Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹13.5 L+₹62,610 (4.85%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹13.7 L+₹77,030 (5.97%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹14.6 L+₹1.7 L (12.9%)Rejected-Finance | L4 | Rejected-Finance Due to L4 |
| Sl No | Description | Qty | Unit | Nepal Singh Contractor L4 | M/s Ajay Kumar Contractor L3 | aventerprises L2 | OM SAI CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation/ cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge | 310 | CUM | 44 ₹13,640 Lowest | 300 ₹93,000 | 80 ₹24,800 | 70 ₹21,700 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 24 | CUM | 5,200 ₹1,24,800 | 4,000 ₹96,000 Lowest | 5,240 ₹1,25,760 | 5,140 ₹1,23,360 |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 54 | CUM | 6,000 ₹3,24,000 | 5,000 ₹2,70,000 Lowest | 5,150 ₹2,78,100 | 5,050 ₹2,72,700 |
| 4.00 | Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 126 | CUM | 5,000 ₹6,30,000 | 5,000 ₹6,30,000 | 4,900 ₹6,17,400 | 4,800 ₹6,04,800 Lowest |
| 5.00 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 124 | RMT | 300 ₹37,200 | 250 ₹31,000 | 380 ₹47,120 | 190 ₹23,560 Lowest |
| 6.00 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 167 | RMT | 600 ₹1,00,200 | 250 ₹41,750 Lowest | 410 ₹68,470 | 380 ₹63,460 |
| 7.00 | Form work for Concrete Block I/C all type of material and Labour , T&P filter etc complete | 414 | SQM | 350 ₹1,44,900 | 250 ₹1,03,500 Lowest | 270 ₹1,11,780 | 250 ₹1,03,500 Lowest |
| 8.00 | Supplying and laying of reinforcement in position including cutting, bending and binding with all cost of labour and material etc. | 1.13 | MT | 72,000 ₹81,360 | 90,000 ₹1,01,700 | 70,000 ₹79,100 | 68,000 ₹76,840 Lowest |
Tender Value
₹15.2 L
EMD Value
₹31,000
Closing Date
18 Jul 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EE MGCCD 13 GARHMUKTESWAR HAPUR
CONSTRUCTION OF 30 OUTLETS OF SAMBHAL DY. FROM KM. 0.000 TO KM 6.730 AND KM. 18.400 TO KM. 25.200 UNDER PROJECT M. G. C. STAGE-II IN DIST - SAMBHAL LOT-01
2025_UPIDC_1053513_1
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
90 days
Shambal
4 documents required · 4 mandatory
₹854
Yes
₹31,000
Yes
7 Aug 2025
8 Jul 2025
18 Jul 2025
8 Jul 2025
18 Jul 2025
8 Jul 2025
Amount
Earthwork in excavation/ cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge
Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work.
Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work.
Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete
Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete
Form work for Concrete Block I/C all type of material and Labour , T&P filter etc complete
Supplying and laying of reinforcement in position including cutting, bending and binding with all cost of labour and material etc.
aventerprises (BID ID -5340055)
M/s Ajay Kumar Contractor (BID ID -5352935)
Nepal Singh Contractor (BID ID -5325123)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .