Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.9 LAccepted-AOC | ₹5.9 L Quoted ₹5.0 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹5.3 L+₹28,586.09 (5.73%)Rejected-Finance | ₹5.3 L+₹28,586.09 (5.73%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹5.4 L+₹39,511.67 (7.92%)Rejected-Finance AT PO MAHAGAMA DIST GODDA JHARKHAND 814154 | MAHAGAMA | GODDA | JHARKHAND | 814154 | ₹5.4 L+₹39,511.67 (7.92%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹5.9 L
EMD Value
₹7,400
Closing Date
9 Feb 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of PCC road near plot no-662 at Hijukita rehab site under Rajmahal Area.
2026_ECL_352129_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/464 Dt-30.01.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Hijukita rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,400
31 Aug 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
30 Jan 2026 - 2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Embankment Construction with Material Obtained from Borrow Pits. Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreadin, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 1 | Cum | 152.05 | ₹151.9 |
| 3 | Plant Mix Method: Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Grading II Material. | 1 | Cum | 2,392.7 | ₹2,390.31 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | 4,932.6 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived natural sources : 3 graded stone aggregate 20 mm nominal size derived natural sources) | 1 | Cum | 6,458.3 | ₹6,451.84 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sqm | 269.3 | ₹269.03 |
| 7 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_364922.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_364922.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .