| 1 | L1₹1.3 CrAdmitted-Finance GODARA ESTATE KAIMRI ROAD 125001 | HISAR | HARYANA | 125001 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹2.8 L (2.06%)Admitted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹1.4 Cr+₹2.8 L (2.06%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S YASHPAL & CO. L1 | M/s Balaji Construction Company L2 |
|---|---|---|---|---|---|
| 1.00 | Lining with design mix concrete of grade M-15 with minimum cement content 240kg/ cum,75mm thick in curve portion and side slope manually including rendering with cement sand (1:3) slurry, form work, dressing and preparation of sub grade HSR Item No. 14.10 (As per analysis of rate) | 7,879.28 | sqm | 500 ₹39,39,640 Lowest | 530 ₹41,76,018.4 |
| 2.00 | Providing and laying in position ready mixed plaincement concrete M-15, with cement content as per approved design mix andmanufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuousagitated mixer, manufactured as per mix design of specifiedgrade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excludingthe cost of centering, shuttering and finishing, including cost ofcuring, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workabilitywithout impairing strength and durability as per direction of theEngineer-in- charge.(Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix for sleepers). M-15 grade plain cement concrete(cement content
considered @ 240kg/cum) as per HSR item No. 6.22.2.2 | 257.29 | Cum | 4,500 ₹11,57,805 Lowest | 4,700 ₹12,09,263 |
| 3.00 | Brick work in 1:4 ( 1 cement 4 course sand) mortar with common burnt clay non-modular bricks of class
designation 7.5 in foundation and plinth complete as per HSR. 7.21.1) | 74.3 | Cum | 4,500 ₹3,34,350 | 4,300 ₹3,19,490 Lowest |
| 4.00 | E/Work excavation in foundation of structure as per drawing and technical specifications i/c setting out,
construction of shoring & bracing, removal of stumps and other deterious matter, dressing of sides & bottom and back filling with approved materials as per clause 304 of MORT & H specifications by manual means in ordinary soil up to 3.0 m depth complete with all leads as per HSR 4.12 | 16,638.6 | Cum | 90 ₹14,97,474 | 80 ₹13,31,088 Lowest |
| 5.00 | Providing & laying in position Cement concrete 1:4:8 with 8 graded stone aggregate of 40 mm size in foundation and plinth excluding centering & shuttering complete in all respect as per HSR 6.1. | 54.85 | Cum | 3,000 ₹1,64,550 Lowest | 3,500 ₹1,91,975 |
| 6.00 | Filling expansion joints, with special impervious hot pour, 12.5 mm wide as per (HSR item No. 6.58) | 12,099 | mtr./cm/ depth | 5 ₹60,495 Lowest | 5.5 ₹66,544.5 |
| 7.00 | Steel reinforcement of thermo mechanically threaded bars of graded Fee-500D for RCC work , where not included in the complete rate of RCC i/c straightening, cutting bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wires etc. complete in all respect above plinth level as per (HSR 6.33.6) | 298.52 | qtl. | 8,500 ₹25,37,420 Lowest | 9,500 ₹28,35,940 |
| 8.00 | Brick work in 1:3 ( 1cement 3 course sand) mortar with common burnt clay non-modular bricks of class
designation 7.5 in foundation and plinth complete as per Derived rate | 91.85 | Cum | 4,500 ₹4,13,325 Lowest | 4,650 ₹4,27,102.5 |
| 9.00 | Supply and Lowering plain and reinforced concrete pipes and specials of 300 mm dia NP-2 into trenches for all depths and laying out the same to correct alignment gradients levels etc., including all dressing and trimming and cutting of concrete beds and joint holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching haunches and envelope are completed. The pipes shall rest on the beds at all points throughout their lengths and to ensure this they shall be grouted in where necessary as described in item No. 21.38 including carriage from the stores of the Engineer-in-charge and safe delivery thereof at site of works. This includes, loading, unloading, stacking at convenient points adjacent to the works ready for lowering as may be found most convenient in the interest of work.(HSR 21.44.6 + Unique code 1210) | 30 | mtr. | 450 ₹13,500 Lowest | 500 ₹15,000 |
| 10.00 | Centering and shuttering i/c strutting, proping and removal of form work for roof, landing etc, complete as
per HSR 6.30.3 | 92.58 | sqm | 230 ₹21,293.4 | 200 ₹18,516 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
11 Aug 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer M/Garh Canal W/S Division Ch.Dadri
Rehabilitation of Salhawas Minor from K.M. 0.000 to 3.000 (Tail)
2022_HRY_233295_1
2222-41/32-A dated 04.08.2022
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Charkhi Dadri
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.1 L
Yes
23 Aug 2022
5 Aug 2022
12 Aug 2022
5 Aug 2022
11 Aug 2022
5 Aug 2022
Amount
Lining with design mix concrete of grade M-15 with minimum cement content 240kg/ cum,75mm thick in curve portion and side slope manually including rendering with cement sand (1:3) slurry, form work, dressing and preparation of sub grade HSR Item No. 14.10 (As per analysis of rate)
Providing and laying in position ready mixed plaincement concrete M-15, with cement content as per approved design mix andmanufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuousagitated mixer, manufactured as per mix design of specifiedgrade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excludingthe cost of centering, shuttering and finishing, including cost ofcuring, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workabilitywithout impairing strength and durability as per direction of theEngineer-in- charge.(Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix for sleepers). M-15 grade plain cement concrete(cement content considered @ 240kg/cum) as per HSR item No. 6.22.2.2
Brick work in 1:4 ( 1 cement 4 course sand) mortar with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth complete as per HSR. 7.21.1)
E/Work excavation in foundation of structure as per drawing and technical specifications i/c setting out, construction of shoring & bracing, removal of stumps and other deterious matter, dressing of sides & bottom and back filling with approved materials as per clause 304 of MORT & H specifications by manual means in ordinary soil up to 3.0 m depth complete with all leads as per HSR 4.12
Providing & laying in position Cement concrete 1:4:8 with 8 graded stone aggregate of 40 mm size in foundation and plinth excluding centering & shuttering complete in all respect as per HSR 6.1.
Filling expansion joints, with special impervious hot pour, 12.5 mm wide as per (HSR item No. 6.58)
Steel reinforcement of thermo mechanically threaded bars of graded Fee-500D for RCC work , where not included in the complete rate of RCC i/c straightening, cutting bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wires etc. complete in all respect above plinth level as per (HSR 6.33.6)
Brick work in 1:3 ( 1cement 3 course sand) mortar with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth complete as per Derived rate
Supply and Lowering plain and reinforced concrete pipes and specials of 300 mm dia NP-2 into trenches for all depths and laying out the same to correct alignment gradients levels etc., including all dressing and trimming and cutting of concrete beds and joint holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching haunches and envelope are completed. The pipes shall rest on the beds at all points throughout their lengths and to ensure this they shall be grouted in where necessary as described in item No. 21.38 including carriage from the stores of the Engineer-in-charge and safe delivery thereof at site of works. This includes, loading, unloading, stacking at convenient points adjacent to the works ready for lowering as may be found most convenient in the interest of work.(HSR 21.44.6 + Unique code 1210)
Centering and shuttering i/c strutting, proping and removal of form work for roof, landing etc, complete as per HSR 6.30.3
Dismantling of pucca road i/c soling, wearing coat, screening and sorting & stacking of all serviceable materials with in 100 mtr distance complete as per (HSR 24.37)
Restoration of pucca road cut in level in the existing road surface i/c preparation of sub grade, laying and relaying of soling, laying and consolidation of wearing coat to water bound macadam specifications , laying 20 mm thick premix carpet on top i/c cost of track and seal cost with supply and carriage of all required materials complete in all respect as per HSR 24.38
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. All works above plinth level up to floor IV level as per HSR item No. 6.25.1
Centering and shuttering i/c strutting, propping and removal of form work for foundation, footing and bases of columns etc, complete as per HSR 6.29.1
Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks complete as per (HSR 10.34)
Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead Complete as per (HSR 5.6)
Centering and shuttering including strutting, propping etc. And removal of form work for Retaining walls, return walls, i/c attached pilasters, buttresses, plinth and string courses, fillet kerbs and steps etc as per (HSR No.6.29.2)
Dismantling of brick masonry laid in cement sand mortar manually/by mechanical means i/c stacking serviceable materials and disposal of unserviceable material with in 50 mtr lead or as per direction of enginner incharge complete as per (HSR 5.7.4)
Providing lowering cutting jointing and testing 600 mm dia mtr RCC pipe class NP 3 as per 18-458-2003 with spigot & socketed joints manufactured with ISi marked sulphate resistance cement as per ISi 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1: 3/2 cement sand mortar and with end dowels filled with 1:3/2. cement sand mortar and finishing the joints at anangle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No . 21.38, item 21.44, item 21.45, & item 21.46 including cartage loading and unloading complete in all respects. The internal diametric of the sewer being: (HSR 21.95.5)
Removing hume pipes-NP 2/NP 3/NP 4 including mtr excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge up to 600 mm dia as per (HSR item No. 5.53.1)
Demolishing cement concrete 1:2:4 or leaner (i/c Cum equalent design mix)manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. complete as per (HSR-5.23.2)
Washing surface scrubing with brushes (HSR 1986)
Credit of old brick work masonry
credit of old 600mm dia RCC pipe NP-3
M/s Balaji Construction Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
1Salhawasminor.pdf
Additional Documents • 0.96 MB
BOQ_304021.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .