| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.6 L+₹27,113.60 (1.48%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.7 L+₹36,728.08 (2.00%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
28 Jun 2021, 11:00 amClosed
E.E.
M.G.C.C.D-5 BIJNOR
Construction of D.R.B at km.8.180 of Dingarpur DY under M.G. Canal stage-II
2021_UPIDC_597367_1
04/EE/2020-21
Open Tender
Civil Works - Bridges
Item Wise
90 days
DISTT. MORADABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹40,000
30 Nov 2021
21 Jun 2021
28 Jun 2021
21 Jun 2021
28 Jun 2021
21 Jun 2021
Amount
Earth work in excavation of foundation in ordinary soil with 30m lead and1.5m lift with proper disposal and back filling i/c all labour , T&P etc. complete.
Providing centering and shuttering for CC i/c all cost of material, laobur etc. complete.
Supplying & Laying Cement concrete 1:3:6 (M-10)in foudation including cost of all material, labour T &P etc complete.
Ist Class (M-100) brick work in 1:4 cement & c.sand mortar including cost of all material ,labour and T&P etc. complete.
Ordinary centering and shuttering for R.C.C work i/c all cost of material, laobur etc. complete.
Laying R.C.C. (M-20) including all cost of material, labour T&P etc.complete.
Laying R.C.C. (M-25) for Wearing coat including all cost of material, labour T&P etc.complete.
Laying R.C.C. (M-15) for Bed Block Abutment & pier including all cost of material, labour T&P etc.complete.
Supply & placing steel Reinforcement i/c cost of all maerial , cutting ,Bending, Binding,welding etc all completion of work.
Cement Struck pointing in 1:2 C.M. including cost of all Material, Labour, T&P etc Complete. But excluding cost of Bricks.
12 mm thicks cement plaster in 1:3 with cement and coarse sand i/c all labour T&P etc. Complete
Supplying and Laying of two coat tarfelt painting as required including all cost of Labour and T&P, Material etc. complete required for proper complition of work. As directed by engineer in charge.
Supplying & laying 100 mm dia, G I spout pipe for Drainageas as per approved drawing Including all Cost of Materials & Labour ,T&P etc. all Completion of work /R.M
Supplying and Fixing Sign board (1.50X1.00M) i/c cost of all materials , labour, T&P etc. required for proper completion of work.
Earth work in filling including lead Upto 1.00 Km and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. as per direction of Engineer-in -Charge
Supplying and Laying R.B.M. Including all Cost of Materials & Labour ,T&P etc. all Completion of work /Cum
M/S SHREE GANESH CONSTRUCTION COMPANY
M/S VIPIN KUMAR CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .