Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹98,500
Closing Date
7 Sept 2026, 4:00 pm
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Landscaping of Front area of Main Campus including the area between Central Library, Admin Block Departmental Blocks at GMC Anantnag.
2026_PWDJK_322580_1
NIT 74 of RnB/Ang/2026-27/6396-405 Dt 27/08/26
Open Tender
Civil Works
Percentage
180 days
Anantnag
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Centralized Designated Pooling Ac 0470010200000099
₹98,500
27 Aug 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in foundation trenches, drains, pipes and cables etc.(not exceeding 1.5 Mtr. In width or 10 SqMts on plan) including dressing of sides and ramming of bottoms, lift upt 1.5 Mtr. Including getting out excavated soil and disposal of surplus soil as directed and lead up to 50 Mtrs . | 89.57 | cum | - | - |
| 2 | Providing and laying hand packed stone soling in foundation ,under floors etc. incl ramming, watering and consolidating complete ,cost and carriages of all materials involved upto site of work complete. | 39.58 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade M-7.5 excluding the cost of centering and shuttering - All work at all levels in : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including cost and carriage of all materials involved upto site of work complete. | 26.12 | cum | - | - |
| 4 | Providing and laying in position cement concrete in M-15 grade concrete excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials involved upto site of work complete. | 87.16 | cum | - | - |
| 5 | Providing form work including Centering ,shuttering , strutting, propping etc.using ply wood sheeting with water proofing ply board (12 mm min.thickness) and removal of the same for( All work at all levels complete.) walls | 320.63 | sqm | - | - |
| 6 | Providing and laying in position Full colur vitrified tiles of size 400mm x 400mm conforming to ISI15622 laid on 1:4 mix i/c pointing of joints with white cement and matching pigment, all complete as per directions of incharge laid over 20mm thick (1:4) mix Mortor | 219.14 | sqm | - | - |
| 7 | Structural steel Work in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using CI etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.ORNAMENTAL WORK&carriages of all materials involved upto site of work complete | 5,775 | kg | - | - |
| 8 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc completeOn CI work | 306.69 | sqm | - | - |
| 9 | Supply and Filling of Avavilabe earth incl Cutting from avaliable araa within Campus | 554.93 | cum | - | - |
| 10 | Suupply & Spreading of good earth in required thickness as per directions of officer in-charge incl leveling and compaction all leads and lifts complete job | 607.8 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1082370.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].