Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹68.9 L+₹8,718.14 (0.13%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹69.1 L+₹22,995.19 (0.33%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹70.1 L+₹1.2 L (1.82%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹70.8 L+₹2.0 L (2.88%)Admitted-Fee/PreQual/Technical/Finance 23 B KILPAUK HALLS ROAD CHENNAI TAMIL NADU 600010 | CHENNAI | TAMIL NADU | 600010 | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MANIKANDAN L7 | B JOTHEESWARAN L6 | Wings Brand Activations (I) Pvt Ltd L5 | D D INFRA L4 | ELUMALAI K A L1 | ARUNRAJ L3 | GAJENDRAN L2 | osandco L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers | 348 | m3 | 308.13 ₹1,07,229.24 | 294 ₹1,02,312 | 300 ₹1,04,400 | 285 ₹99,180 | 283 ₹98,484 | 280 ₹97,440 | 270 ₹93,960 Lowest | 312.53 ₹1,08,760.44 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 36.5 | m3 | 1,883.45 ₹68,745.93 | 1,794 ₹65,481 | 1,800 ₹65,700 | 1,740 ₹63,510 Lowest | 1,881 ₹68,656.5 | 1,870 ₹68,255 | 1,865 ₹68,072.5 | 1,910.35 ₹69,727.78 |
| 3.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 48 | m3 | 171.28 ₹8,221.44 | 163 ₹7,824 | 950 ₹45,600 | 158 ₹7,584 | 157 ₹7,536 | 156 ₹7,488 | 154 ₹7,392 Lowest | 173.72 ₹8,338.56 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling crushed stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 55 | m3 | 461.64 ₹25,390.2 | 440 ₹24,200 | 1,250 ₹68,750 | 426 ₹23,430 | 424 ₹23,320 | 420 ₹23,100 Lowest | 420 ₹23,100 Lowest | 468.23 ₹25,752.65 |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 36 | m3 | 4,955.94 ₹1,78,413.84 | 4,720 ₹1,69,920 | 4,900 ₹1,76,400 | 4,578 ₹1,64,808 | 4,543 ₹1,63,548 | 4,519 ₹1,62,684 | 4,512 ₹1,62,432 Lowest | 5,026.73 ₹1,80,962.28 |
| 6.00 | Supplying and erecting steel Strutting including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 152 | m2 | 597.16 ₹90,768.32 | 569 ₹86,488 | 550 ₹83,600 | 551 ₹83,752 | 548 ₹83,296 | 544 ₹82,688 | 543 ₹82,536 Lowest | 605.69 ₹92,064.88 |
| 7.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 129 | m2 | 931.01 ₹1,20,100.29 | 887 ₹1,14,423 | 650 ₹83,850 Lowest | 860 ₹1,10,940 | 854 ₹1,10,166 | 848 ₹1,09,392 | 847 ₹1,09,263 | 944.31 ₹1,21,815.99 |
| 8.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 154 | m2 | 523.65 ₹80,642.1 | 499 ₹76,846 | 650 ₹1,00,100 | 484 ₹74,536 | 480 ₹73,920 | 477 ₹73,458 | 476 ₹73,304 Lowest | 531.13 ₹81,794.02 |
| 9.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 144 | m2 | 787.61 ₹1,13,415.84 | 750 ₹1,08,000 | 650 ₹93,600 Lowest | 727 ₹1,04,688 | 722 ₹1,03,968 | 718 ₹1,03,392 | 717 ₹1,03,248 | 798.85 ₹1,15,034.4 |
| 10.00Providing and Laying in position, Standardised Concrete mix M-20 Grade in accordance with IS 456-2000,using 20 mm and down graded hard broken granie stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixure (Plasticiser / super plasticiser) in recommended proportions as per IS :9103 to accelearate,retard setting of concrete, improve work ability without imparing strength and durability with about (5 cu.m.) 7730 kg, of 20mm machine crushed stone jelly and with amount (3.3 cu.m) 5156 kg of 10-12 mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc., and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claming extra etc., complete complying with std.specification and as directed by the Deptl.,Officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the ecess usuage of materials). | |||||||||||
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
24 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Superintending Engineer, PWD.,
The Superintending Engineer, PWD., Buildings (C and M) Circle-1, Chepauk, Chennai-5
Construction of Kitchen Block in Government Hospital at Ponneri in Tiruvallur District
2026_PWD_721943_1
PWD/BCMC1/16-3/2026-27
Open Tender
Civil Works
Lump-sum
150 days
Government Hospital at Ponneri in Tiruvallur Distr
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹56,000
24 Nov 2026
6 Nov 2026
24 Nov 2026
6 Nov 2026
24 Nov 2026
6 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers | 348 | m3 | - | - |
| 2 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 36.5 | m3 | - | - |
| 3 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 48 | m3 | - | - |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 55 | m3 | - | - |
| 5 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 36 | m3 | - | - |
| 6 | Supplying and erecting steel Strutting including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | 152 | m2 | - | - |
| 7 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 129 | m2 | - | - |
| 8 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 154 | m2 | - | - |
| 9 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 144 | m2 | - | - |
| 10Providing and Laying in position, Standardised Concrete mix M-20 Grade in accordance with IS 456-2000,using 20 mm and down graded hard broken granie stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixure (Plasticiser / super plasticiser) in recommended proportions as per IS :9103 to accelearate,retard setting of concrete, improve work ability without imparing strength and durability with about (5 cu.m.) 7730 kg, of 20mm machine crushed stone jelly and with amount (3.3 cu.m) 5156 kg of 10-12 mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc., and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claming extra etc., complete complying with std.specification and as directed by the Deptl.,Officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the ecess usuage of materials). | |||||
stage.html
html • 0.03 MB
finance_867654.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
KitchenBlockPonnerischcondtion.pdf
Tender Documents • 1.44 MB
BOQ_867654.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .