Loading…
Loading…
Tender Value
₹17.1 Cr
EMD Value
₹34.3 L
Closing Date
7 Sept 2026, 11:00 am
SANJAY SHARMA
Karnal PHED No. 2
Instt. of M.S. Tubewell, Pumping machinery, Const. of Pump Chamber, Boundary wall ., CC Road, Sluice valves hodies and Internal Distribution system STP , Sewerage Network
2026_HRY_540856_1
20267C4B544C 1EA5 4947 A53B AF14BB613442572PUH
Open Tender
Civil Works
Works
540 days
BARA GAON BARA GAON
2 documents required · 2 mandatory
₹20,000
₹34.3 L
Yes
14 Aug 2026
14 Aug 2026
7 Sept 2026
14 Aug 2026
7 Sept 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing lowering in trenches to correct gradient and alignments jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS-458-2003 into trenches for all depths and laying out the same to correct alignment gradients levels etc cutting of concrete beds and joints holes supporting the pipes and specials in corrected position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelops are completed. The pipes shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and all defects to the entire satisfaction of the Engineer incharge including all cartage etc complete in all respect RCC NP-3 450 mm i/d pipe with inside HDPE lining | 578 | Metre | - | - |
| 2 | SandE of Pressure Gauges with siphon cock as per IS:3624 and having 100mm dia, Dual Gauge, in delivery pipe inside Pump chamber | 4 | NO. | - | - |
| 3 | Providing lowering in trenches to correct gradient and alignments jointing with tytone rubber joint and cutting of RCC S/S pipes having inside HDPE lining ISI marked as per IS-458-2003 into trenches for all depths and laying out the same to correct alignment gradients levels etc. cutting of concrete beds and joints holes supporting the pipes and specials in corrected position in a suitable rigid manner while the same are being jointed and until the surrounding benching, haunches and envelops are completed. The pipes shall rest on the beds at all joints through their lengths and to ensure this, testing the pipes for leakage and all defects to the entire satisfaction of the Engineer in-charge including all cartage etc. complete in all respect RCC NP-3 400 mm i/d pipe with inside HDPE lining | 319 | Metre | - | - |
| 4 | Providing and Fixing in position UPVC SWR Bend 110 x110mm as per S.I. Manufacture and reputed firm complete in all respect | 5,365 | NO. | - | - |
| 5 | Providing and Fixing in position UPVC SWR Reducer 110 x 90mm as per S.I. Manufacture and reputed firm complete in all respect | 2,146 | NO. | - | - |
| 6 | Providing and Fixing in position UPVC SWR Duct Foot Bend 110 x 110mm as per S.I. Manufacture and reputed firm complete in all respect | 4,292 | NO. | - | - |
| 7 | -MAIN PUMPING STATIONS Design, construction, erection, testing and commissioning of MPS and following components including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period:- as per detail attached RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.00 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 3 No. Pumping Set of i.e. 4200 LPM x 30 Mtr. Head = 1 no. (250 m^/hr), 1400 LPMx 30 Mtr. Head=2 No. (83.33 m^/hr) and 700 LPMx 30 Mtr. Head=2 No. (41.66 m^/hr) each suitable LT panel equipped with all safety devices, automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valves as per requirements even for bye-pass arrangements complete in all respect.3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design.Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 mtr. for 2.00 MLD average flow with peak factor of 3.0: i) The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump sump job. iii) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. iv) The size and quantities of all the above components will be as per approved structural/ Hydraulic/ Mechanical/ Electrical design to be approved by Departmental before actual execution of work including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period. | 1 | Job | - | - |
| 8 | Annexe Building ( Ground Floor)and Utility Building (Ground Floor),Sludge Room and Centrifuge Building G plus 1) : -_ Construction of HT / LT Panel room, PLC room, Centrifuge house, Laboratory, office, MCC, Pantry, Porch, Chlorination Building, security room, centrifuge building, sludge pump room, toner room, Meter room, blower room including doors, windows and fittings with toilet blocks, pantry including all Sanitary fittings etc. as per drawings attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, anodized/powder coated aluminium frame of size 101.60mm x 50.80mm x 4.78mm for chowkhat, 99.00mm x 52.00mm x 3.00mm for door frame, 76.20mm x 44.46mm x 3.20mm for window frame with 5mm thick toughened glass AIS/Saint Gobain/ Modi Float Covered Area (150 sqm) including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period. | 250 | Sqm | - | - |
| 9 | CCTV CAMERAS Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site. i) At STP and MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6 mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR, CCTV Cameras should be installed and commissioned before starting execution of work including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period | 1 | Job | - | - |
| 10 | ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM FOR BOD, COD, TSS, PH:- Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 2.0 STP for online (Continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED. TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluent and as contained in scope of work A) Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs/ Outputs (4 inputs and 4 outputs) (o/4-20 Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet/ effluent of plant of 2.00 MLD STP with integrated with automatic cleaning B) Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) cable length 100 Meter (minimum) C) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (minimum) D) Data Transfer to CPCB, HSPCB and PHED Servers E) Providing GSM 5G, 4G Modem with mobile network connectivity including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.00 MB
BOQ_620230.xls
BOQ • 0.29 MB
1G4BMRZ169095.pdf
Additional Documents • 4.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].