Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.2 LAdmitted-Finance AT BADALA PANCHBATIA PO BADALASASAN PS BALIPATNA DIST KHORDHA PIN 752106 | PURI | ODISHA | 752106 | -22.43% | ₹63.2 L | L1 | Admitted-Finance |
| 2 | L2₹81.5 L+₹18.3 L (28.9%)Admitted-Finance A T BARIMULA P O VILLIGRAM PS NIMAPARA DIST PURI ODISHA | NIMAPARA | PURI | ODISHA | +0.00% | ₹81.5 L+₹18.3 L (28.9%) | L2 | Admitted-Finance |
| 3 | L2₹81.5 L+₹18.3 L (28.9%)Admitted-Finance AT PATNASAHI PO GOLABAI SASAN PS JANKIA DIST KHORDHA | JANKIA | KHORDHA | ODISHA | +0.00% | ₹81.5 L+₹18.3 L (28.9%) | L2 | Admitted-Finance |
| 4 | L2₹81.5 L+₹18.3 L (28.9%)Admitted-Finance | +0.00% | ₹81.5 L+₹18.3 L (28.9%) | L2 | Admitted-Finance |
| 5 | L2₹81.5 L+₹18.3 L (28.9%)Admitted-Finance | +0.00% | ₹81.5 L+₹18.3 L (28.9%) | L2 | Admitted-Finance |
Tender Value
₹81.5 L
EMD Value
₹81,500
Closing Date
4 Aug 2026, 5:00 pmClosed
Executive Engineer
O/o the E.E, Drainage Division, Khordha
Renovation of Link Drains
2026_CEDC_136412_3
e-Procurement Notice No.02 (DD-KHR) OF 2026-27
National Competitive Bid
Civil Works - Others
Percentage
270 days
Balianta Block of Khurda District
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹81,500
Yes
21 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
20 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of structural foundation by mechanical means in all kinds of soil including stony earth gravel, moorum etc. inter spared with boulders up to 0.50 cum size with all lifts, delfts including trimming of slopes and bed to design section and depositing the excavated materials away on both sides of the drain including spreading and leveling the earth in layers not exceeding 22.5 cm including hire and running charges of all the macheniries, T&p, taxes, cess etc as per direction of Engineer in charge.(within 8m bed width) | 1,02,958.63 | Cum | 35.6 | ₹36,65,327.23 |
| 2 | Excavation for foundation of structures, loading, unloading and carriage by mechanical means in all kinds of soil including stoney earth, gravel, moorum etc. interspread with bouldres upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from worksite within initial lead of 50mtr as per the, specification and direction of the Engineer-in-charge. | 1,369 | Cum | 42.7 | ₹58,456.3 |
| 3 | Filling foundation and plinth with sand watered and rammed in proper way including all cost, conveyance royalty labour charges of materials and T & P required for materials etc. complete as per direction of Engineer-in-charge. | 30.6 | Cum | 620 | ₹18,972 |
| 4 | Cement concrete M15 (1:2:4) grade with 40mm & down graded hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries, T&P required for the work site proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 441.15 | Cum | 6,078 | ₹26,81,309.7 |
| 5 | Providing form work for concrete in canal/drain structure with F-1 finish using steel shutter plates of approved specification for surfaces not prominently or permanently exposed to public view including supply of all materials, T & P, labour and transportation of shuttering materials and dismantling and finishing complete as per direction of Engineer in charge. | 1,092.4 | Sqm | 921 | ₹10,06,100.4 |
| 6 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing including cost, conveyance, royalty, loading and unloading of all materials & cess etc complete as per direction of the Engineer-in-charge.. | 44 | Rmtr | 112 | ₹4,928 |
| 7 | Filling foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge. | 456.47 | Cum | 23.7 | ₹10,818.34 |
| 8 | Supplying and spreading sand of approved specification on compacted surfaces of earth dam or dykes for filter blanket and other horizontal filter zone to proper thickness including surface dressing within initial lead including all cost, conveyance royalty labour charges of materials and T & P required for materials etc. complete as per direction of Engineer-in-charge. | 45 | Cum | 1,698.3 | ₹76,423.5 |
| 9 | Supplying and spreading 20mm down graded chips satisfying filter criteria in horizontal filter criteria in horizontal filter zones and filter blankets to proper thickness including surface dressing within an initial lead including all cost, conveyance royalty labour charges of materials and T & P required for materials etc. complete as per direction of Engineer-in-charge. | 22.5 | Cum | 3,269.1 | ₹73,554.75 |
| 10 | Random rubble stone masonry in c.m (1:6) in foundation and plinth including all cost, conveyance royalty labour charges of materials and T & P and cess etc. complete as per direction of Engineer-in-charge. | 19.53 | Cum | 5,471.02 | ₹1,06,849.02 |
stage.html
html • 0.17 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
BOQ_602310.xls
BOQ • 0.24 MB
DTCN_04PRACHI.pdf
Tender Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .