Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance E 7 HIG 497 ARERA COLONY BHOPAL 16 M P | BHOPAL | BHOPAL | MADHYA PRADESH | 462016 | -5.82% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-PreQual/Technical | - | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
10 Aug 2026, 6:00 pmClosed
Regional Manager, RIICO OFFICE, Churu
Regional Manager, RIICO OFFICE, Churu
Widening and Re-Carpeting of B.T. Roads, Improvement of ROW of Major roads by Laying Interlock Tiles and Construction of C.C. road at I/A Sadulpur Ph-III, Churu
2026_RIICO_577254_1
2026-27/Churu/12
Open Tender
Civil Works
Percentage
180 days
SADULPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Regional Manager,RIICO
₹8.4 L
25 Aug 2026
24 Jul 2026
11 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 582.75 | cum | 100 | ₹58,275 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em | 11,655 | Cum | 31 | ₹3,61,305 |
| 3 | Compacting soil at optimum moisture content with power road roller including watering soil at O.M.C., charges of T & P, cost of water and finishing of formation to required camber and grade etc. complete in layers not exceeding 15 cm. compacted thickness, 97% proctor density. | 2,913.75 | P. Cum | 15.9 | ₹46,328.63 |
| 4 | Wet Mix Macadam, Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406., By Mechanical Means with all lead | 2,464.22 | Cum | 1,147 | ₹28,26,459.19 |
| 5 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base (Stablised soil baes/Crusher Run Macadam) including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per MoRTH Specification Clause 502. | 12,022.5 | Sqm | 39 | ₹4,68,877.5 |
| 6 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 12,022.5 | Sqm | 9.6 | ₹1,15,416 |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 12,022.5 | Sqm | 11 | ₹1,32,247.5 |
| 8 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of, Grading - II (26.50 mm (Nominal Size)) | 1,352.53 | P.MT | 2,969 | ₹40,15,654.15 |
| 9 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and f, for Grading-II(13 mm nominal size) Bitumen (VG-30) | 847.59 | P.MT | 3,360 | ₹28,47,894 |
| 10 | Granular Sub-Base with Close Graded Material (Table:- 400-1), For Grading-I Material | 2,063.63 | Cum | 882 | ₹18,20,119.9 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TDSADULPURCC.pdf
Tender Documents • 0.76 MB
BOQ_1026043.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].