Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹93.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.3 Cr+₹32.9 L (35.1%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
17 Jul 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Upgradation / Revival of Green park Harwan.
2026_PWDJK_314998_1
NIT No._26_/e-tendering /DAL/2026-27/_3501-09 Dt._07-07-2026
Open Tender
Civil Works
Percentage
30 days
Harwan.
as per Nit
2 documents required · 2 mandatory
₹2,600
Executive Engineer RNb Dalgate DIvision Sgr
₹2.6 L
25 Jul 2026
7 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 63.78 | Cum | 217.67 | ₹13,882.99 |
| 2 | Supplying and laying of Nallah Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. | 25.51 | Cum | 847.45 | ₹21,618.45 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 12.76 | Cum | 4,409.24 | ₹56,261.9 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 16.84 | Cum | 5,585.81 | ₹94,065.04 |
| 5 | Providing and fixing of flooring with cobble stone of approx size 125 x 125 x 75 mm (thick) laid on 25 mm avg thick cement mortar (1:3) 1 cement, 3 sand and jointed withg grey cement slurry mixed with pigment to match the shade of the stone laid in approved pattern complete in all respects as per the direction of engineer incharge. | 167.29 | Sqm | 2,627.11 | ₹4,39,489.23 |
| 6 | Carriage of materials from source to site by mechanical transport including loading, unloading. | - | - | - | - |
| 7 | a) Stone aggregate below 40mm nominal size for an avg. lead of 15 Kms. | 11.35 | Cum | 291.94 | ₹3,313.52 |
| 8 | b) Stone aggregate below 40mm nominal size for an avg. lead of 15 Kms. | 14.98 | Cum | 291.94 | ₹4,373.26 |
| 9 | c) Sand for an avg. lead of 15 Kms. | 13.31 | Cum | 291.94 | ₹3,885.72 |
| 10 | Providing and fixing of KHATAM BANDI ceiling of first class budloo/fir wood excluding the cost of frame work which is to be paid separately. Paanch Murabah. | 13.94 | Sqm | 3,009.24 | ₹41,948.81 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1020412.xls
BOQ • 0.45 MB
ExtNit26greenpark2.pdf
PDF • 0.87 MB
EXt26.pdf
PDF • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .