Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹79.1 LAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder. |
Tender Value
₹88.3 L
EMD Value
₹1.1 L
Closing Date
4 May 2024, 5:00 pmClosed
SO (Civil), CHA
Office of AGM/CHA
Shifting of dumper repair shed from Padmapur workshop and installation at Bhatadi workshop at BOCM PSA of Chandrapur Area.
2024_WCL_306586_1
WCL_CHA_civil_eT-006
Open Tender
Civil Works - Others
Item Rate
90 days
PSA
As per NIT
5 documents required · 5 mandatory
₹1.1 L
29 Jul 2024
15 Apr 2024
6 May 2024
15 Apr 2024
4 May 2024
15 Apr 2024
15 Apr 2024 - 27 Apr 2024
Amount
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.80mm thick with zinc coating not less than 275gm/sqm
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in. Excavation/banking excavated or stacked materials. All kinds of soil.(92.55+249.75=342.30)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soil.
Transportation of structural steel & G.S. sheet of roofing by mechanical transport includind loading & unloading & stacking lead upto 10 km.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Providingsolingusing80mmsizetrapmetalin15cm.layerincludingfillingvoids with Crushed sand/grit, ramming, watering etc. complete.
Fixing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks bolts and nuts 8mm dia with bitumen and G.I. limpet washers or with G.I. limpet washer filled etc. all complate as per direction of engineer in charge(labour rate)
Fabrication & Errection structural steel work riveted, bolting or welding in built up sections, trusses and framed work, including cutting, hoisting, fixing in position etc. all complate(labour rate).
Painting with synthetic enamal paint of approved brand and manufacture to give an even shed old work one or more coats.
Total impact of GST for the purpose of CTC
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .