Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Partly L1₹2.3 LAccepted-AOC D 281 MIDC RANJANGAON MIDC RANJANGAON TAL SRIRUR DIST PUNE PUNE412220 RANJANGAON SHIRUR PUNE MAHARASHTRA 412220 | PUNE | MAHARASHTRA | 412220 | Partly L1 | Accepted-AOC Partial L1 | |
| 2 | Partly L1₹3.1 LAccepted-AOC PLOT NO 2 AND 10 ROZ KA MEO INDUSTRIAL AREA MEWAT MEWAT GURGAON HARYANA 122103 | GURUGRAM | HARYANA | 122103 | Partly L1 | Accepted-AOC Partial L1 | |
| 3 | Partly L1₹20.1 LAccepted-AOC TC III BUILDING POST BAG 979 LNT VALVES MOUNT POONAMALLE ROAD MOUNT POONAMALLEE ROAD MANAPAKKAM KANCHIPURAM TAMIL NADU 600089 | KANCHIPURAM | TAMIL NADU | 600089 | Partly L1 | Accepted-AOC Partial L1 | |
| 4 | Partly L1₹26.9 LAccepted-AOC MELADOOR ANNAMANADA ANNAMANADA THRISSUR KERALA 680741 | THRISSUR | KERALA | 680741 | Partly L1 | Accepted-AOC Partial L1 | |
| 5 | Partly L1₹28.6 LAccepted-AOC | Partly L1 | Accepted-AOC Partial L1 |
Tender Value
Refer Docs
Closing Date
13 Dec 2021, 3:30 pmClosed
Mr. Rajesh Sangia
Toyo Technology Centre, 71, Kanjur Marg Village Road, Kanjurmarg (East), Mumbai-400 042
Supply of AXKE101-Control Valves, AXKE301-On Off Valves and AXKE501-Self Actuating Control Valves
2021_REFHQ_142270_1
IBCE-6373-C00-PJM-TEN-RFQ-0137
Limited
Instrumentation-Goods
Supply
240 days
Barauni Refinery, India
5 documents required · 5 mandatory
Exempted
9 Aug 2022
26 Oct 2021
14 Dec 2021
26 Oct 2021
13 Dec 2021
9 Nov 2021
Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation and Preparation for Shipment and Supervision of Erection & Commissioning of the AXKE101 - Control Valves as specified in the scope of supply list in Material Requisition along with all accessories, erection & commissioning spares, Special tools & tackles and Third party Inspection for BR9 Expansion Project for IOCL BARAUNI REFINERY as specified in Material Requisition.
Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation and Preparation for Shipment and Supervision of Erection & Commissioning of the AXKE301-On Off Valves as specified in the scope of supply list in Material Requisition along with all accessories, erection & commissioning spares, Special tools & tackles and Third party Inspection for BR9 Expansion Project for IOCL BARAUNI REFINERY as specified in Material Requisition.
Design, Manufacture, Assembly, Painting, Inspection, Testing, Tagging, Trial Shop Assembly, Documentation and Preparation for Shipment of the AXKE501-Self Actuating Control Valves as specified in the scope of supply list in Material Requisition along with all accessories, erection & commissioning spares, Special tools & tackles and Third party Inspection for BR9 Expansion Project for IOCL BARAUNI REFINERY as specified in Material Requisition.
Charges for Site Supervision of erection, testing and commissioning for AXKE101 - Control Valves / AXKE301-On Off Valves.
Per diem charges for upto 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site).
L AND T VALVES LIMITED
Microfinish Valves Pvt Ltd
KSB MIL Controls Limited
INSTRUMENTATION LIMITED
Severn Glocon Valves Private Limited
CONTINENTAL VALVES LIMITED
SAMSON CONTROLS PVT.LTD
EMERSON PROCESS MANAGEMENT CHENNAI PRIVATE LIMITED
KSB MIL Controls Limited
SAMSON CONTROLS PVT.LTD
INSTRUMENTATION LIMITED
EMERSON PROCESS MANAGEMENT CHENNAI PRIVATE LIMITED
Microfinish Valves Pvt Ltd
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .