Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance | L1 | Accepted-Finance qualified | |
| 2 | L2₹9.7 L+₹3,400.70 (0.35%)Rejected-Finance | L2 | Rejected-Finance not qualified | |
| 3 | L3₹9.7 L+₹4,858.15 (0.50%)Rejected-Finance | L3 | Rejected-Finance not qualified | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others- five Pending List not atteached |
Tender Value
₹9.7 L
EMD Value
₹97,163
Closing Date
14 Aug 2026, 3:00 pmClosed
c.e office
c. e. office kanpur nagar motijheel
zone-01 ward-71 ke antaragt 105/696 saray Compound me Abrara Advocated ke makan se Haji Inayat ke Makan Tak Gali Ka Sudhar Ka Karya
2026_NNKAN_1175878_1
56/AA-1/2026-27
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,163
Yes
21 Oct 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Concrete /R.C.C Work | 72 | cum | 7,160 | ₹5,15,520 |
| 1.02 | earth work | - | cum | 170 | - |
| 1.03 | Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. | 1 | cum | 6,600 | ₹6,593.4 |
| 1.04 | Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 240 | sqm | 67 | ₹16,080 |
| 1.05 | Construction of granual sub base (GSB) with well graded materails in uniform layer etc all complete. | 48 | cum | 3,671 | ₹1,76,208 |
| 1.06 | Construction of gullypit 0.60x0.60x0.75 as per KNN design etc all work | 5 | nos | 5,180 | ₹25,900 |
| 1.07 | Non SOR | 20 | Each | 704 | ₹14,080 |
| 1.08 | Extra Providing chemical hardner for hard surface etc all comp. | 480 | sqm | 96.25 | ₹46,200 |
| 1.09 | Non SOR-F31028-Non SOR-Cortage of Earth or Malvaup to 3 KM including all completion of work Cortage of Earth or Malvaup to 3 KM including all completion of work-Rate-116.96 per 1 Cum. | 90 | cum | 116.96 | ₹10,526.4 |
| 1.1 | 18@ gst | - | Tax | 1,48,214.59 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_2209754.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
BOQ_2209754.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .