CHIEF ENGINEER
POLICE HEAD QUARTERS DGP OFFICE SAIFABAD
CONSTRUCTION OF NEW FIRE STATION BUILDING AT KHANAPUR OF NIRMAL DISTRICT
704285
T10/2026-27
OPEN
Civil Engineering Works
NIRMAL
15 documents required · 15 mandatory
₹4,672
₹1.3 L
27 May 2026
27 May 2026
27 May 2026
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & TAXES, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATION BED AND UNDER STONE SLAB FLOORING. (APSS NO: 402).
FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST, COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., CPOMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS FOR SUPERSTRUCTURE WALLS OF 225MM THICK FOR BASEMENT
CEMENT CONCRETE (1:3:6) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS GROUND FLOOR. (APSS NO: 402).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FOOTINGS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK FOR PEDESTALS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WOR FOR FINISHED ITEM OF WORK FOR PLINTH BEAMS (APSS NO.403)
VRCC M - 25 DESIGN MIX (CEMENT:FINE AGGREGATE: COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, CURING ETC.,COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK, BUT EXCLUDING CENTERING, SHUTTERING. WITH STEEL PLATES, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GRADE WALL 230 mm THICK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS GROUND FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT from 3.66 m to 6.60M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS GROUND FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS FIRST FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS SECOND FLOOR (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR BEAMS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 6.60M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR BEAMS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FIRST FLOOR BEAMS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SECOND FLOOR BEAMS (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 150 MM THCIK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FIRST FLOOR SLABS 150 MM THCIK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR SECOND FLOOR SLABS 150 MM THCIK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 175 MM THCIK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 6.60M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 175 MM THCIK (APSS NO.403)
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC.,FOR UNSUPPORTED HIEGHT upto 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC.,FOR UNSUPPORTED HIEGHT upto 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR LINTELS
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC.,FOR UNSUPPORTED HIEGHT upto 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR SECOND FLOOR LINTELS
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC.,FOR UNSUPPORTED HIEGHT upto 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LOFTS 50 MM THICK
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING STEEL SCAFFOLDING PIPES, JACK PROPS, STEEL CENTERING PLATES,ETC.,FOR UNSUPPORTED HIEGHT upto 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR LOFTS 50 MM THICK
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR RACKS 25MM THICK
RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FIRST FLOOR RACKS 25MM THICK
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK FIRST FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK SECOND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)
MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK GROUND FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504).
MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK FIRST FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504).
MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK SECOND FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504).
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. FIRST FLOOR (APSS NO: 901&904)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. SECOND FLOOR (APSS NO: 901&904)
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904)FIRST FLOOR
ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) SECOND FLOOR.
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS .GROUND FLOOR (APSS.NO: 901&903)
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS .FIRST FLOOR (APSS.NO: 901&903)
PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN GROUND FLOOR (APSS NO: 402).
PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN FIRST FLOOR (APSS NO: 402).
PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN SECONDFLOOR (APSS NO: 402).
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO: 402).
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO: 402).
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO: 402).
PLAIN CEMENT CONCRETE (1:4:8) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. DUMMY COLUMNS IN SECOND FLOOR (APSS NO: 402).
FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR.
FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR.
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR.
FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR COLOUR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, , LABOUR CHARGES FOR DRESSING OF TILES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR
FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR COLOUR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, , LABOUR CHARGES FOR DRESSING OF TILES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR.
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK AND REGULAR COLOURS LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR
PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT / RISERS OF STEPS HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK AND REGULAR COLOURS LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR FIRST FLOOR.
FLOORING WITH NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MMSET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR
FLOORING WITH NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MMSET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR.
PROVIDING DODOOING TO INTERNAL WALLS WITH GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:15622 - 2017, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS I ST QUALITY, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR GROUND FLOOR.
PROVIDING DODOOING TO INTERNAL WALLS WITH GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:15622 - 2017, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS I ST QUALITY, SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR FIRST FLOOR.
HALF ROUNDING THE EDGES OF GRANITE/MARBLE STONE OF ALL THICKNESS INCLUDING POLISHING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
PROVIDING GROVES 2-3 MM THICK TO GRANITE/MARBLE STONE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. IN GROUND FLOOR
PROVIDING "HYSD" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS-
PAINTING TO NEW WALLS WITH THREE (3) COATS OF PLASTIC EMULSION PAINT OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,COMPLETE FOR FINISHED ITEM OF WORK
PAINTING WITH semi glossy acrylic emulsion paint exterior premium grade with silicon additives having VOC content less than 50gm/lit OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO:908).
DOOR: 0.75X2.1 SUPPLY AND FIXING OF WPC SINGLE SHUTTER OF 30MM THICK FOR EXISTING DOOR FRAME OF WPC OF SIZE 100MM X 65 MM, INCLUDING 8NOS. OF 125 MM BUTT HINGES, 2 NO. DOOR STOPER, 4 NOS. 150 MM LONG DOOR HANDLES, 2NOS ALDROP OF SIZE 300 MM LONG, 3NOS. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
Providing and fixing factory-made solid Wood Polymer Composite (WPC) single xtruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.
INTERNAL DOOR SINGLE SHUTTER:DOOR: 1.00X2.1 SUPPLY AND FIXING OF WPC DOOR SHUTTER OF 30MM THICK FOR EXISTING DOOR FRAME OF WPC OF SIZE 100MM X 65 MM, INCLUDING 4NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 150 MM LONG DOOR HANDLES, 2NOS ALDROP OF SIZE 300 MM LONG, 1NOS. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
INTERNAL DOOR (SINGLE SHUTTER): 0.90 X 2.10 M: SUPPLYING POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE FLUSH DOOR SHUTTER OF 35 MM THICK , SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING DOOR FRAME MADE WITH TEAK WOOD SCANTLINGS OF SIZE 125 MM X75 MM, INCLUDING 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 230X40X3 MM, 3 NOS. OF 125 MM LONG BUTT HINGES, 1 NOS. DOOR STOPPER, 1 NO RUBBER BUSH, 2 NOS. 125 MM LONG DOOR HANDLES, 2 NOS. ALDROP OF SIZE 300 MM LONG, 1 NO. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES LABOUR CHARGES FOR MAKING THE FRAME AND FIXING OF FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
INTERNAL DOOR (SINGLE SHUTTER): 1.00 X 2.10 M: SUPPLYING POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE FLUSH DOOR SHUTTER OF 35 MM THICK , SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING DOOR FRAME MADE WITH TEAK WOOD SCANTLINGS OF SIZE 125 MM X75 MM, INCLUDING 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 230X40X3 MM, 3 NOS. OF 125 MM LONG BUTT HINGES, 1 NOS. DOOR STOPPER, 1 NO RUBBER BUSH, 2 NOS. 125 MM LONG DOOR HANDLES, 2 NOS. ALDROP OF SIZE 300 MM LONG, 1 NO. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES LABOUR CHARGES FOR MAKING THE FRAME AND FIXING OF FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
SUPPLYING AND FIXING OF UNPLASTICIZED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER PROVISION – (ONLY 2-GLASS SHUTTERS) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF (80 MM X 52 MM)/ (94 MM X 45 MM) X 2.20 MM FOR OUTER FRAMES, (54 MM X 38 )/(39 MM X 58 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM, STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES,LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK
PROVIDING, SUPPLYING & FIXING OF TOP HUNG VENTILATOR WITH EXHAUST FAN PROVISION MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH TPV GASKET FOR SASH & GLAZING BEAD SHALL BE COEXTRUDED WITH GREY COLOUR SOFT PVC AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTER FRAME HAVING A OVERALL SIZE OF 60MM X 55 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS, MULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS AND SASH WITH OVERALL SIZE OF 75 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1.0/1.2 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).GLAZING BEAD FOR FIXING OF GLASS SHALL BE OF SIZE 34 X 20 MM COEXTRUDED WITH SOFT PVC GASKET. VENTILATOR
SUPPLYING AND FIXING OF UNPLASTICIZED POLY VINYL CHLORIDE (UPVC) FIXED GLAZING - 48 SERIES DULY MANUFACTURED USING UPVC REINFORCED PROFILES OF 60 MM X 48 MM X 2.25 MM FOR OUTER FRAMES AND THE MULLION SECTIONS ARE OF 60 MM X 76 MM X2.25 MM FRAMES ARE STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.2 MM THE SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH EPDM WEATHERING SEAL RESISTANT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE WITH TEMPLATES FOR CASEMENT SIZING COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.S.FLATS OF ALL SIZES
SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.S. SQUARE BARS OF ALL SIZES
PAINTING TO NEW IRON WORK WITH ONE COAT OF RED OXIDE PRIMER COAT AND TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES TWO COATS OF PAINT AND ONE COAT PRIMER) BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOOR. (APSS NO.1201, 1207, 1212)
PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING GST., (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING MS structural steel works like heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, for erecting & fixing all structural steel works like heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position etc complete for ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.STUBES OF ALL SIZES
MOBILISATION OF MEN AND MATERIALS TO THE SITE, SHIFTING FROM ONE LOCATION TO THE OTHER, OUR STAFF TA& DA, THEIR STAY AND BACK ON COMPLETION OF WORK ETC.., DRILLING BOREHOLES UP TO MAXIMUM DEPTH OF 5.0M (OR) REFUSAL STRATA WHICHEVER IS MET EARLIER, WITH HAND OPERATED SHELL AND AUGER TECHNIQUE, COLLECTION OF DISTRUBED AND UNDISTRUBED SAMPLES AT REGULAR INTERVALS, (INCASE, REFUSAL STRATA MET AT SHALLOW DEPTHS, OPEN PITS WILL BE EXCAVATED FOR SAMPLING PURPOSE). CONDUCTING THE FOLLOWING LABORATORY TESTS ON SOIL SAMPLES COLLECTED AT THE SITE. (A) GRAIN SIZE ANALYSIS (B) ATTERBERG LIMITS (C) NATURAL DENSITY (D) WATER CONTENT (E) SPECIFIC GRAVITY (F) TRIAXIAL SHEAR/U.C.C TESTS (G) FREE SWELL INDEX TESTS ALSO SUBMISSION OF GEO TECHNICAL REPORT IN TRIPICATE WITH FIELD AND LAB, TEST RESULTS, PRELIMINARY RECOMMENDATIONS REGARDING TYPE, DEPTH OF FOUNDATION AND ALLOWABLE BEARING PRESSURE ON SOIL, PRECAUTION TO BE TAKEN IF ANY.Would you like me to format
SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 34.90 MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING IN POSITION EUROPEAN TYPE WATER CLOSET OF BEST INDIAN MAKE WHITE GLAZED WITH 100 MM 'P' TRAP, PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSET AND BUFFERS AS PER IS 2548-1963 AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.
SUPPLYING AND FIXING INDIAN MAKE FLAT BACK WHITE GLAZED WASH HAND BASIN (HSW/PARRYWARE/NEYCER) IST QUALITY CONFIRMING TO IS: 2556-PART-4 :1972 OF SIZE 550 X 400MM SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFIRMING TO IS : 2963-1979 AND FITTED WITH 15MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 300GRAMS SEICO/ESSO OR EQUIVALENT COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING GM GATE (PEET) VALVES - 25 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING GM GATE (PEET) VALVES - 20 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING 15MM CP LONG BODY BIB COCK - 400 GRAMS QTR TURN AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING TOWEL ROD (CP) OF 24" LONG AND 3/4" DIA WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK
SUPPLYING AND LAYING 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND LAYING 75 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
S&F OF CHROMIUM PLATED FINISH BRASS BODY QUARTER TURN BIBCOCK CUM HEALTH FAUCET WITH 1M LONG TUBEAND WALL HOOK WITH 10 YEARSWARRANTY ,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST ., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 15MM ANGLE STOP COCK - 400 GRAMS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
S&F OF 15 MM PREMIUM VARIETY CHROMIUM PLATED FINISH BRASS BODY WALL MIXER WITH HAND SHOWER WITH A PROVISION FOR OVER HEAD SHOWER WITH 115 MM LONG BEND PIPE ON UPPER SIDE, CONNECTING LEGS & WALL FLANGES CONFORMING TO IS 8931 WITH 10 YEARS WARRANTY ,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING & FIXING WHITE GLAZED FLAT BACK HALF STALL URINALS 1ST QUALITY CONFORMING TO IS:2556-1995 WITH STANDARD C.P. SPREADER OVERALL SIZE 95X95X57 MM CONFORMING TO IS 2556-PART 6 ,SEC-6-1974 FIXED WITH SCREWS COMPLETRE INDIAN MAKE OF SIZE 590 X 375 X 390 MM INCLUDING 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, 38.10 MM C.P WASTE COUPLING, 38.10 MM PVC SOLID WASTE PIPE OUTLET, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.
SUPPLY AND FIXING IN POSITION 584.2MM LONG ORRISA PAN WITH 100 MM 'P' OR 'S' TRAP INCLUDING PROVIDING BRICK MASONARY SEAT USING 2 ND CLASS BRICKS AS PER STANDARD PRACTICE, AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE
SUPPLY AND FIXING OF 41.30MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 25MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 40MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 32MM PPR UNION CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLY AND FIXING OF 25MM PPR UNION CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.
PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE
SUPPLYING AND LAYING 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND LAYING 75 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR DOOR SINGLE TEE 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN SINGLE ‘Y’ 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR VENT COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR VENT COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.
CONSTRUCTING 457.2 X 457.2 MM (1'-6" X 1'-6") BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING 2ND CLASS CLAY BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6" X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION FOR FINISHED ITEM OF WORK.
CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING 2ND CLASS BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.
CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING 2ND CLASS BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 152.4 MM (5'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.
SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK COMPLETE.
SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.914M (3'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.
SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOR OPEN EXCAVATION-EXCLUDING GST (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS .().
RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO: 402).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK FOR SEPTIC TANK TOP SLAB OF 125 MM THICK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK FOR SEPTIC TANK BOTTOM SLAB OF 200 MM THICK (APSS NO.403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK FOR SEPTIC TANK SIDE WALL OF 200 MM THICK (APSS NO.403)
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. FOR SEPTIC TANK (APSS.NO: 901&903)
PLASTERING TO SUPERSTRUCTURE 12MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES EXCLUDING GST., COMPLETE.FOR FINISHED ITEM OF WORK FOR SEPTIC TANK (APSS NO: 901&904)
SUPPLYING AND LAYING 75 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
PROVIDING "HYSD" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - (FOR OPEN EXCAVATION(I.E) SUMP , SEPTIC TANK ETC.,)
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS .(APSS NO: 402).
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., CPOMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS OF 335MM THICK - FOR BASEMENT
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR FOOTINGS (GATE PILLARS).
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR PEDESTALS (GATE PILLERS)
VRCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, VIBRATING , CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES. FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR COLUMNS (GATE PILLERS)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., CPOMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR WALLS FOR SUPERSTRUCTURE WALLS OF 225MM THICK FOR BASEMENT
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)
PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. ground floor (APSS NO: 901&904)
PAINTING WITH EXTERIOR EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIRECTED 2 COATS BY DILUTING 1 LIT. OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF EXTERIOR WALL PRIMER BY DILUTING 1 LIT. OF PRIMER WITH 1 LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOORS. (APSS NO.908).
PROVIDING "HYSD" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - (FOR OPEN EXCAVATION(I.E) SUMP , SEPTIC TANK ETC.,)
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS .(APSS NO: 402).
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR STATIC WATER TANK BOTTOM SLAB OF 200MM THICK
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FOR SIDE WALL OF 230 MM THICK (APSS NO. 403)
SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK (APSS NO.403) FOR TOP SLAB OF 150MM THICK
PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. FOR GROUND FLOOR (APSS.NO: 901&903)
PLASTERING TO SUPERSTRUCTURE 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES EXCLUDING GST., COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)
PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.
EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS .(APSS NO: 402).
CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO: 402).
FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST, COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)
MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., CPOMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK FOR BASEMENT.
PLASTERING TO SUPERSTRUCTURE 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES EXCLUDING GST., COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)
PAINTING WITH EXTERIOR EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIRECTED 2 COATS BY DILUTING 1 LIT. OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF EXTERIOR WALL PRIMER BY DILUTING 1 LIT. OF PRIMER WITH 1 LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOORS. (APSS NO.908).
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN ROOF SLABS WITH ALL REQUIRED ACCESSORIES INCLUDING LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES : SUDHAKAR / MODI / VIP/PRECISION
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN WALL WITH ALL REQUIRED ACCESSORIES [LIKE 'U' NAILS, JUNCTION BOX, PVC BENDS AND CEMENT] INCLUDING MASONARY WORK FOR LIGHT, FAN, COMMON, SEPARATE PLUG POINT AND SWITCH/POWER BOARDS ETC., INCLUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES: SUDHAKAR / MODI / VIP/PRECISION
SUPPLY AND FIXING OF ISI 25MM OUTER DIA HEAVY GRADE WITH IS:9537 PART 3 RIGID PVC PIPE CONCEALED IN UNDERNEETH THE FLOOR WITH ALL REQUIRED ACCESSORIES INCLUDING MASONARY WORK AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKES: SUDHAKAR / MODI / VIP/PRECISION
WIRING WITH 2 RUNS OF 14/0.3MM (1.5 SQMM) HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE SIZE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT, BELL, POINTS IN NON-RESIDENTIAL BUILDINGS BUT EXCLUDING GST COPPER CABLE MAKE:SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB. MODULAR SWITCH, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: ANCHOR PENTA CHERRY/GOLD MEDAL OLIVE/ MILLION ZOOM.
WIRING WITH 3 RUNS OF 1.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694/2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR CEILING FAN AND EXHAUST FAN POINTS IN NON-RESIDENTIAL BUILDINGS BUT EXCLUDING GST. COPPER CABLE MAKE: SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB. MODULAR SWITCH, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
WIRING WITH 2 RUNS OF 1.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694/2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT, BELL POINTS IN NON-RESIDENTIAL BUILDINGS FOR STAIRCASE LIGHT /DOUBLE HEIGHT POINTS.BUT EXCLUDING GST. COPPER CABLE MAKE: SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB. MODULAR SWITCH, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
SUPPLY AND FIXING OF 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER. WITH 6 / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL ON A COMMON SWITCH BOARD WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME WITH EARTH CONTINUITY INCLUDING WIRE LEADS, EARTH CONNECTIONS ALONG WITH ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING OF 20A 2 MODULE MODULAR SOCKET WITH SHUTTER AND 20A 1 WAY 1 MODULE MODULAR SWITCH DULY RECESSED IN WALL WITH 3 MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH 3 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. [POWER PLUG] MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING OF 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER-2 NOS AND 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL-2NOS DULY RECESSED IN WALL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH SUITABLE MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. [2 SOCKET BOARD - FOR RAW POWER] MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING OF CAT 6 RJ-45 INFORMATION OUTLETS INCLUDING SINGLE FACE PLATE ON 2 MODULER HOT DIP GALVANIZED METAL BOX INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. I/O & SINGLE FACE PLATE MAKES: D LINK / AMP / MOLEX / LEGRAND / KRONE.
SUPPLY AND FIXING OF MODULAR SOCKET TYPE TELEPHONE JACK WITH CONNECTOR ON 2 MODULAR HOT DIP GALVANIZED METAL BOX AND 2 MODULAR COVER FRAME INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. TELEPHONE JACK WITH CONNECTOR, COVER FRAME MAKES: LEGRAND LYNCUS/GM FOUR FIVE/GOLD MEDAL CURVE/ANCHOR ROMA PLUS
SUPPLY AND FIXING OF 8 PORT 10 / 100 / 1000 GIGABIT UNMANAGEABLE ETHERNET SWITCH BUT EXCLUDING GST. MAKES : TP LINK / D LINK / NETFOX.
SUPPLY AND INSTALLATION OF 6U 600 MM WIDTH X 500 MM DEPTH UL CERTIFIED WALL MOUNTING NETWORK RACK WITH SHEET STEEL REVITED METAL FRAME, TOP AND BOTTOM COVER WITH BRUSH CABLE ENTRY, CONFIRMING TO FOLLOWING STANDARDS IEC 60529, EN 60529 (IP 20), IEC 62262 EN 62622 (IK08), DIN 41494, EIA 310, IEC 60927 INCLUDING ALL ACCESSORIES LIKE HORIZONTAL PDU, METAL CABLE MANAGER, HARDWARE PACKET AND THE CANTILEVER SHELF ETC., COMPLETE BUT EXCLUDING GST. MAKES : VALLRACK (LEGRAND) / NETRACK.
SUPPLY AND RUN OF 3 OF 2.5 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB.
SUPPLY AND RUN OF 3 OF 4.0 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST.MAKE: SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB.
SUPPLY AND RUN OF 5 OF 6 SQMM HFFR PVC INSULATED 1100V GRADE AS PER IS:694 / 2010, IS 17048 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 4 RUNS OF MAINS & 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST. MAKE: SUDHAKAR/NAKODA/RR KABEL / KEI / POLYCAB.
SUPPLY AND RUN OF LAN CABLE CAT - 6 UTP CABLE IN EXISTING PVC CONDUIT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES ETC., COMPLETE. BUT EXCLUDING GST MAKES:D LINK / AMP / MOLEX / LEGRAND / KRONE.
SUPPLY AND RUN OF 2 PAIR, 0.5MM TELEPHONE COPPER WIRE IN EXISTING PVC CONDUIT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES ETC., COMPLETE. BUT EXCLUDING GST MAKES :DELTON / SURABI/POLYCAB
SUPPLY, TRANSPORTATION OF ENERGY EFFICIENT FAN, 1200 MM SWEEP, ALUMINIUM BODY, CONSUMING 28 W, BEE 5 STAR RATED, CEILING FAN WITH BRUSH LESS DIRECT CURRENT (BLDC) MOTOR, CLASS OF INSULATION: B, 3 NO'S BLADES, 30 CM LONG DOWN ROD, 2 NO'S CANOPIES, SHACKLE'KIT, COPPER WINDING, POWER FACTOR GREATER THAN 0.90, SERVICE VALUE (CMMAV) GREATER THAN 8.0, AIR DELIVERY MINIMUM 235 CMM, 350 RPM (TOLERANCE AS PER IS:374-2019), THD LESS THAN 10%. WITH REMOTE OR COMPATIBLE TO ELECTRONIC STEP TYPE REGULATOR UNIT FOR SPEED CONTROL AND ALL REMAINING ACCESSORIES INCLUDING SAFETY PIN, NUT BOLTS, WASHERS, TEMPERATURE RISE=75°C(MAX), INSULATION RESISTANCE MORE THAN 2 MEGA OHM, SUITABLE FOR 230V, 50 HZ, SINGLE PHASE AC SUPPLY, EARTHING ETC., INCLUDING ALL STANDARD ACCESSORIES ETC., COMPLETE BUT EXCLUDING GST. MAKES : CROMPTON/HAVELLS / ORIENT.
SUPPLY OF 2 MODULE MODULAR TYPE ELECTRONIC FAN REGULATOR WITH 2 MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH 2 MODULAR COVER FRAME ETC., COMPLETE BUT EXCLUDING GST. MAKE:LEGRAND LYNCUS / GM FOUR FIVE / GOLDMEDAL CURVE / ANCHOR ROMA PLUS
LABOUR CHARGES FOR FIXING OF CEILING FAN AND REGULATOR INCLUDING TRANSPORTATION AND GIVING CONNECTIONS WITH TWIN CORE WIRE ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY AND ERECTING 19/20MM STEEL TUBE DOWN ROD OF REQUIRED LENGTH WITH BOLTS & NUTS DULY PAINTED WITH MATCHING COLOUR OF FAN ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY OF 9" (225MM +/ - 5%) LIGHT DUTY EXHAUST FAN WITH METAL BLADES ETC COMPLETE MAKES : CROMPTON / HAVELLS VENTILAIR-DB/ORIENT HILL AIR
LABOUR CHARGES FOR FIXING OF EXHAUST FAN IN WALL WITH NECESSARY CONNECTIONS ETC., COMPLETE BUT EXCLUDING GST. (FOR HOLE ALREADY MADE AVAILABLE)
SUPPLY AND FIXING OF BATTEN HOLDER / SLANTING HOLDER IN LIEU OF CEILING ROSE OF LIGHT POINT COMPLETE WITH ALL CONNECTIONS AND ALL LABOUR CHARGES WITHOUT BULB (FOR NEW INSTALLATION) BUT EXCLUDING GST. BH MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.
SUPPLY AND TRANSPORTATION OF 20W +/- 10%, >/ 2000 LUMENS, 1200MM LENGTH LED RETRO TUBE LIGHT, HOUSING MADE WITH ALLUMINIUM ANODISED BODY, WIDE OPERATING VOLTAGE WITH DOUBLE SIDE CONNECTION, PF≥0.9, SURGE PROTECTION: > 2KV, THD<15%, WITH INBUILT DRIVER AND FROSTED COVER CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT AND AS PER IS SPECIFICATIONS, MINIMUM CRI≥80 ETC., COMPLETE WITH 5 YEARS WARRANTY WITH BIS CERTIFICATION.LUMINAIRE MAKE: CROMPTON /HAVELLS /OSRAM/WIPRO/PANASONIC JAQUAR. LED MAKE: : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM.
FIXING OF 20W LED TUBE LIGHT LUMINAIRE ON WALL / CEILING WITH ALL ACCESSORIES INCLUDING GIVING CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST.
SUPPLY OF 16" (400MM) BLDC 30 W WALL MOUNTED FAN WITH SERVICE VALUE 2.7 CMM / WATT WITH ALL ACCESSORIES ETC., COMPLETE BUT EXCLUDING GSTMAKES : ATOMBERG / CROMPTON / ORIENT / HAVELLS
SUPPLY AND FIXING OF 4 WAY TPN DB HORIZONTAL WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR 12 NOS S.P. OUTGOINGS AND FOR 1 NO 4 POLE INCOMER (FP ISOLATOR / MCB) WITH 100 A TINNED COPPER BUSBAR, NEUTRAL BAR, EARTH BAR AND CABLE TIES FOR CABLE MANAGEMENT, FULLY SHROUDED NEUTRAL BAR, PROFILE BLANKING MODULES FOR UNUSED MCB WAYS, DIN BARS AND DETACHABLE GLAND PLATE ETC., COMPLETE WITH INTER CONNECTIONS BUT EXCLUDING GST. INCOMMER: 40A FP ISOLATOR - 1NO. OUTGOING: 6-32A SP MCB, 10KA ISI MARK - 12 NOS. DB MAKES: ABB/C&S ISOLATOR MAKE: ABB/C&S/HAVELLS MCB MAKE:ABB/C&S/HAVELLS
SUPPLY AND FIXING DISTRIBUTION BOARD WITH 20A SP PLUG AND SOCKET WITH SS ENCLOSURE WITH 10/16/20A 10KA SP MCB, C/D CURVE ISI MARK INCLUDING INTERNAL CONNECTION AND LABOUR CHARGES FOR SURFACE / FLUSH MOUNTING ETC., COMPLETE BUT EXCLUDING GST. MAKE: LEGRAND / SCHNEIDER / SIEMENS / LK (L&T). MCB MAKE: LEGRAND-DX3 / SCHNEIDER-ACTI9 / SIEMENS / LK (L&T) EXORA.
SUPPLY OF 16 SQMM 3.5 CORE XLPE INSULATED, 1100V GRADE ARMOURED ALLUMINIUM CABLE WITH ISI MARK AS PER SPECIFICATION CONFIRMING TO IS:7098 (PART - I) BUT EXCLUDING GST. MAKES : UNIVERSAL /TORRENT/ POLYCAB / GLOSTER/HAVELLS/RPG
SUPPLY AND FIXING OF HEAVY DUTY TYPE DOUBLE COMPRESSION WEATHER SUPPLY AND FIXING OF HEAVY DUTY TYPE DOUBLE COMPRESSION WEATHER PROOF TYPE BRASS CABLE GLANDS DULY NICKEL PLATED AS PER BS 6121 AND IP66 COMPLETE WITH BRASS CHECKNUT, OUTER SHEATH SEALING GASKET SUITABLE FOR 16 SQMM 3.5 CORE XLPE INSULATED ARMOURED CABLE AND HEAVY DUTY LONG BARREL ALLUMINIUM LUGS CONFIRMING TO I.S SPECIFICATIONS SUITABLE FOR 16 SQMM 3.5 CORE XLPE INSULATED ARMOURED CABLE ETC COMPLETE WITH NUTS, BOLTS AND WASHERS ETC., COMPLETE BUT EXCLUDING GST. GLANDS MAKES: SMI / COMMET / DOWELS. LUGS MAKES: DMI / JAINSON / DOWELS.
EARTH WORK EXCAVATION OF TRENCH IN HARD GROUND SOIL, LAYING OF U.G CABLES UPTO 50 SQMM ON SAND CUSHION COVERING THE CABLE WITH BRICKS AND BACK FILLING OF TRENCH DULY PROVIDING ROUTE INDICATOR EMBEDDED IN C.C INCLUDING COST AND CONVEYANCE OF MATERIALS AND LABOUR CHARGES ETC., COMPLETE BUT EXCLUDING GST.
LABOUR CHARGES FOR RUN OF UG CABLE ON WALL / EXISTING PIPE WITH NECESSARY FIXING ARRANGEMENTS SUCH AS SADDLES, CLAMPS, WOODEN SEPARATORS ETC., (AS DIRECTED BY DEPARTMENTAL OFFICIAL) ETC., COMPLETE BUT EXCLUDING GST.
PROVIDING INDEPENDENT EARTHING FOR IMPORTANT EQUIPMENT WITH 40MM DIA 'B' CLASS 2.5M LONG G.I PIPE AND 19MM DIA 'B' CLASS G.I PIPE OF 0.3MTR. LONG CONNECTED WITH REDUCER PROVIDING G.I FUNNEL WITH MESH ENCLOSED IN C.C/ BRICK MASSONRY CHAMBER OF 450M X 450M X 400MM WITH R.C.C. SLAB COVER DULY PROVIDING STAGGERED HOLES FILLING WITH 20KG SALT AND 40KG CHARCOAL OR 40KG BENTONITE POWDER FROM THE BOTTOM OF THE PIPE GIVING EARTH CONNECTION FROM ELECTRODE THROUGH G.I STRIP OF 40 X 6MM X 200MM LENGTH WITH ALL ACCESSORIES AND LABOUR CHARGES COMPLETE, AS PER IS SPECIFICATIONS 732/1982 (PART II) BUT EXCLUDING GST.
SUPPLY AND RUN OF NO.8 SWG G.I WIRE INCLUDING COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC.COMPLETE.
SUPPLY OF 4 WAY VTPN DB WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR ACCOMMODATING TP / DP AS OUT GOINGS AND 125A / 160A 4 POLE MCCB AS INCOMER WITH 250A TINNED COPPER BUSBAR, NEUTRAL BAR, EARTH BAR AND CABLE TIES FOR CABLE MANAGEMENT, FULLY SHROUDED NEUTRAL BAR, PROFILE BLANKING MODULES FOR UNUSED MCB WAYS, DIN BARS AND DETACHABLE GLAND PLATE ETC., COMPLETE WITH INTERCONNECTIONS BUT EXCLUDING GST. INCOMMER: 125A 4 POLE MCCB, 25KA - 1NO. OUTGOING: 40A 10KA TP MCB C/D CURVE ISI - 2 NOS. DB MAKES : C&S/ABB MCCB MAKE:C&S -WINBREAK/LK (L&T) - D SINE / SCHNEIDER-NS NSX MCB MAKE:C&S/ABB/HAVELLS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
~$nder Conditions11.docx
TENDER_DOCUMENT • 0.00 MB
BOQ OF FSB KHANAPUR.xls
TENDER_DOCUMENT • 0.28 MB
Floor Plans of FSB Khanapur .pdf
TENDER_DOCUMENT • 0.64 MB
Site plan FSB Khanapur.pdf
TENDER_DOCUMENT • 0.26 MB
Tender Conditions.docx
TENDER_DOCUMENT • 0.30 MB
Download all tender documents and submit your bid