Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -28.99% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹1,341.04 (0.61%)Admitted-Finance | -28.56% | ₹2.2 L+₹1,341.04 (0.61%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 L+₹5,863.14 (2.65%)Admitted-Finance | -27.11% | ₹2.3 L+₹5,863.14 (2.65%) | L3 | Admitted-Finance |
| 4 | L4₹2.3 L+₹7,921.47 (3.58%)Admitted-Finance | -26.45% | ₹2.3 L+₹7,921.47 (3.58%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 L+₹31,436.40 (14.2%)Admitted-Finance | -18.91% | ₹2.5 L+₹31,436.40 (14.2%) | L5 | Admitted-Finance |
Tender Value
₹3.1 L
EMD Value
₹6,240
Closing Date
1 Apr 2026, 6:00 pmClosed
Commissioner Municipal Council Jaisalmer
Commissioner Municipal Council Jaisalmer
Construction of Compound wall work at Desert Club Jaisalmer
2026_DLB_547042_8
Vikas/30/2025-26/5778/18.03.26
Open Tender
Civil Works
Percentage
60 days
Jaisalmer
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Commissioner Municipal Council Jaisalmer
₹6,240
Yes
1 May 2026
19 Mar 2026
2 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ urated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | - | CUM. | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | CUM. | - | - |
| 1.03 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM. | - | - |
| 1.04 | Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two stories. | - | cum. | - | - |
| 1.05 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/ Ruled pointing . | - | sqm. | - | - |
| 1.06 | Providing and Laying damp-proof course with cement concrete grade M-15 (1:2:4) mortar prepared with 1% solution of water-proof compound complete as per specification 50 mm thick. | - | sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
Tendernotice_2.pdf
PDF • 0.28 MB
BOQ_975485.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .