| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC PANDAVESWAR BARDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | ₹10.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹10.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹11.2 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹11.2 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ANIESH KHAN L1 | NANDI ENTERPRISE L3 | SABIR CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Installation of Submersible Pump. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Lowering of 6" MS pipe and 10 nos. of 3" MS pipe | 18 | Manshift | 1,330.39 ₹23,947.02 | 1,394.91 ₹25,108.38 | 1,361.26 ₹24,502.68 |
| 1.02 | Transportation the said MS pipe on trolley through haulage line upto site and laying on proposed way | 48 | Manshift | 1,330.39 ₹63,858.72 | 1,394.91 ₹66,955.68 | 1,361.26 ₹65,340.48 |
| 1.03 | Transportation of 60 nos(Approx) MS flange, 6 " Bend 02 nos., submersible motor and bend cable etc. | 18 | Manshift | 1,280.95 ₹23,057.1 | 1,343.08 ₹24,175.44 | 1,310.67 ₹23,592.06 |
| 1.04 | Fitting of 80 flanges | 16 | Manshift | 1,330.39 ₹21,286.24 | 1,394.91 ₹22,318.56 | 1,361.26 ₹21,780.16 |
| 1.05 | Joining of 40 nos MS pipes | 10 | Manshift | 1,330.39 ₹13,303.9 | 1,394.91 ₹13,949.1 | 1,361.26 ₹13,612.6 |
| 1.06 | 160 nos of Joint cutting from rejected conveyor belt | 16 | Manshift | 1,330.39 ₹21,286.24 | 1,394.91 ₹22,318.56 | 1,361.26 ₹21,780.16 |
| 1.07 | Miscellaneous job like alignment of pipe line, floor cutting, floor levelling, supporting job and leakage rectification | 8 | Manshift | 1,330.39 ₹10,643.12 | 1,394.91 ₹11,159.28 | 1,361.26 ₹10,890.08 |
| 1.08 | Lowering of 10 HP submersible pump, starter and armoured cable | 24 | Manshift | 1,330.39 ₹31,929.36 | 1,394.91 ₹33,477.84 | 1,361.26 ₹32,670.24 |
| 1.09 | Supply & erection of 6 sqmm, 3 core, armoured power cable of total 120 mtr length | 1 | Job | 24,600 ₹24,600 | 25,793.1 ₹25,793.1 | 25,170.72 ₹25,170.72 |
Tender Value
₹10.7 L
EMD Value
₹13,400
Closing Date
10 Feb 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Installation of Submersible Pump and transportation of different stage pumps of Pandaveswar Colliery
2026_ECL_352151_1
GM-PND/EandM/25-26/271/1483 dated 30/01/2026
Open Tender
Electrical and Maintenance Works
30 days
Pandaveswar Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹13,400
6 Mar 2026
31 Jan 2026
11 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
31 Jan 2026 - 3 Feb 2026
Installation of Submersible Pump. (Inclusive of EPF/CMPF)
Lowering of 6" MS pipe and 10 nos. of 3" MS pipe
Transportation the said MS pipe on trolley through haulage line upto site and laying on proposed way
Transportation of 60 nos(Approx) MS flange, 6 " Bend 02 nos., submersible motor and bend cable etc.
Fitting of 80 flanges
Joining of 40 nos MS pipes
160 nos of Joint cutting from rejected conveyor belt
Miscellaneous job like alignment of pipe line, floor cutting, floor levelling, supporting job and leakage rectification
Lowering of 10 HP submersible pump, starter and armoured cable
Supply & erection of 6 sqmm, 3 core, armoured power cable of total 120 mtr length
Shifting of submersible pump & pipe extension as per lowering water level
Transportation of failed 6 stage pump at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
TRANSPORTATION OF REPAIRED 6 STAGE PUMP
TRANSPORTATION OF FAILED 6 STAGE PUMP
SUPPLY OF MS NUT BOLT
LAYING AND RE ORGANIZATION OF PUMP
Transportation of failed Pluro II stage Pump at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Trans of failed PL II 6 stage pump
Trans of repaired PL II 6 stage pump
Trans of failed PL II 3 stage pump
Trans of repaired PL II 3 stage pump
Trans of failed 65HP motor
Supply of MS nut bolts
TRANS OF FAILED PL II PUMP 6 STAGE
TRANS OF REP PL II 6 STASGE PUMP
TRANS OF FAILED PL II 3 STAGE PUMP
TRANS OF REP PL II 3 STAGE PUMP
TRANS OF FAILED 65HP MOTOR
Shifting of Pluro II Stage Pump & Pluro II 3 stage pump at No 2 PIT at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Shifting of Pluro II 6 stage pump
Shifting of Pluro II 3 stage pump
Shifting of R-10-D monopumps
Supply of MS nut bolt etc.
Shifting of Pluro II 6 stage pump
Shifting of Pluro II 3 stage pump
Shifting of R-10-D monopumps
Cleaning of Sub station, winding engine & Head Gear Structure at Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Cleaning of unwanted plant near sub station
Cleaning of unwanted plants near winding
Cleaning of winding engine of all pits
Cleaning of head gear structure
Supply of carbolic acid, jhuri
Cleaning of unwanted plant near sub station
Cleaning of unwanted plants near winding
Cleaning of winding engine of all pits
Cleaning of head gear structure
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_364943.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid