| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.8 LAdmitted-Fee/PreQual/Technical/Finance | -44.99% | ₹29.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹32.0 LAdmitted-Fee/PreQual/Technical/Finance | -40.99% | ₹32.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹34.2 LAdmitted-Fee/PreQual/Technical/Finance | -36.87% | ₹34.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹36.0 LAdmitted-Fee/PreQual/Technical/Finance | -33.50% | ₹36.0 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹40.6 LAdmitted-Fee/PreQual/Technical/Finance | -25.00% | ₹40.6 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹63.9 L
EMD Value
₹1.3 L
Closing Date
13 Aug 2026, 6:00 pmClosed
EE CHAULI CANAL DIV JHALAWAR
EE CHAULI CANAL DIV JHALAWAR
Construction of MST near village garnawad tehsil pachpahar district jhalawar
2026_WRDAS_579470_1
NIT No 01 2026-27 EE CHAULI CANAL DIV JHALAWAR
Open Tender
Civil Works
Percentage
JHALAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
AS PER NIT
₹1.3 L
Yes
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for 10.1.3 Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 738.88 | sqm | 220 | ₹1,62,553.6 |
| 2 | 10.10 Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. 10.10.2 Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. | 36.6 | CUM | 200 | ₹7,320 |
| 3 | 10.9.2 Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. 10.9.2.2 Tor or ribbed bars (IS :1786) | 2,178.28 | KG | 78 | ₹1,69,905.84 |
| 4 | 11.12 Preparation of foundation of structure including removal of all loose stones, silt and final washing. 11.12.1 By manual labour | 449.62 | SQM | 23 | ₹10,341.26 |
| 5 | 18.1 Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. 18.1.1 Ordinary | 2,200 | sqm | 1.45 | ₹3,190 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b)Hard / dense soil | 82.73 | Cum | 79 | ₹6,535.67 |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (c) Hard soil mixed with Kankar / boulders, Morrum | 852.45 | Cum | 99 | ₹84,392.55 |
| 8 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctors density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b) With lead beyond 250 m and up to 750 m (1/2 Km) Extra lead over item no 5.1.1 to 5.8.3 of excavated material. (b)Add extra over item no. 5.1.1 to 5.8.3 for lead beyond 250m and upto 750m (for average 1/2Km) | 4,583.62 | Cum | 125.25 | ₹5,74,098.41 |
| 9 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (ii) at least 98% of Standard Proctors density | 4,583.62 | Cum | 36 | ₹1,65,010.32 |
| 10 | Lip cutting and final dressing as per designed section including rehandling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect | 789.2 | Sqm | 29 | ₹22,886.8 |
stage.html
html • 0.11 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
BOQ_1029794.xls
BOQ • 0.29 MB
nf.pdf
PDF • 1.38 MB
CORJ.pdf
PDF • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].