Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.7 LAccepted-AOC AT ROUTRAPUR P O KALAPADA DIST CUTTACK PIN 754112 | CUTTACK | CUTTACK | ODISHA | 754112 | ₹17.7 L Quoted ₹15.0 L | 1 | Accepted-AOC Awarded in Lottery |
| 2 | 2₹15.0 LRejected-Finance AT PO BARADA P S KISHORENAGAR DIST CUTTACK PIN 754131 | BARADA | CUTTACK | ODISHA | 754131 | ₹15.0 L | 2 | Rejected-Finance Through Lottery |
| 3 | 2₹15.0 LRejected-Finance AT ROUTRAPUR P O KALAPADA P S CUTTACK SADAR DIST CUTTACK PIN 754112 | CUTTACK | CUTTACK | ODISHA | 754112 | ₹15.0 L | 2 | Rejected-Finance Through Lottery |
| 4 | 2₹15.0 LRejected-Finance | ₹15.0 L | 2 | Rejected-Finance Through Lottery |
Tender Value
₹15.0 L
EMD Value
₹14,997
Closing Date
14 May 2026, 5:00 pmClosed
BDO Cuttack sadar
Block Office Cuttack sadar
Civil Works
2026_PRBCS_128690_1
BLKCUTTACK SADAR-01/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
150 days
Block Office Cuttack SADAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,997
Yes
Block Office Cuttack sadar
16 Aug 2026
2 May 2026
15 May 2026
2 May 2026
14 May 2026
2 May 2026
2 May 2026 - 14 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge. | 40.61 | Cum | 276.89 | ₹11,244.15 |
| 2 | Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes if any and all labour, T & P etc. all complete as per PW spesification & direction of Engineer-in- charge. | 48.4 | Cum | 607.78 | ₹29,413.97 |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes if any, and all labour involved for completion of item of work as per PW Specification & direction of Engineer- in - charge. | 10.41 | Cum | 6,454.35 | ₹67,157.58 |
| 4 | Fly Ash Brick masonry in cement (1:6) in foundation & plinth of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. | 5.09 | Cum | 5,566.6 | ₹28,313.52 |
| 5Fly Ash Brick masonry in cement (1:6) in superstructure of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. | |||||
| 5.1 | Ground Floor | 17.48 | Cum | 5,599.6 | ₹97,879.55 |
| 6Providing RCC M20 grade concrete ,lifting hoisting and lying asper approved drawing and design,specification using 20mm & down graded CBHG chips including centering and shuttering ,cost, conveyance,labour,t&p,cess,taxes if any etc all complete as per PW specification and direction of Er in Charge. | |||||
| 6.1 | Ground Floor | - | - | - | - |
| 6.11 | a) Column base | 13.88 | Cum | 6,883.67 | ₹95,526.95 |
| 6.12 | b) Plinth Bend | 3 | Cum | 7,753.67 | ₹23,248.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
ACRDeuli.pdf
Tender Documents • 0.81 MB
BOQ_589342.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].