mm to 4mm over mastic surface, all complete as per clause 516. SOR - 5.11 | - | M2 | 557.49 | - |
| 7 | Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. SOR - 14.16 | - | M2 | 80.4 | - |
| 8 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. SOR - DSR'23 14.72 | 2,784.7 | M2 | 276.03 | ₹7,68,660.74 |
| 9 | Anti Carbonation Protective Coating :-:- Apply Single Coat of Laprime coat followed by two coats of Lagreencoat AC on entire deck slab and Girder. (Silicone based with Anti Carbonation Property) SOR - NS | 1 | M2 | 400 | ₹399.6 |
| 10 | Replacement of expansion joints complete as per drawings SOR - 17.17 | - | M | 2,104.1 | - |
stage.html
html • 0.04 MB
finance_157244.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tenderdocument.pdf
Tender Documents • 3.42 MB
BOQ_157244.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .