| 1.0025 KVA Distribution Transformer (Aluminium Wound) | ||||||
| 1.01 | Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site. | 1 | job | 0 ₹100 | 0 ₹30 Lowest | 0 ₹199 |
| 1.02 | Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage. | 1 | job | 0 ₹300 | 0 ₹30 Lowest | 0 ₹250 |
| 1.03 | Labour Charges for cleaning of transformer tank, radiators top covers etc. | 1 | job | 0 ₹100 | 0 ₹30 Lowest | 0 ₹150 |
| 1.04 | Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any | 1 | job | 0 ₹100 | 0 ₹2 Lowest | 0 ₹199 |
| 1.05 | Re-Winding of LV Coil (Aluminium). | 1 | kg | 0 ₹90 | 0 ₹120 | 0 ₹49 Lowest |
| 1.06 | Winding of LV Leg Coil (Aluminium). | 1 | kg | 0 ₹140 | 0 ₹30 Lowest | 0 ₹49 |
| 1.07 | Winding of HV Leg Coil (Aluminium). | 1 | kg | 0 ₹140 | 0 ₹120 | 0 ₹49 Lowest |
| 1.08 | Rewinding of HV leg Coil (Aluminium) | 1 | kg | 0 ₹60 | 0 ₹120 | 0 ₹49 Lowest |
| 1.09 | Refitting/ Replacement of Bushing only HV/LV | 1 | No. | 0 ₹60 | 0 ₹30 Lowest | 0 ₹56 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 Aug 2025, 2:00 pmClosed
Executive Engineer, ED JPDCL Batote
O o Executive Engineer, ED JPDCL Batote
Fixation of Rates for On-Site and Workshop-Based in Batote and Banihal repair of Damaged Distribution Transformers of Various Capacities Installed across the Jurisdiction of Electric Division, JPDCL Batote for the year 2025-26
2025_PDD_282472_2
ENIT 16 of 2025-26
Open Tender
Repair and Maintenance Works
Turn-key
3 days
Batote Ramban Banihal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
Yes
Executive Engineer, ED JPDCL Batote
₹1 L
Yes
27 Aug 2025
11 Aug 2025
19 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
25 KVA Distribution Transformer (Aluminium Wound)
Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site.
Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage.
Labour Charges for cleaning of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Re-Winding of LV Coil (Aluminium).
Winding of LV Leg Coil (Aluminium).
Winding of HV Leg Coil (Aluminium).
Rewinding of HV leg Coil (Aluminium)
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour charges for filtration of fresh/old transformer oil
Heat Treatment of Transformer HV/LV Coils
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer .
Labour Charges for testing of transformer
Labour Charges for Loading of transformer
Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc.
Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site.
Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc
50/63 KVA Distribution Transformer (Aluminium Wound)
Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site.
Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage.
Labour Charges for cleaning of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Re-Winding of LV Coil (Aluminium).
Winding of LV Leg Coil (Aluminium).
Winding of HV Leg Coil (Aluminium).
Rewinding of HV leg Coil (Aluminium)
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour charges for filtration of fresh/old transformer oil
Heat Treatment of Transformer HV/LV Coils
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer .
Labour Charges for testing of transformer
Labour Charges for Loading of transformer
Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc.
Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site.
Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc
100 KVA Distribution Transformer (Aluminium Wound)
Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site.
Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage.
Labour Charges for cleaning of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Re-Winding of LV Coil (Aluminium).
Winding of LV Leg Coil (Aluminium).
Winding of HV Leg Coil (Aluminium).
Rewinding of HV leg Coil (Aluminium)
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour charges for filtration of fresh/old transformer oil
Heat Treatment of Transformer HV/LV Coils
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer .
Labour Charges for testing of transformer
Labour Charges for Loading of transformer
Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc.
Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site.
Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc
200/250 KVA Distribution Transformer (Aluminium Wound/Copper Wound)
Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site.
Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage.
Labour Charges for cleaning of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Re-Winding of LV Coil (Aluminium/Copper).
Winding of LV Leg Coil (Aluminium/copper).
Winding of HV Leg Coil (Aluminium/copper).
Rewinding of HV leg Coil (Aluminium/Copper)
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour charges for filtration of fresh/old transformer oil
Heat Treatment of Transformer HV/LV Coils
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer .
Labour Charges for testing of transformer
Labour Charges for Loading of transformer
Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc.
Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site.
Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc
400 KVA Distribution Transformer (Copper Wound)
Labour Charges of unloading of damaged transformers at Workshop & dragging upto stacking site.
Labour Charges for dragging of damaged transformers from stacing site to work site for detanking/ de-assembling to acertain the extent of damage.
Labour Charges for cleaning of transformer tank, radiators top covers etc.
Labour Charges for repairing, welding of transformer tank, radiators, Arresting of Oil Leakages etc., if any
Re-Winding of LV Coil (Aluminium/Copper).
Winding of LV Leg Coil (Aluminium/copper).
Winding of HV Leg Coil (Aluminium/copper).
Rewinding of HV leg Coil (Aluminium/Copper)
Refitting/ Replacement of Bushing only HV/LV
Refitting/ Replacement of Bush rod only HV/LV
Labour charges for filtration of fresh/old transformer oil
Heat Treatment of Transformer HV/LV Coils
Labour Charges for Re-assembling, refitting of coils, including all sundry items to be replaced & re-tanking up of assembled core and refitting of transformer .
Labour Charges for testing of transformer
Labour Charges for Loading of transformer
Labour Charges for weighing, stacking & loading of aluminium/copper scrap etc.
Labour charges for dragging of repaired transformer from work site to heat treatment site, heat treatement site to oil filling site, oil filling site to testing site, testing site to stacking site/loading site.
Labour Charges for cleaning of workplace, machinery, cleaning of oil filling area, oil sump etc
Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 25 KVA DTR at site.
Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers
Dismantling and re-fixing of LV cable circuit of transformer
Dismounting of defective transformer from bed
Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs
Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core
Topping with transformer oil after Filtration/ Reconditioning
Reconditioning of HV coil (aluminium)
Reconditioning of LV coil (aluminium)
Winding of HV coil (Aluminium)
Winding of LV coil (Aluminium)
Replacement of HT/LT Bushing
Replacement of HT/LT Bush Rod
Mounting of repaired transformer on bed
Transportation of material from Divisional workshop Batote to the respective site for first 10 kms
Transportation of material for every additional 10 km
Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 50/63 KVA DTR at site.
Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers
Dismantling and re-fixing of LV cable circuit of transformer
Dismounting of defective transformer from bed
Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs
Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core
Topping with transformer oil after Filtration/ Reconditioning
Reconditioning of HV coil (aluminium)
Reconditioning of LV coil (aluminium)
Winding of HV coil (Aluminium)
Winding of LV coil (Aluminium)
Replacement of HT/LT Bushing
Replacement of HT/LT Bush Rod
Mounting of repaired transformer on bed
Transportation of material from Divisional workshop Batote to the respective site for first 10 kms
Transportation of material for every additional 10 km
Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 100 KVA DTR at site.
Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers
Dismantling and re-fixing of LV cable circuit of transformer
Dismounting of defective transformer from bed
Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs
Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core
Topping with transformer oil after Filtration/ Reconditioning
Reconditioning of HV coil (aluminium)
Reconditioning of LV coil (aluminium)
Winding of HV coil (Aluminium)
Winding of LV coil (Aluminium)
Replacement of HT/LT Bushing
Replacement of HT/LT Bush Rod
Mounting of repaired transformer on bed
Transportation of material from Divisional workshop Batote to the respective site for first 10 kms
Transportation of material for every additional 10 km
Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 200/250 KVA DTR at site.
Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers
Dismantling and re-fixing of LV cable circuit of transformer
Dismounting of defective transformer from bed
Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs
Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core
Topping with transformer oil after Filtration/ Reconditioning
Reconditioning of HV coil (aluminium)
Reconditioning of LV coil (aluminium)
Winding of HV coil (Aluminium)
Winding of LV coil (Aluminium)
Replacement of HT/LT Bushing
Replacement of HT/LT Bush Rod
Mounting of repaired transformer on bed
Transportation of material from Divisional workshop Batote to the respective site for first 10 kms
Transportation of material for every additional 10 km
Repair/Reclamation of Damaged Distribution Transformers (11KV/0.44KV) 400/500/630 KVA DTR at site if required.
Dismantling & re-fixing of 11 KV Jumper set/ Link set/ G.O set of defective transformers
Dismantling and re-fixing of LV cable circuit of transformer
Dismounting of defective transformer from bed
Dragging of defective transformer from sub-station site to repairing site and back for an average distance of 50 mtrs
Opening/ De-tanking of transformer for assessment of damages, re-assembling, re-fitting of coils & core including replacement of all damaged sundry items and re-tanking of assembled core
Topping with transformer oil after Filtration/ Reconditioning
Reconditioning of HV coil (aluminium)
Reconditioning of LV coil (aluminium)
Winding of HV coil (Aluminium)
Winding of LV coil (Aluminium)
Replacing of HT/LT damaged Copper Strip with new copper strip
Replacement of HT/LT Bushing
Replacement of HT/LT Bush Rod
Mounting of repaired transformer on bed
Transportation of material from Divisional workshop Batote to the respective site for first 10 kms
Transportation of material for every additional 10 km
M/S CLEAR LINE ENGINEERS CONTRACTOR (BID ID -2445027)
RATHER ELECTRICALS AND CONTRACTOR (BID ID -2444562)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .