Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 CrAccepted-AOC | ₹22.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹23.7 CrRejected-Finance | ₹23.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹25.3 CrRejected-Finance | ₹25.3 Cr | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹39.8 L
Closing Date
22 Feb 2021, 3:30 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
WIDENING AND STRENGTHENING OF PIHANI JANGBAHADUR GANJ ROAD (ODR) FROM KM 1(700) TO 19(600) (LENGTH 17.900 KM) UNDER RAJYA YOJANA SCHEME IN F Y-2020-21 IN DIST HARDOI
2021_CEUCZ_553188_1
634M/1MT/ E-TENDER/ U.C./20-21 DATE 27.01.2021
Open Tender
Civil Works
455 days
HARDOI
WIDENING AND STRENGTHENING OF PIHANI JANGBAHADUR GANJ ROAD (ODR) FROM KM 1(700) TO 19(600) (LENGTH 17.900 KM) UNDER RAJYA YOJANA SCHEME IN F Y-2020-21 IN DIST HARDOI
2 documents required · 2 mandatory
₹2,715
₹39.8 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
15 Nov 2022
9 Feb 2021
23 Feb 2021
9 Feb 2021
22 Feb 2021
9 Feb 2021
11 Feb 2021
Amount
Dismantling of existing structures, like culverts, bridges, retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (Including labour Cess & Excluding GST)
Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Widening). (Including labour Cess & Excluding GST)
Earthwork in construction of subgrade/ embankment with material obtained from excavation at item No. 3, with all lifts and lead, spreading, grading to required slope and compacting to meet requirement of table 300-2 (Machenical compaction only).. (Including labour Cess & Excluding GST)
Construction of subgrade with approved material obtained from borrow pits with all lift & lead , transporting to site, spreading,grading to required slope and compected to meet requirement of table 300-2 Including labour Cess & Excluding GST
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Providing, laying, and spreading graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achive the desired density. (Including labour Cess & Excluding GST).
Providing, laying, and spreading graded stone aggregate to stablized wet mix macadam ( Cement 1% and 3.5 % Emultion) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achive the desired density (Including labour Cess & Excluding GST).
Construction of earthen shoulder with approved material obtained from borrow pits(carted earth) with all lift & lead , transporting to site, spreading,grading to required slope and compected to meet requirement of table 300-2 (Including labour Cess & Excluding GST).
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom . (Including labour Cess & Excluding GST)
Providing and laying bituminious concrete using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (Including labour Cess & Excluding GST)
Laying reinforced cement concrete pipe of 350 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works,back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST).
Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days (Including labour Cess & Excluding GST).
Furnishing and placing reinforced cement concrete grade M-20 in Sub/super structure as per drawing and Technical Specifications (Including labour Cess & Excluding GST).
Furnishing and placing reinforced cement concrete grade M-25 in Sub/super structure as per drawing and Technical Specifications (Including labour Cess & Excluding GST).
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses (Including labour Cess & Excluding GST).
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations (Including labour Cess & Excluding GST).
Laying reinforced cement concrete pipe of 1000 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works,back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST).
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Including labour Cess & Excluding GST).
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST).
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification (Including labour Cess & Excluding GST).
SIDDHARTH CONSTRUCTION
M/s PBC Infrastructure India Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid