Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC 4 CHAMPAKLAL INDUSTRIAL ESTATE SION EAST MUMBAI MAHARASHTRA 400022 MH33B0007257 27AAACF0502F1ZC B R M MSME STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400022 | L1 | Accepted-AOC As Per Attached W.O | |
| 2 | L2₹7.3 Cr+₹34.7 L (4.96%)Rejected-AOC 19 20 VARDHMAN COMPLEX BEHIND P S BANK LBS MARG VIKHROLI WEST MUMBAI 400083 | MUMBAI | MUMBAI | MAHARASHTRA | 400083 | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.7 Cr+₹68.0 L (9.73%)Rejected-AOC 202 EXCLUSIVE APARTMENT A S MARG OPP I T MAIN GATE NEAR BHAWANI PETROL PUMP POWAI MUMBAI 400076 | MUMBAI | MUMBAI | MAHARASHTRA | 400076 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 May 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager(Engg.)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
Design, Engineering, Supply, Installation, Testing and Commissioning of Rim Seal and Fire Protection and Detection System for 2 Nos. MS and 2 Nos. Alkylate Tanks for our tankage project at IOCL, Paradip Refinery Paradip, Odisha
2022_BandR_681575_1
BandR/TY/40087/ENQ/RIM SEAL/01
Limited
Miscellaneous Works
Supply
150 days
IOCL, Paradip Refinery Paradip
As Per Tender Document
12 documents required · 12 mandatory
₹5,900
Yes
Bridge and Roof Co.India Ltd
₹1 L
Yes
3 Nov 2022
31 Mar 2022
7 May 2022
31 Mar 2022
6 May 2022
31 Mar 2022
120 days
Amount
Procurement, erection & installation and commissioning including design, engineering, fabrication, calibration, testing of automatic actuated Rim seal fire detection and foam based extinguishing system for external floating roof tanks (EFRT) storing class “A” petroleum products in line with OISD standard 116/117. Only those Rim seal protection systems, which use the linear heat hollow metallic tube type detectors with foam based extinguishing media shall be used. These detection systems shall be certified by any of the international certifying agencies like UL, FM, Vds or LPC to ensure that those systems are used which meet with the highest international standard of safety certification. The automatic actuated Rim seal fire Detection & Extinguishing system shall consist of: a) Linear Heat Hollow metallic tube type detection system. b) Automatic Foam based Fire Extinguishing system c) Control and monitoring of heat detection and Fire extinguishing system. d) Associated Cabling & Piping
( CONTINUE FROM ABOVE ) The overall purpose of the system is to detect and extinguish the Rim seal fire over external floating roof tanks storing class “A” Petroleum products at the incipient stage and simultaneously alert the personnel at the facility so that they can respond to the incident. For supply complete material for Rim seal system including pre-fabrication, fabrication, erection, construction, installation, testing, pre-commissioning, mechanical completion, commissioning and conducting performance guarantee tests required for Rim seal system completing and establishing the plant as a fully functional and operative unit, including (but not limited to) providing all labour and manpower, resources, transportation, store management, construction equipment, tools, tackles and aids, safety devices, testing devices, insurance, facilities, utilities, communication systems, material and other reconciliations, handing over of final drawings / documents / manuals, obtaining and satisfying all statutory licenses, clearances, consents, no objections, approvals and certificates and complying with all statutory formalities etc. And all other services whatsoever required for completing the works in all respect for rim seal system in accordance with the bidding documents and direction of engineer-in-charge required Spare shall be considered as per Spare Philosophy as per document no. 080557C/T/ANKS/LSTK-2
FOR ALKALYTE TANK (Dia. 50.5 MTR)
FOR MS TANK (Dia. 42.2 MTR )
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
Vimal Fire Controls Pvt. Ltd.
HSE ENGINEERS PVT.LTD.
stage.html
html • 0.05 MB
technical_717292.pdf
PDF • 0.04 MB
techsummary_717292.pdf
PDF • 0.13 MB
finance_717292.pdf
PDF • 0.05 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_717292.pdf
PDF • 0.05 MB
WO.pdf
PDF • 7.55 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .